NBS Source
I'm a manufacturer

"channels gullies and gratings"

1,172 results found

Sort by:

Showing 217-221 of 221

Sponsored
The Corner, Darvel

The Corner, Darvel

Twinfix Limited

Twinfix, a leading provider of roofing and canopy solutions, has successfully completed the design, manufacturing, and installation of a 225sqm canopy at The Corner in Darvel. This project, in collaboration with the Darvel & Area Regeneration Team (DART) and Coltart Construction, showcases Twinfix’s expertise in creating striking structures that seamlessly integrate with the surrounding environment.Twinfix was entrusted with the task of designing a canopy that not only provided aesthetic appeal but also met stringent safety requirements.When liaising with Coltart Contracts on the requirement of the free-standing pyramid canopy, the large size of the structure needed to be considered. Tiered panels were included in the design and a frame manufactured in galvanised steel, which has a high strength to weight ratio was requested. The Galvanisation process protects the metal, while adding colour through powder-coating provides an additional element of protection from rust extending the structure’s life span. The Multi-Link-Panel Non-Fragile roofing system, known for its robustness and ability to transmit natural light, was meticulously integrated into the design, offering visitors a safe and visually pleasing experience.Twinfix’s skilled team then commenced the manufacturing process, using state-of-the-art equipment and adhering to rigorous quality control measures. The components were crafted with precision to meet exact specifications, ensuring a flawless end result.The Twinfix-designed canopy at The Corner brings a host of benefits to the project and the local community. It not only enhances safety but also adds to the aesthetic appeal of the town, transforming it into an inviting space. The versatile 225sqm canopy provides a hub for community gatherings, meetings, and local markets, aligning with DART’s vision for the development of the area.Steve Gillies, Treasurer at DART, expressed his satisfaction with the project, stating, “The Twinfix canopy has exceeded our expectations, providing a safe and visually striking space for our community to come together. We are delighted with the outcome and grateful for Twinfix’s expertise and dedication throughout the process.”The completion of this project further solidifies Twinfix’s reputation as an industry leader in innovative roofing and canopy solutions. Their commitment to excellence and ability to tailor designs to meet unique client requirements have made them a preferred choice for projects of all scales.
Sponsored
Tormarton Village Hall

Tormarton Village Hall

Gerflor Flooring UK Limited

When the idyllic village of Tormarton nestled in the Cotswolds wanted to transform the main room in their village hall, the committee responsible for organising and specifying a replacement floor would choose Taraflex® Multi-Use from international flooring specialist Gerflor.Tormarton has a population of about 350 people from a wide variety of backgrounds. At the centre of village life is the parish hall which provides a blank canvass for a raft of local community activities.Stewart Waters, Chair of the Tormarton Parish Council commented, “We specified Gerflor Taraflex® Multi-Use indoor sports surface as it would cater for a variety of needs. The new Taraflex® sports vinyl floor is much easier to maintain and clean and so much brighter than the old, dated tiles.”Commenting on the project Chris Pursey, Gerflor Area Sales Specification Manager, Southwest & Channel Islands said,” The existing subfloor consisted of old vinyl tiles, which although were well bonded to the substrate, presented a health and safety risk if removed due to possible presence of asbestos.” Chris Pursey added, “For this reason, we specified that the installation should ideally be over an Isolsport membrane, which left the tiles undisturbed and also enabled the installation to be done quickly with minimal floor preparation.”Stewart Waters ended by saying, “We have had lots of positive comments and all parties are really pleased with the refurbishment. We would definitely choose Gerflor flooring again.”Taraflex® sports flooring has been fitted at every Olympic Games since 1976. Approved by many National and International governing bodies as a world class sports surface, it is also widely installed within the education, community, leisure, health, and fitness sectors.
Sponsored
Waterproofing the London School of Economics

Waterproofing the London School of Economics

Newton Waterproofing Systems

In April 2016, the world-renowned London School of Economics announced that Grafton Architects were to design their next major project. The Marshall Building at 44 Lincoln’s Inn Fields, built by Mace Group, includes an extensive two-storey, mixed-use basement that will house plant areas, squash courts, changing facilities and a sports hall, covering a total of over 2,250m2 of floorspace and presenting quite the project for Newton Specialist Contractor Cast Contracting Ltd (CCL).Newton Specialist Contractor CCL were appointed to design, supply and install the waterproofing by principal contractor Mace Group in late 2019.To provide a completely dry, guaranteed solution on such a high profile project, CCL recommended the Newton CDM System.Otherwise known as Type C waterproofing, the CDM System is the safest and most reliable form of waterproofing.Prior to installation, CCL applied Newton 906 Lime Inhibitor to the new slab to prevent free lime from the concrete from affecting the drainage membranes. The Type A liquid waterproofing membrane Newton 103-S was also applied internally to many of the concrete surfaces as a barrier to water.With preparations complete, over 2,250m2 of Newton 520 eco membrane was installed to the floor and over 570m2 of Newton 508 membrane installed to the walls to create the Newton CDM System. A drainage system of Newton Basedrain channels also directs any water captured by the membranes to the point of discharge, and the whole system was sealed with Newton OverTape.Despite requiring dedicated delivery slots, and working to an extremely tight program of work, CCL were praised on the quality and speed of their installation, which was completed well within the time limit.The Newton recycling service was also a great success, recycling 115 kg of HDPE waste and therefore preventing over 132 kg of CO2 emissions.
Sponsored
Lambeth Council pioneers the bikehangar rental scheme

Lambeth Council pioneers the bikehangar rental scheme

Cyclehoop

Our specially developed Bikehangars were first ordered by Lambeth Council and installed on their streets in February 2013. Each Bikehangar provides six spaces to securely store bicycles with each space available for residents to rent.Our award-winning design is an effective way to protect bikes from theft and tough weather conditions where outdoor storage space is limited. This made the Bikehangar an ideal solution for Lambeth Council to offer its residents, most of who live in small flats where space is at a premium.The success of the scheme over the years has resulted in a further 200 Bikehangars being installed throughout the borough (as of July 2016) providing 1,200 secure cycle parking spaces. The success of the Bikehangar scheme in Lambeth and the increasing demand for on-street cycle parking from residents of other boroughs have seen our Bikehangars installed throughout the UK. Cyclehoop currently works with 75 councils UK wide, having produced over 2,000 Bikehangars providing a total of 12,000 secure cycle parking spaces.“The Bikehangar scheme has been a great addition to Lambeth streets. It is a much-cherished council service, popularity of which greatly exceeded our expectations. Almost every hangar we installed is oversubscribed and we cannot keep up with the demand to install additional units. The convenience, safety and reliability of this cycle parking solution has been demonstrated by popularity of the 220 units installed throughout the borough to date, the very low damage and vandalism rate and none reported bike theft. Local Police, councillors and residents are all in love with Lambeth Bikehangars. It has proven to be a crucial service in enabling our residents to use a cycle as their transport mode.” – Pawel Ryczan, Cycle Parking Project Manager, Lambeth Council“The service offered by Cyclehoop was not only efficient and professional but the whole experience was personable and friendly. We are so grateful for our Bikehangar as the area is not safe for leaving bikes outside and we don’t have a lift so it has been so much hassle keeping two bikes inside the flat. The service we received has been exceptional and there’s a real sense of customer care that is very hard to come by. 10/10.”– Bikehangar Rental Scheme Customer, London
Sponsored
The 'Supreme' Electric ladder lives up to its name

The 'Supreme' Electric ladder lives up to its name

Premier Loft Ladders Ltd

Electric loft ladders offer a superb solution for easy access to loft spaces. Especially for rooms with a very high ceiling, such as this property in Edinburgh.The challenge…Premier Loft Ladders received an enquiry from Magnus in Edinburgh who discovered the loft access specialist through an internet search. Magnus’ goal was to purchase a sturdy retractable ladder as part of a larger project; altering the loft space to function as a study, separate from the living area below.The ladder had to offer reliable, safe access to and from the loft whilst bearing in mind a high ceiling of 3.5 metres with restricted space for the ladder to deploy when opening. Ease of operation was also of great importance to Magnus so that deploying and stowing the ladder away could be made as effortless as possible.The Solution…With a heavy-duty aluminium structure and space saving qualities, the Supreme Electric from Premier Loft Ladders was chosen for this application.The Supreme Electric comes with a reliable motor, hard wired to the main supply via a control box and backup battery so it can be deployed and retracted effortlessly with the push of a button! Hard wired switches were also supplied, one on the landing and one in the loft area next to the opening so the ladder can be operated from above and below.The ladder itself features large treads (140mm deep) and a telescopic hand rail as standard, with an additional handrail added for this specific application providing safe, easy access to and from the loft.Installation Challenges…After the Supreme Electric ladder had been installed, there was found to be an issue preventing it from operating automatically. During this time Magnus could still use the ladder manually, thanks to the override option and counterbalance spring design.We worked with Magnus and his electrician to try and resolve the issue. This included checking warning indicators and working through a trouble-shooting guide. Unfortunately, it was not possible to fully diagnose the problem.As such, we sent replacement components for the ladder which were successfully installed by a different firm to the original installation team. After this the ladder operated perfectly, for which Magnus was very grateful.The results…A perfect solution was achieved for Magnus. The Supreme Electric ladder was positioned comfortably in the available space and gave him a safe, reliable access to and from the loft.

Showing 217-221 of 221

Feedback