NBS Source
I'm a manufacturer

"radiation shielding fire bricks"

6,671 results found

Sort by:

Showing 181-216 of 944

Sponsored
Platform Lift for Fire Station

Platform Lift for Fire Station

CIBES Lift UK

This colourful Cibes A5000 platform lift is installed in an old fire station in Falun, Sweden.
Sponsored
Strategic Partnership with Willmott Dixon

Strategic Partnership with Willmott Dixon

Fire & Acoustic Seals Ltd

We’ve been a strategic partner with Willmott Dixon for several years now, ever since our Fire Door FoamTM was mandated on their ‘Yellow Book platform’.  The online manual exists to enable their staff and supply chain partners to use verified products on their projects. To meet their careful criteria we had to demonstrate the foam’s high-performance fire-stopping capabilities when installed between different substrates and timber fire doorsets.  As such a safety-critical component, we also had to provide its third-party test certification from Certifire, IFC and Warringtonfire to assure them of its credentials.Ryan Atkinson, Senior Strategic Buyer at Willmott Dixon comments“Fire and Acoustic Seals Fire Door FoamTM is now listed on our ‘Yellow Book platform’ – Willmott Dixon’s online guide to preferred materials, site installation and workmanship best practice. The foam went through our rigorous diligence checks to ensure it meets the set criteria required to become a specified product in the guide and to become a key component of the Willmott Dixon standard kit of parts. This product represented a rounded view of quality, cost and time which are some of the key factors we consider when selecting products for our ‘Brand Standard’.”Our Fire Door FoamTM has since been used on many Willmott Dixon projects across the UK. One of these is the high-profile Perry Barr Residential Scheme in Birmingham which will provide 1,400 much needed new homes in the city when complete.Ashley Devonport, Senior Quality Manager at Willmott Dixon comments“Fire and Acoustic Seals Fire Door FoamTM has been used to seal the gaps between the door and substrates on the apartments, risers, and communal areas on the prestigious Perry Barr Residential Scheme. This product is mandated on our Yellow Book platform and was selected for its excellent fire-proofing properties and independent test evidence. Julian and the team also provided excellent product training and speedy technical support when needed.”Contact the team for more information about Fire Door FoamTM. 0121 521 2179 | sales@fireandacousticseals.co.uk 
Sponsored
Taking the right steps to combat fire

Taking the right steps to combat fire

Premier Loft Ladders Ltd

A fire rated loft hatch and ladder provides safe and convenient access into a loft or attic, while still providing up to 120 minutes of fire resistance. It can also provide high levels of thermal insulation and therefore help to keep energy costs down. Premier Loft Ladders has released an application solution guide for fire rated loft ladders. It provides useful tips and advice on subjects such as the choice between aluminium or wooden fire rated loft ladders, as well as considerations such as thermal insulation and strength. You can also find details of their fire rated product range.
Sponsored
AOV for Smoke and Fire Safety

AOV for Smoke and Fire Safety

Surespan

Product:Surespan 140° thermally broken aluminium smoke ventilator and roof hatch designed to EN12101-2. ]The AOV also offers push-button comfort ventilation in one package! This one-stop solution for smoke vent requirements to meet building control can achieve 1m² airflow and is available in standard stocked sizes or made to any size in between 900 x 900 and 1260 x 1260. Wind deflectors to improve airflow. RE 1,000 Ventilation 10,000 Vent Offset mechanism for Roof Access Snow Load SL500 Wind Load WL1500 Temperature Class T (-15°) Fire Resistance B300
Sponsored
DRU Metro designer gas fires are centrepiece of luxury north London town houses

DRU Metro designer gas fires are centrepiece of luxury north London town houses

DRU Fires

O1A Architects oversaw the conversion of a former Gordon Ramsay restaurant in Islington into two luxury town houses with roof gardens and many unique features. O1A chose DRU Metro 100XT/2 corner gas fires for the main living areas in the properties. They utilise the balanced flue system to be flexibly located anywhere in the building without the need for a chimney. False chimneybreasts have been created in each property to house the impressive log-effect fireplaces. They also accommodate the flat screen TVs making perfect focal points and conceal the concentric flues, which exit the building through the roof.
Sponsored
The Auditorium at the Fire Station - Sunderland

The Auditorium at the Fire Station - Sunderland

Vox Ignis Limited

The £11 million Auditorium at the Fire Station is a new live music and events venue in the heart of Sunderland city centre, developed by the Music, Arts and Culture (MAC) Trust, that required an Emergency Voice Communication System (EVCS). Officially opened by His Royal Highness Prince William and Catherine, Princess of Wales in 2018, the project forms a key component in the masterplan for the city’s Music and Cultural Quarter, built around the refurbished Dun Cow pub and the recently renovated adjacent Engine Room at the Fire Station.Products used - Lexicomm Network disabled refuge system, including integrated emergency assistance alarm.
Sponsored
Turning traditional brickwork on its head to deliver a stunning, award-winning luxury home

Turning traditional brickwork on its head to deliver a stunning, award-winning luxury home

Vandersanden Brick

An award-winning, luxury home in the beautiful Hampshire countryside, 4 Views is designed to make the most of its location, also makes its own bold statement thanks to an imaginative combination of materials, including lass, timber and bricks created by the innovation-led, manufacturer, Vandersanden. A remarkable new build with a distinctive architectural design from Winchester-based firm, AR Design Studio, 4 Views incorporates Dark Vandersanden Morvan brickwork which creates tonal contrast with cedar cladding and floor to ceiling glass doors and windows to set this home apart, giving it a balanced, calm identity, at one with the landscape.To find out more about the bricks used in this project or to see the wide range of high-quality bricks available from Vandersanden, click on the 'View more' link 
Sponsored
Kingston University - The Town House

Kingston University - The Town House

Michelmersh Brick Holdings PLC

Kingston University was created as a way to transform the universities presence within the community and to foster a collaborative spirit between different disciplines with the construction of a modern library and performance space. The building is designed to feel open and calming with the idea of welcoming the community into the area with large, clear spaces allowing for appreciation of the collaborative spirit from the streets that overlook the project.Michelmersh’s Freshfield Lane First Quality Multi Bricks are used in colonnades that beautifully showcase the quality of the product and allow for space to be enforced amongst the 6 stories of the building. The value of social cohesion and the spirit of learning were captured through careful and dynamic design by Grafton architects, who are responsible for creating a space that marries together home, belonging and quiet contemplation.Kinston Universities “Town House” was recently awarded the RIBA Stirling award.
Sponsored
Scottish Policy on Unwanted Fire Alarm Signals

Scottish Policy on Unwanted Fire Alarm Signals

Safety Technology International Ltd

The Scottish Fire and Rescue Service (SFRS) have announced their new policy on Unwanted Fire Alarm Signals (UFAS) that came into effect at the start of this month.The policy affects all calls to the fire control operators who will confirm a fire before the incident requires the fire service to be dispatched.Scotland have a continuously high rate of false alarms attended by the Scottish Fire and Rescue Service, with over 57,000 unnecessary journeys a year. This is why the new policy adopts a ‘call challenge’ policy to reduce the number of false fire alarms attended by the service.False fire alarms cause disruption in various ways, from impacting the time and resources of fire and rescue services, implicating people’s safety and harmfully impacting the environment. False alarms are also costly procedures, not only for the Fire Service but also businesses where the false alarm takes place.These UFAS have many detrimental effects:They impact on resources available to attend real fires.They impact on time available for other valuable work, such as training and community safety activities. Where fire crews comprise on-call (retained) fire fighters, the crews may be unnecessarily taken away from their place of work.They impact on road safety, as a result of fire appliances travelling under emergency conditions.They impact on the environment from the number of appliance journeys. The new guidance on safe investigation of unwanted fire alarm signals aims to challenge calls to confirm fire or signs of fire in order to ensure resources and time are being used effectively. However, the SFRS will continue to attend calls received from automatic fire alarm systems and if the signal has been initiated by a manual call point (MCP), heat or smoke detector or sprinkler system, in premises in which people sleep. There will also be fire service attendance in non-sleeping risks if there is physical signs or technological indication of a real fire, such as the fire alarm signal triggered by a manual call point.Although the policy will significantly reduce the number of false alarms attended by fire crews, there is still more to be done to decrease the vast number of unnecessary call outs.Protective covers from STI help to reduce both malicious and accidental activations of manual call points, available in various sizes, mounting options and custom text available to suit all applications. The tough polycarbonate covers have been specifically designed to help deter false alarms and prevent vandalism of various devices. The range of Call Point Protectors are highly effective without restricting legitimate operation of the devices, meaning they are easily accessed in emergency situations.For more information on the new policy, visit the FIA website here: https://www.fia.uk.com/news/guidance-on-safe-investigation-of-fire-alarm-signals-in-scotland.html?utm_source=Fire%20Industry%20Association&utm_medium=email&utm_campaign=14001136_June%202023%20MMU
Sponsored
New Product  - Fire Rated Overbox

New Product - Fire Rated Overbox

Trade Access Panels

Due to a high demand from our valued customers, we are proud to announce the latest product to our range - electric meter cover. Our Fire Rated Overboxes are a retrofit solution for keeping your gas and electrical meters safe from fire and tamper. These are ideally suited for refurbishment and newbuild products for multi-occupancy properties such as apartment blocks.
Sponsored
Adelphi Wharf Case Study

Adelphi Wharf Case Study

PFC Corofil Fire Stop Products

To meet the fire stopping requirements for a major new residential development in Salford, PFC Corofil has provided a proven range of fire-stopping insulation systems.
Sponsored
Fire Escape Hatches - Under Ground Metro, Portugal

Fire Escape Hatches - Under Ground Metro, Portugal

Surespan

Project:Surespan manufactured and supplied a series of fire escape hatches at Portugal’s €950 million underground Metro in Porto. The huge double-leaf hatches automatically open if the fire alarm system is activated to allow passengers safe exit to ground level. In addition, they can be manually opened with the touch of a button. This project was undertaken after Surespan successfully carried out similar work at Athens Metro.
Sponsored
Fortis Quay Case Study

Fortis Quay Case Study

PFC Corofil Fire Stop Products

PFC Corofil’s proven range of fire-stopping insulation systems form part of the façade system and will maintain fire compartmentation at a stylish new high-rise residential development in Manchester.
Sponsored
Sto Insulation and Brick Slips Brings Pocket Living to Barking

Sto Insulation and Brick Slips Brings Pocket Living to Barking

Sto Ltd

A unique residential Pocket Living development recently completed in Barking features highly effective thermal performance and an attractive appearance thanks to an integrated package of insulation and exterior façade products provided by Sto. The company’s StoTherm Mineral external wall insulation system, with Sto-Rotofix Plus fixings and StoCleyer B Brick Slip façade finish, have all been installed on this town-centre project at Whiting Avenue.
Sponsored
Bodmin Community Fire Station

Bodmin Community Fire Station

Gerflor Flooring UK Limited

When Bodmin Community Fire Station in Cornwall needed a hardwearing, hygienic, and safe flooring solution for their fitness room and gym, they turned to international flooring specialists Gerflor. Its’ Taraflex® sports flooring was supplied and would deliver to the highest standards required by the site users. In acknowledgement of the brave and hard work of Cornwall Fire Service crews, Gerflor donated 60m2 of this world-renowned sports flooring in the colour ‘Red’.
Sponsored
Local Crescent Case Study

Local Crescent Case Study

PFC Corofil Fire Stop Products

For a major new residential development in the Salford area of Greater Manchester, PFC Corofil has provided a proven range of fire-stopping insulation systems as part of the façade system and to maintain fire compartmentation of the buildings.
Sponsored
P+HS Architects specifies Vandersanden for modern aesthetic at new North London care home

P+HS Architects specifies Vandersanden for modern aesthetic at new North London care home

Vandersanden Brick

Hammerson House is a large, new, innovative care home in the Hampstead Garden Suburb area of London that “will set a new standard of care for the future”, according to its owners, Nightingale Hammerson. The design reflects a luxurious hotel aesthetic rather than that of a traditional care home facility with the development featuring Ledbury hand-formed, facing bricks from Vandersanden. Renowned for their high quality, crafted appearance and texture, these multi-coloured bricks both accentuate the building’s contemporary look and also bring an attractive, natural softness to its facade.Nightingale Hammerson has served the Jewish community for over 180 years as a leading specialist in residential, nursing and palliative care. Located on Bishops Avenue and completed in Spring 2021, the Charity’s Hammerson House development offers 116 bedrooms in a modern, forward-thinking scheme. The building is balanced by two matching wings at its front and rear, with the design centred around the principles of ‘households’. This involves clusters of bedrooms for residents with supporting facilities on a domestic scale, allowing them to socialise in small groups, but then move easily to larger spaces for group activities, if they wish.The setting for Hammerson House is certainly more rural than urban, withdrawn from the avenue, in beautifully landscaped gardens, surrounded by trees. The design takes full advantage of this verdant context with the shape of the building, offering expansive views of the trees and gardens through large, rectangular glazing at multiple points.P+HS Architects developed the design from RIBA Stage 3 and specified the use of Vandersanden’s Ledbury brick, with its varied tones and texture, to ensure that Hammerson House embodies the look and feel of a luxurious hotel that fits naturally within these surroundings.“We developed a series of palette options which reflected a varied response to the client’s vision,” says Cath Lake, Director at P+HS Architects. “The softer, more rustic approach offered by the Ledbury brick, ultimately, became the client’s preferred option. As a practice, we are focused on creating positive environments for long and short-term support and care and Hammerson House will do just that. Vandersanden’s Ledbury brick has enabled us to meet the distinctive, high quality design vision within budget and the client is delighted with the result.”Ledbury is a high quality, multi-coloured brick with a sand-coated and creased structure. The base yellow colour of the brick is augmented by hues of brown, white, blue and anthracite which help to soften the Hammerson House facade as well as the covered accessible walkway at the building’s entrance. The overall effect is to sit the building comfortably, attractively and organically within its environment.To find out more about the bricks used in this project or to see the wide range of high-quality bricks available from Vandersanden, click on the 'View more' link .
Sponsored
Bronglais Hospital Aberystwyth

Bronglais Hospital Aberystwyth

Raybloc (X-Ray Protection) Ltd

Raybloc (X-ray Protection) Ltd is proud to present a case study highlighting our exceptional collaboration with Bronglais Hospital in Aberystwyth.Our partnership involved the manufacturing and supply of top-of-the-line radiation shielding solutions that included Frameless Operator Screens, lacquered veneer finish lead-lined doorsets, PVC encapsulated lead-lined doorsets with astragal meeting stiles, and a window door combination set. As well as these fixings, Raybloc also supplied and installed the lead-lined boards for lining the walls and ceilings to create a complete radiation protective barrier between the controlled areas and their surroundings.These cutting-edge products have not only prioritised patient and staff safety but have also significantly contributed to optimising workflow efficiency and creating a healing environment.
Sponsored
Fire Rated Roof Hatch - Killeen, Texas

Fire Rated Roof Hatch - Killeen, Texas

Surespan

Surespan designed and manufactured several fire-rated roof hatches for the Killeen ISD East/West Ward Elementary School, in Killeen Texas.  The Project:Huckabee is the architect behind the East/West Ward Elementary School, tasked with replacing two 60-year-old campuses, by combining them into one new holistic learning environment. The planning behind the architecture focuses on efficiency, function and ease of wayfinding. From simple to navigate corridors, modernised classrooms and glazing to illuminate the interior with natural light. East/West Ward Elementary School blends district design standards with innovative thinking to achieve spacial efficiency and maintain equitability.Product:Surespan designed and manufactured five 35.5-inch x 35.5-inch Fire Rated Roof Hatch with an integral guard hand railing attached. These hatches are thermally broken and have been designed and tested with 4-hour fire resistance for integrity to EN 1634-1:2014.  Features:These hatches are using environmentally friendly materials such as non-combustible minerals and fireboard cladding to achieve a top-performing thermal efficiency. All the hatches were finished in a light grey polyester powder-coated finish for an aesthetically pleasing solution. The coating is set to last many years, just like the durable masonry veneer that is featured in the building, helping to maintain the space for years to come. 
Sponsored
Viking House, Lincoln using Ibstock's Mechslip - mechanically fixed cladding system

Viking House, Lincoln using Ibstock's Mechslip - mechanically fixed cladding system

Ibstock Brick Ltd

Durability, safety and aesthetics needed to work together for the Viking House project. With the refurbishment nestled among conventionally built brick buildings there was a need for a contemporary look that mirrored the local vernacular. Viking House, a managed student accommodation at the University of Lincoln made up of three five-storey buildings and standing 20m tall, was designed to reflect the university’s continuing progress. Mechslip was chosen along with Ibstock’s Leicester Red facing bricks, due to its A1 rated non-combustible to EN13501-1 standards making it the ideal choice for a modern high-rise structure.
Sponsored
What The Real Cost Of Fire Protection Means In Buildings

What The Real Cost Of Fire Protection Means In Buildings

Trade Access Panels

When you design a building that will be used by lots of people, like a tower block, you need to make sure that the building has the correct level of fire prevention and fire protection equipment. In instances where this isn’t the case, tragedies like the Grenfell Fire can happen. The importance of passive and active fire protection methods are vital for the safety of the intended occupants, but how can you ensure they’re going to be safe?
Sponsored
Assured fire safety depends on sticking with a quality specification

Assured fire safety depends on sticking with a quality specification

Promat UK

Dame Judith Hackitt’s assertion that the building industry routinely puts cost before quality will come as no surprise to architects and contractors who often see their specifications being challenged, and changed, just to save a few pounds. ‘Value engineering’ has become synonymous with an industry obsessed seeking to do everything at the lowest possible cost. Fire rated glass, framing materials and other components must be evaluated and scrutinised at the product specification stage. Once specified, passive fire protection products must stay specified, as the slightest change to the specification can compromise the expected level of fire resistance.
Sponsored
Door Step and Below Door Ventilation

Door Step and Below Door Ventilation

Cast Iron Air Brick Company

Looking down for architectural features in any Georgian town and as well as coal hole covers, manholes and the like you'll see all manner of air bricks and grilles, mostly for sub floor ventilation in property walls. Here is an illustration of a cast iron vent underneath a front door in Regency Bath. Like many it's in a pretty poor state. This one's patched up with steel plate and it's suffocating, what is a key part of the ground floor causing damp. Prevent damp in period property basements and below suspended floors...
Sponsored
York Minster Smoke Curtain Barriers

York Minster Smoke Curtain Barriers

Coopers Fire Ltd

From the Tower of London to The Royal Palaces, Coopers is trusted to install fire and smoke curtains barriers for some of the world’s most iconic heritage buildings. With this knowledge, appointed architects Arrol & Snell assigned Coopers to develop a system that would help protect the cathedral’s Undercroft and Treasury from smoke migration in the event of a fire. The smoke barrier system had to allow visitors to exit the Undercroft and Treasury safely, whilst preventing smoke from entering the main body of the cathedral, but any system had to be sympathetic to its unique and ancient architecture.
Sponsored
Fire Safety Balcony Remediation in Poole, Dorset

Fire Safety Balcony Remediation in Poole, Dorset

AliDeck

The AliDeck System has rapidly become the de facto standard choice for balcony fire safety remediation projects. With our large range of non-combustible aluminium decking boards, joists, and pedestals our products offer practical and cost-effective solutions for any conceivable balcony refurbishment works.
Sponsored
Siberian Larch Cladding for Lymm Fire Station

Siberian Larch Cladding for Lymm Fire Station

International Timber

The building of a new fire station and safety centre in Lymm was part of a comprehensive plan to improve response times across Cheshire, Halton and Warrington.
Sponsored
Supply chain scrutiny key to minimising fire door risks

Supply chain scrutiny key to minimising fire door risks

Promat UK

The Hackitt Review has brought to the broader public attention the myriad of standards and testing or assessment methods that specifiers and the fire protection sector has had to carefully navigate for many years. And whilst the debate continues about the best way forward in respect of specific applications, one positive step that fire door manufacturers can take right now is to go back to basics and check whether their supply chain for fire resisting components is opening the door to risk.Fire resistant products like fire rated glass, intumescents and core materials are composed to precise specifications.
Sponsored
Folding shutters at Deptford Fire Station

Folding shutters at Deptford Fire Station

Bolton Gate Company

Deptford Fire Station is a Grade II listed building in Lewisham having been originally constructed in 1903. Bolton Gate supplied the folding appliance bay doors in the 1960’s and although still functional after fifty years, they were in need of replacement due to frequent usage. Since the building is listed, every effort was required to replace the doors on a like for like basis and Bolton Gate were engaged to supply new folding shutters to the same design which were installed and handed over recently. This is the latest in a list of several fire station contracts undertaken in London.
Sponsored
False Fire Alarms Continue to Cost the UK

False Fire Alarms Continue to Cost the UK

Safety Technology International Ltd

False fire alarm numbers continue to rise post-pandemic causing major issues for the economy by wasting vital time and resources.The latest Home Office figures from year ending September 2022 reveal fire and rescue services attended 238,885 fire false alarms, the largest total of false fire alarms in over a decade, an increase of 10% compared with the previous year.With an 18% increase from the previous year for malicious false fire alarms, 6,473 false alarms were determined, the number still rising post-COVID.False fire alarms continue to be the largest proportion of incidents attended at 38% and so it is increasingly important to minimise false alarms to ensure both the safety of individuals and the efficient use of emergency services.A teenager was arrested in Aberdeen after setting off fire alarms more than a dozen times, which police investigated as ‘deliberate and malicious’. Firefighters attended calls and wasted time and resources, meaning they could not respond to real emergency calls.False alarms are costly and disruptive, amounting to around £1 billion a year for the UK they often require emergency responders to mobilise and respond to a non-existent emergency, wasting resources and time.False fire alarms can be costly for building owners with fines introduced for repeated false alarms from emergency services, as they may have to attend multiple times, causing a drain on resources that could be better used elsewhere.They can also cause panic and confusion, particularly if they occur frequently, making it harder for people to take the necessary steps to evacuate safely in the event of a real fire. Frequent false alarms can lead to complacency among building occupants, who may not take real fire alarms seriously, potentially putting themselves and others at risk.Firefighters attended false alarms a considerable number of times at Basset Lodge, an independent living facility for many elderly and disabled people. False fire alarms are not only disruptive for staff and residents, but also pose a risk to their safety, and place additional strain on fire and rescue services. These repeated false alarms can lead to complacency in the public, lowering the sense of urgency in real evacuations.Protective covers can help to control the number of accidental and malicious fire alarms, but there are many ways in which you can reduce false alarms, for example regularly checking and testing equipment to ensure it is not faulty is one approach to preventing unnecessary risk for the fire department and public from false alarms.As the original call point cover manufacturer, Safety Technology International manufacture tough covers have been specifically designed to help deter false fire alarms and to prevent malicious or accidental activation of manual call points. The strong, durable construction of our polycarbonate call point protectors means they can withstand the toughest knocks, whilst offering lasting protection against false fire alarms. With various models available in a range of sizes and colours, and multi-language or custom text options, we have covers suitable for most applications or devices. Sounder models help to deter malicious activations with an audible alarm that draws immediate attention to the area. Waterproof models also allow for outside application, protecting devices and manual call points against the ingress of dust or water.
Sponsored
GREAT MOSQUE OF MECCA TUNNELS, MECCA, SAUDI ARABIA

GREAT MOSQUE OF MECCA TUNNELS, MECCA, SAUDI ARABIA

Coopers Fire Ltd

oopers Fire embarked on a transformative project to bolster fire safety measures within the intricate network of tunnels beneath the Great Mosque of Mecca, revered as Al-Masjid al-Haram. Given the significant foot traffic, particularly during the Hajj pilgrimage, the need for robust fire safety infrastructure was paramount.Drawing on its legacy of innovation, Coopers Fire engineered a suite of advanced smoke curtains tailored to the unique requirements of the Mecca Tunnels project. These cutting-edge solutions, including the SmokeStop D600A Smoke Curtains, were meticulously designed to seamlessly integrate with the tunnels’ architecture while ensuring optimal functionality.
Sponsored
Smart Fire Prevention System Installed in Luxury Apartments

Smart Fire Prevention System Installed in Luxury Apartments

Firechief Global

One Crown Place is the latest high rise addition to London’s skyline. Home to 246 luxury apartments, high-quality office space, a boutique hotel and members’ club, it is located between the City of London and Shoreditch. Designed by internationally renowned architects Kohn Pederson Fox (KPF), the development features two prismatic towers of 28 and 33 storeys.For the apartments, interior designers, Bowler James Brindley specified custom designed kitchens by Italian company Arclinea featuring a dark lacquered finish with engineered stone worktops and glass fronted cabinets.The Fire regulations which apply to high-rise living accommodation meant that the open plan kitchens in each apartment would require a fire suppression unit complete with sprinklers to be fitted. These units need to be installed and maintained by a specialist engineer and can also cause damage within a property should they be activated due to a fire.  Therefore, the team of architects, designers and builders were open to the idea of an alternative, unobtrusive design-led fire prevention solution, such as the Firechief Kitchen Stove Guard.
Sponsored
Vandersanden publishes Collective Well-being 2021 report

Vandersanden publishes Collective Well-being 2021 report

Vandersanden Brick

Rudi Peeters, new CEO of Vandersanden: “Collective Well-being is the reason why I came to Vandersanden”Vandersanden launches its Collective Well-being 2021 report. In this report, Vandersanden provides a transparent annual overview of its efforts and results in terms of sustainability across four areas: the environment, the (construction) industry, its own employees and the community. The past year’s performance shows once again that Vandersanden is on the right track towards CO2-neutrality by 2050.In recent years, Vandersanden has already taken huge strides in the field of sustainability, and time did not stand still in 2021 either. In its new report, Vandersanden provides an overview of its ambitions and concrete achievements of the past year. In 2021, Vandersanden was able to boast its first Great Place to Work certification in four countries, as well as ECO packaging with at least 30% recycled material and 80% less ink, which results in 400,000 kg less CO2 each year. In addition, Vandersanden also took further steps in the development of CO2-neutral bricks, the competence development of its employees was broadened, and the brick manufacturer opened a new showroom in Northern France and in Tolkamer (NL). As a true community builder, in 2021, Vandersanden also invested EUR 500,000 in charities at home and abroad. “Collective Well-being is definitely not window dressing”Whilst it is Vandersanden’s second Collective Well-being report, it is CEO Rudi Peeters’ first time to co-launch the report. For him, Collective Well-being was a deciding factor in joining Vandersanden: “In my first months at Vandersanden, I saw that Collective Well-being is definitely not window dressing. I immediately noticed that Collective Well-being truly is in the company’s DNA. It is present throughout the organisation, at all levels, among all employees,” says Rudi Peeters, CEO of Vandersanden. “Vandersanden has made tremendous efforts to become greener and more sustainable in recent years. I want to continue that approach. This ranges from baking CO2-neutral bricks to a fully electric fleet, including forklifts.”This year, Vandersanden highlights the various aspects of its ‘Collective Well-being’: for the environment, in the industry, at work and for the community. In addition to the initiatives taken and achievements made, special attention is also paid to the history of Collective Well-being, and how the concept itself, as well as the operations, have evolved from a deep-rooted conviction to a strategic priority. In addition, a separate chapter is devoted to training & coaching in the workplace and the report places particular emphasis on collaboration with partners in all areas of Collective Well-being. For example, several pages of the report are devoted to a double interview with NGO Cunina and Vandersanden.   Eddy Deconinck, Collective Well-being Director at Vandersanden comments: “It is thanks to the commitment of all our 800 colleagues and partners that Vandersanden can call itself a leader in Collective Well-being and sustainability. The shared belief in climate improvement and energy efficiency motivates us to keep raising the bar in our industry and, of course, the community to which we belong. Thanks to this broad view, Vandersanden is a leader in Collective Well-being today.”The full sustainability report and more information about Collective Well-being at Vandersanden can be found on the link below: 
Sponsored
Vandersanden Reduces Ecological Footprint With New Sustainable Packaging

Vandersanden Reduces Ecological Footprint With New Sustainable Packaging

Vandersanden Brick

Vandersanden, Europe's largest brick-producing family business, plans to reduce its ecological impact by 15 percent by 2023[1] and aims to be fully carbon neutral by 2050. To achieve this goal, the family business is making its packaging more sustainable, using recycled material and less ink. In this way, Vandersanden is taking an important step towards circular packaging. In 2022, Vandersanden will only use plastic sleeves and shrink-wrap that consists of at least 30 per cent recycled material. By the end of that year, a large proportion of the packaging will contain 50 per cent recycled material. This is one of the initiatives the family business is embarking on, to reduce its carbon footprint by 15 per cent by 2023, compared to the benchmark in 2019 and to be completely carbon neutral by 2050."By using covers and sleeves that consist of 30 per cent recycled materials, 400,000 kg less CO2 is emitted annually," explains Raf Jansen, Chief Operations Officer at Vandersanden. "That is equivalent to planting 17,000 trees. In time, we want to increase that share to 50 per cent recycled materials, which in environmental terms is the equivalent of 58 hectares of forest or 29,000 trees. These figures clearly show that the environmental benefits of recycling are enormous."Investing in generationsIn addition to increasing the use of recycled materials, Vandersanden is also ensuring that less ink is used for printing on its packaging. The brick manufacturer will introduce eco-printing at all its production sites during 2022, which means that only a maximum of 10 percent of the packaging surface will be printed. This has several advantages for the environment. The smaller print area requires up to 80 percent less ink, and eco-printed sleeves are also easier to recycle into high-quality material."By printing on a maximum of 10 percent of the packaging surface, we save on ink and our packaging becomes easier to recycle. This is an important step towards circular packaging and a contribution to our long-term goal of being completely CO2 neutral by 2050. I am proud of the efforts of all our employees and partners to make our production processes increasingly sustainable. As a family business, we think in terms of generations, not years," adds Raf Jansen.Innovation through repeated testingIn order to guarantee the quality of the new sustainable packaging, Vandersanden conducted several tests during its development in the past year. This is to ensure the strength of the recycled material packaging is guaranteed. These tests were so positive that further tests are currently underway to make the shrink wrap thinner as well, in order to use even less material.Vandersanden is taking action at all levels of its organisation to minimise its environmental impact and achieve the goal of CO2 neutrality by 2050. For instance, Vandersanden is currently examining how it can deal with pallets in a sustainable way and is taking steps to work with return pallets. Another recent example of sustainability initiatives undertaken by Vandersanden, is the introduction of the most energy-efficient brick kiln in Europe at Tolkamer. The family business also published its first sustainability report in 2021, the Collective Wellbeing 2020 report, with a full overview of all its sustainability initiatives and objectives.[1] compared to 2019
Sponsored
Erith and East Ham Fire Station

Erith and East Ham Fire Station

Langley Waterproofing Systems Ltd

The purpose: Energy savings of £¼million over 20 years at just two of its sites are predicted to be achieved by London Fire Brigade through effective roof refurbishment using our Roofing Solutions. The brigade identified that the roofs at Erith and East Ham Fire Stations were in need of refurbishment. Numerous intermediate repairs had already been undertaken. An efficient solution was needed to help London Fire Brigade optimise best value in its asset management and reduce its requirement for planned- or unplanned- maintenance.London Fire Brigade therefore turned to Currie & Brown construction management consultants to oversee the design and execution of the refurbishment projects under a contract management framework agreement in place between the two organisations. We was called in to assess the roofs and advise on a course of action. Data driven roof condition reports from surveys were taken across the two premises. We highlighted that the roofs were beyond economical repair and needed new waterproofing and insulation- a U value of 5.00W/m2K was discovered in one roof area, against the Regulatory threshold of 0.35W/m2K and best practice 0.18W/m2K. Our solution: We advised that in the main, overlaying of the existing roof covering with CP-20 Paracoat Cold Polyurea Liquid System (warm roof) application was the most-efficient and cost-effective solution.The over-laying using the CP-20 system satisfies London Fire Brigade’s policy of preference for flame-free, with no roof replacement needed this minimised waste to landfill.Our Approved Contractor CWG Group won the contracts to undertake the upgrading, working to Langley’s detailed individual specifications for each site.At East Ham Fire Station, four main roof areas plus a separate ancillary building were addressed.LangGuard free-standing safety rail was installed around the perimeter of roofs 1 and 4.The final touch for the field roof area was provided with Paracoat Fast SF slip-inhibiting finish to agreed walkway areas.At Erith Fire Station, the refurbishment involved upgrading two roof areas including a rooftop tank room and adjoining canopy of corrugated PVC over the Station building, and a separate stores roof.
Sponsored
Dublin Doors - Challenging Fire Test - Rutland ITS.11204

Dublin Doors - Challenging Fire Test - Rutland ITS.11204

Rutland

About the project:Dublin Doors are a distributor of door leafs to door manufacturers throughout Ireland. Since Brexit, the market in Ireland requires the EN 1634-1 fire testing standard, as opposed to the previously accepted the British Standard BS 476. A customer of Dublin Doors wanted an overhead concealed door closer combined with 44mm thick doors, and it had to pass the EN fire testing standard.The specification of the doors was: (A) 44mm PB hardwood lipped all round door (B) 38mm PB core faced with 3mm mdf, routed with 2mm decorative groove in the faceDublin Doors were very aware that EN testing is widely considered to be more onerous than BS testing. The inclusion of a drop seal was also a point of concern - many companies have found that using drop seals to control smoke can appear to make the fire test harder to pass, with some experiencing prolonged flaming at the threshold. Rutland was able to help by providing its concealed closer ITS.11204, which can be used in 44mm fire doors – one of only a handful of concealed closers on the market that can do this. Rutland was also able to tap into its network of experts and consultants to discuss possible options, to help Dublin Doors to arrive at a combination that met the specification, and was most likely to succeed in the test. Dublin Doors were also required to write a Pre-Test Verification (PTV) before the test – a requirement at many test labs now. Rutland used its expertise in compliance to help complete this specification.The outcome:The results were excellent, with both doors lasting 49 and 51 minutes respectively in the fire test, for what was a 30-minute FD30 doorset, the more onerous European standard EN 1634-1 to achieve – E30. In our experience of fire testing, this is an excellent result for a 44mm solid timber door, and the Rutland team were just as pleased as Dublin Doors that the door, along with its concealed closer, passed with flying colours.
Sponsored
How to protect people from fire when designing a building?

How to protect people from fire when designing a building?

Trade Access Panels

When you design a building that will be used by lots of people, like a tower block, you need to make sure that the building has the correct level of fire prevention and fire protection equipment. In instances where this isn’t the case, tragedies like the Grenfell Fire can happen. The importance of passive and active fire protection methods are vital for the safety of the intended occupants, but how can you ensure they’re going to be safe?

Showing 181-216 of 944

Feedback