NBS Source
I'm a manufacturer

"rainwater goods roof drainage systems"

6,914 results found

Sort by:

Showing 1981-1988 of 1988

Sponsored
Trinity Mews Residential Remediation

Trinity Mews Residential Remediation

RYNO

The Trinity Mews project is a residential property in Stepney, in the East-end of London. As a remediation project, the building already featured a roof terrace in disrepair that needed to be replaced. Originally fitted with timber, the wood had begun to rot away. The system used - TerraSmart AluminiumThis is a non-combustible decking system designed for use on terraces or waterproof substrates. The RDFR pedestals, with base rubber shock pads and ADS25 joists, formed the system substructure of the remediated terrace. The finish was made using ADB-60 aluminium decking boards in Anthracite Grey. The TerraSmart Aluminum system is IGNO certified meaning it satisfied the requirement to be A2 s1 d0 fire classified.Further improving on the timber deck it replaced, the system had to be durable and slip-resistant. As ADB boards are classified as a "low slip risk" on wet and dry and see no signs of wear after 100,000 footfalls, they comfortably met both sets of criteria.Location: StepneyCompleted: 2021Client: A property management company
Sponsored
Cabi Headquarters in Wallingford

Cabi Headquarters in Wallingford

BTS Fabrications Limited

Installer – County RoofingMain Contractor – Barnwood ConstructionArchitect – Scott BrownriggClient – Centre for Agriculture and Bioscience InternationalSystem – Vantage® SF (Secret Fix)Showcasing our premium CWCT tested Vantage® SF (Secret Fix) in 3mm aluminium powder coated to Ral 7016 anthraciteThe project received many accolades and awardsCABI HQ shortlisted for AJ Architecture AwardConstructing Excellence SECBE 2021 Awards - WinnerOxPropFest 2021 - WinnerUK Roofing Awards 2021 - FinalistArchDaily Building of the Year 2021 - NominatedSECBE People's Choice Award 2021 - NominatedFuture Cities Forum Awards - Highly CommendedAJ Architecture Awards - ShortlistedWe feel very humbled to be associated with such a fantastic project and a big well done to all involved
Sponsored
Cornish Units, Normanton

Cornish Units, Normanton

Metrotile UK Ltd

Willow Crescent in Normanton consists of forty seven post-war Cornish Units, each of which was designed to offer temporary housing after World War II and a life expectancy of around fifteen to twenty years.Wakefield and District Housing Association manage the homes at Willow Crescent and invested in a renovation program to boost the standards of each homeThe ideal material for the roofing and mansards needed to look traditional and keep the look and feel of the units and despite the refresh, each unit needed to blend in with the surroundings yet maintain the unique look that Cornish Units are known forMetrotile Lightweight Steel Roofing Systems were specified for the replacement of both the rooftops and mansards, offering each home the many benefits that Metrotile is known for and the low weight of each profile places less strain on both the supporting frame of the homes and the foundations.
Sponsored
Friars Walk Shopping Centre

Friars Walk Shopping Centre

Shield Membranes Ltd

As one of the fastest growing towns in Wales, Newport is undergoing a comprehensive programme of regeneration, of which Friars Walk is a central part.Friars Walk has reshaped the landscape of Newport with retail sales expected to double in the city, adding £120 million per annum and the city’s catchment predicted to increase from 211,000 to 367,000 with an estimated footfall of 10-12 million per annum.The 390,000 sq ft centre features a 90,000 sq ft Debenhams Department Store as well as other retail anchors H&M and Next. The leisure offer includes an eight screen Cineworld multiplex cinema, a Superbowl UK with 12 State of the art lanes and numerous riverside restaurants.Shield Membranes supplied the full ShieldTEC hotmelt system to be used on all roof areas, along with our own ShieldBOARD XPS and ShieldDIVERSE living roof build up.
Sponsored
Plot C1, English Cities Fund (ECF) New Bailey, Salford

Plot C1, English Cities Fund (ECF) New Bailey, Salford

Sotech Ltd

8300 SQM of Optima FC+, Optima FC+ perforated panels and Optima IPC (soffits) have been used in the completion of the 23-storey New Bailey building in Salford Quays.Optima FC+ was selected for a number of reasons on this project.Predominantly, it is an incredibly user friendly system – panels can be quickly and easily adjusted on site and the system can be fixed top down, or bottom up with individual panel removal and replacement. This makes Optima FC+ a highly desirable choice for designers and installers.However, the panels were specifically adapted for this project to enable a completely secret fix system, as per the architects vision. Therefore the top return fold was increased to 50mm instead of 38mm. This allowed for the security fixings to be completely concealed by the panel above, allowing the customer to easily fit the panels from ground up.Sotech worked closely with the design team and installer at the very early design stages to make this modification possible. The teams used a 3D modelling route, which allowed the customer to comment and make changes to the model without physical cost.Optima FC+ perforated panels were chosen as an additional aesthetic feature and Optima IPC was selected for the soffit areas as the architect requested a secret fix system.A bespoke window reveal and bracket was included in the panel design. This allowed for an extended side return which was used to hook on the panels and enable a secret fix. The Optima IPC system was perfect for this part of the design as it enables hidden mechanical fixings and is a cost-effective solution using 2.0mm aluminium.Black PPC aluminium was used as backing trays to enhance the appearance of the perforations, prevent views through the perforations and close off the cavity.Optima FC+ has been independently tested and certified to meet CWCT rigorous specification for rainscreen cladding and has been fire tested to BS8414-2 and classified to BR135 for high rise buildings. This makes it the perfect solution for Plot C1, now the tallest residential building in the New Bailey plot.Plot C1, which features a six-storey podium with an exclusive rooftop garden terrace for the wellbeing of residents, incorporates a number of sustainability measures including surface water drainage attenuation, minimising off site spoil disposal, reduced water consumption.The project has been shortlisted in the 2022 Facade Awards UK for ‘Best use of a rainscreen system using aluminium’.
Sponsored
Weston College

Weston College

Guttermaster Ltd

Project Overview:Weston College in Weston-super-Mare embarked on an expansion project to house Sixth Form, Art and Music Technology faculties, along with central facilities like the Learning Resource Centre and a restaurant. The college sought a distinctive perimeter feature for the new building, and Guttermaster Limited was engaged to provide a solution. This case study details how the manufacture of 800 meters of SnapLok capping and 300 meters of TrimFix fascia by Guttermaster enhanced the architectural vision and achieved bold symmetrical lines around the project.Project Details:Scope of Works:800 meters of SnapLok Capping300 meters of TrimFix fasciaClient's Requirements:Weston College aimed to create an iconic and aesthetically striking perimeter feature for their new development. Key project objectives were:Perimeter Feature: The college wanted a distinctive roof edge that would serve as a striking architectural feature for the new building.Symmetry and Precision: To achieve the desired aesthetic, the roof edge needed to have bold and symmetrical lines around the entire project.Architectural Vision: The solution provided had to align with the architect's vision, enhancing the overall appearance of the building.Guttermaster's Approach:Guttermaster Limited approached this project with a focus on precision and collaboration:Custom Design Integration: Guttermaster's design team worked closely with the architect to create a fully welded curved solution. The design was meticulously engineered to ensure that the SnapLok Capping and TrimFix fascia seamlessly matched the architectural vision.Symmetrical Lines: Guttermaster ensured that all junctions between eaves and verge were perfectly aligned to create bold, symmetrical lines that encircled the entire building, achieving the desired perimeter feature.Results:The partnership between Guttermaster Limited and Weston College resulted in a project that surpassed all expectations:Distinctive Perimeter Feature: The fully welded curved solution using SnapLok capping and TrimFix fascia systems created a distinctive and visually appealing roof edge, serving as a notable architectural feature.Symmetrical Lines: Guttermaster's meticulous approach ensured that the roof edge featured bold and symmetrical lines around the entire building, meeting the project's design objectives.Architectural Enhancement: The installed systems perfectly aligned with the architect's vision, enhancing the overall appearance of Weston College's expansion project.Conclusion:The collaboration between Weston College and Guttermaster Limited in implementing 800 meters of SnapLok capping and 300 meters of TrimFix fascia systems exemplifies the power of precision and teamwork in achieving a unique and bold perimeter feature. This project underscores Guttermaster's commitment to delivering custom solutions that enhance architectural vision and aesthetic excellence. The result is a roof edge that not only adds visual appeal but also represents a striking architectural feature for Weston College in Weston-super-Mare.
Sponsored
Easy Glass Slim outdoor glass balustrade for Luxembourg apartment buildings

Easy Glass Slim outdoor glass balustrade for Luxembourg apartment buildings

Q-railing

The 10 apartment buildings of the Cerisier Residences development in Bertrange, Luxembourg are surrounded by green spaces. The balconies with glass railings make for a stunning, modern appearance. Q-railing’s Easy Glass Slim glass balustrade system was identified as the perfect fit. It's extremely cost-efficient, since it is quick and easy to install – an important factor, given that more than 1,600 metres of glass balustrade were required for outside balconies and penthouse roof terraces.
Sponsored
Holland Park, Glasgow

Holland Park, Glasgow

Fixfast Ltd

Developed on what was previously the Strathclyde Police Headquarters, Holland Park is a residential complex with 4 towers ranging from 6 to 22 storeys in height, around a courtyard formation.ChallengeSpecialist building envelope company MetalTech Roofing & Cladding were contracted to secure the façade on this new development, with the task of fixing nearly 9,500m2 of façade to the external face of the buildings.SolutionMetalTech approached Fixfast and requested a technical façade calculation for the Fixfast façade support system, which we provided alongside technical advice.The Fixfast façade support system is a system for any application - including SPIDI® Max brackets: one bracket design means the system can be used in vertical or horizontal installation configurations and is engineered for both fixed and sliding points. Essentially, one bracket design means all challenges solved - simplifying material selection and on-site installation management.The unique ribbed bracket design offers superior strength, allowing systems to be engineered for heavier loads, or potentially fewer brackets per square metre for lightweight panels.With MetalTech needing to fix the façade simply but fast, Fixfast were able to work with them to get deliveries to site when they needed them, with the assurance of a versatile façade support system that works in a range of applications - wall cladding, soffits, or ceilings. "In addition to supplying an innovative support bracket for this contract, Fixfast also continued to provide their usual first-class service. Engineering and design services were available from the outset and technical support was gratefully accepted during the build to help overcome some difficult details. We were fortunate in being able to use the same SPIDI Max bracket for both façade and soffit support in both aluminium and stainless steel. This greatly helped to simplify our process from design through to install. And with the site being in a restricted, city centre location, timely and flexible deliveries were required - which Fixfast duly achieved."MetalTech Roofing & Cladding Ltd

Showing 1981-1988 of 1988

Feedback