NBS Source
I'm a manufacturer

"mechanical cleaning chemical systems"

6,963 results found

Sort by:

Showing 1801-1836 of 1966

Sponsored
Grand Designs: Green Roof Project

Grand Designs: Green Roof Project

Polyroof Products Ltd

The Protec System was used to waterproof the domed green roof areas of this striking, sustainable house development which was featured on Chanel 4’s Grand Designs. With an ambitious vision and a tight budget, Robert and Milla Gaukroger set about transforming a dated 1980’s house overlooking Lake Windermere into a state-of-the-art, eco-conscious home. Since the house lay in beautiful hillside surroundings, in order to blend into this setting, the domed roofs of the house were to be covered with a wildflower meadow mix to provide a green roof construction.The SolutionThe Protec System was chosen as a waterproofing membrane for the roofs as it is ideally suited for green roof applications. Lightweight, flexible and highly durable, the system can easily accommodate structural expansion movements and is tough enough to resist root penetration. The Protec system was applied to over 350m2 of domed roof to provide a long-lasting waterproofing membrane.The key reasons why Eastleigh chose Protec are the same reasons that has seen it become one of the fastest growing cold-applied liquid roofing systems in both the new build and refurbishment markets. Combined with the timber cladding to the verticals of the building, the finished aesthetics of the development blended seamlessly with the surrounding areas.A warm roof build-up that can be made waterproof at multiple stages:For larger projects the Protec system can be made temporarily waterproof at two stages prior to the application of the full waterproofing system. The first stage is upon installation of the sealed, aluminium-faced vapour barrier.The second phase follows the reinforcing of the foil-faced insulation board joints with Protec resin and taping mat. This enables a much more controlled approach to the installation with a greatly reduced chance of rain causing disruption and damage during the works.Highly flexible membrane:Regardless of the size of the roof, Protec forms a homegenous membrane, without a single joint or seam and without the need for any expansion joints.RapidCure technology for quick installation:The application of Protec as a liquid, through to the curing process where a solid, tough membrane that can be walked over, takes only 30 – 60 minutes. This enables large sections of the roof to be fully completed in a short space of time.Installing the Roofing SystemsThe Protec System provided waterproofing to all flat roof areas as well as the extensive parapet wall sections. The roof areas were made up of two designs: the Protec Warm Roof System (approx 7,500m2) and Protec applied to concrete as part of an inverted roof design (approx 1,000m2).The roof installation was carried out with a planned, phased approach that was synchronised to the wider construction schedule. For the warm roof areas, the first stage was to fill the troughs of the structural metal roof deck with acoustic insulation infills that will dampen external noise within the leisure centre. Next, the crowns of the deck were primed ready to receive the self-adhesive vapour barrier.The use of a high-performance aluminium vapour barrier not only eliminates the risk of condensation within the roof, but also provides temporary waterproofing protection, which is extremely useful on larger works such as this.The Polyroof RES Insulation boards, which comprised of a two layer system totalling 170mm to achieve a U-Value of 0.14 W/m2K, were bonded using high-performance PU adhesive to the vapour barrier. Following the wind uplift calculations it was determined that mechanical fixings were not required for this application – making for an extremely rapid installation. As you can probably imagine, fixing through 170mm of insulation into the crowns of the metal deck can be a tricky and time-consuming task.A key advantage of using a tongue and groove insulation system is that the finished surface of the roof is smooth and level without any unsightly board steps that can also lead to standing water issues. The insulation board joints were sealed using Protec resin with Polymat Taping Mat 450 which, in addition to providing additional strength to the joints, also creates a temporarily waterproof layer.For the inverted roof sections, Protec was applied directly to the primed concrete/screed surface. The membrane was inspected by Polyroof Technical Services, signed off and then covered with inverted roof components. An interesting fact when using Protec in inverted roof situations is its incredible durability performance – as tested by the BBA, Protec “can provide an effective barrier to the transmission of liquid water and water vapour for the design life of the roof in which it is incorporated”.Monitoring and CompletionThroughout the duration of the contract, Polyroof Technical Services carried out regular site visits that were reported back to Interserve as part of Polyroof’s free-of-charge contract monitoring service. This enabled the client to keep up-to-date with the progress of the roof installation in detail and also provided peace of mind that the original specification was being closely followed and implemented.Polyroof worked closely with the Roofline Group during the installation, enabling the challenges were identified and solved in an efficient and coordinated manner – saving the client time and money.
Sponsored
Rescuing a Poolside Deck from failed Decking Oils

Rescuing a Poolside Deck from failed Decking Oils

Owatrol UK Ltd

We’re always pleased to hear about how our products have helped customers with their renovation projects. However, we were particularly delighted when one of our Partners Roger, of R and A Pressure Washing Services, sent us these photographs of a poolside deck renovation he recently completed.The customer had previously treated their poolside deck with a decking oil, purchased on the high street. As you can see from the photo, the decking looked dull and tired and was not at all complementing the lovely rooftop views from the pool.We’ve had many customers tell us that the high street decking oils they had previously bought had failed. They were continuously having to sand and re-oil their decking to keep it looking smart. By investing in a good quality product, you could reduce both the time and money it takes you to constantly strip and re-oil your decking and replacing it with easy, low maintenance decking.Aquadecks, for example, is water-based and is easy to apply and maintain, with no sanding or stripping required. Sometimes, it’s worth investing in a more expensive product, such as Aquadecks, at the beginning, to save you money in the future.So, how did Roger rescue his customer’s poolside deck?Firstly, he mechanically sanded the deckingTo remove all the old oil from the surface of the decking, Roger sanded the decking with an electric sander. How the decking looked after sanding can be seen in the photo below.Whilst this step is often completed by professionals, for the DIYer it’s going to be easier to remove the old oils using Aquanett wood oil remover (if it’s a different sort of coating you’re removing then use Dilunett or Prepdeck).If you don’t want to sand back your decking, follow the steps below if you’re removing oils.Aquanett can be used to remove teak and other oils from all woods blackened by UV rays. It will prepare your decking for a new coating and improve penetration and adhesion. Its gel-like consistency means that it’s easy to apply.Even better, it’s suitable for environmentally sensitive areas, as it does not contain solvent or paraffin and it’s biodegradable.If you choose to use Aquanett instead of sanding, you’ll then need to neutralise the decking with Net-Trol before applying your finish.Then, he applied AquadecksNo matter how many times we see photos of decking renovations using Aquadecks water-based penetrative wood finish, we’re always really impressed with how it turns out.First of all, Roger applied a liberal amount of Aquadecks. Applying in the direction of the grain, he worked in sections that he could complete within 30 minutes.As soon as the ‘wet look’ of the first application had disappeared, Roger applied a second coat. He then allowed this to penetrate for 15 minutes.He then removed any excess Aquadecks that hadn’t penetrated the decking. This avoids it drying as shiny spots on the surface. The place for Aquadecks is in the wood, not on the surface.As Aquadecks is water-based, Roger was then able to clean his tools with soap and water.We think that the decking now looks as good as new – if not better!
Sponsored
St Stephen’s Primary School

St Stephen’s Primary School

Polyroof Products Ltd

A friendly and welcoming school based in Blackburn in the North West of England, St Stephens Church of England Primary School is a place where pupils can develop their skills in a school that is proud of its Christian values and high standards of teaching. The school has been praised for its philosophy of continuous improvement by a recent ofsted inspection, providing a nurturing environment for children.Continuing the high level of teaching facilities was paramount for the school, and after discovering that the gutters and parapets of the building were aged and leaking, it was vital that a solution was found before this caused issues.The ChallengeIn coordination with Polyroof Products Ltd a survey was scheduled to take place at the site to determine the exact nature of the issues and formulate a solution. Upon inspection it was discovered that the existing waterproofing consisted of a single-ply membrane which had become aged with various leaks being reported and localised repairs carried out with not much effect. The underlying build-up consisted of a galvanised steel metal deck and had been coated in plasticol. Once the survey was complete it was clear that the gutters and capping’s would benefit from a high-performance waterproofing system installation, this would protect from further leaks occurring.The SolutionThe System of choice for this project was Protec Xtraflex. Protec Xtraflex is a highly flexible version of the Protec system designed for coating gutters. Its fast curing technology and imperviousness to standing water fulfilled the rapid solution needed to offer durable waterproofing performance for this project. Taking into consideration the information obtained from the survey, a bespoke Polyroof specification was created to combat all of the issues discovered. The chosen Polyroof Approved Contractor to carry out the work on this project was the KSD Group, a contractor with a wealth of experience in the roofing and construction sector.Once all these aspects were in place, work could officially begin. Firstly, it was highlighted that falls and drainage were already present, so the Polyroof specification made use of the existing falls, combining this with the chosen waterproofing system. During this project, there was no need to strip back any of the existing waterproofing. It was made good where required, allowing a smooth substrate for the new system to be bonded to. Once this stage was complete, the area was cleaned and prepared for the new system by removing any dirt and debris. The Protec Xtraflex system was now ready for installation. Firstly, all surfaces that required it were primed, including the single ply existing waterproofing, which required a Polyroof SP Primer 202. During this installation, all lap joints and bolt heads were applied with Polyroof Butyl Tape and Polyroof Butyl Lap Tape, reinforcing these points before application. Pre-formed high-quality Polyroof drip trims were installed to the outer edge of the metal capping, and new flashings were also installed to cover the exposed insulation at this detail.The first coat of Polyroof Protec Xtraflex was applied to the substrate. This consisted of Xtraflex resin and Polymat 450 and was allowed to cure. Due to the rapid cure technology of the system, this only took 30 – 60 minutes, allowing for quick installation. Once complete, the second coat of Protec Xtraflex Resin was installed and allowed to cure.CompletionThe project was efficiently managed by both the contractor KSD Group and regular Polyroof Technical Services visits to ensure that each aspect of the project from start to finish was carried out within the client’s specification, time frame and budget. The project was a great success showing the high-quality work from KSD Group. The customer can now be confident that this new Polyroof Protec Xtraflex membrane will last for many decades to come.
Sponsored
Kenley Station Cycle Hub

Kenley Station Cycle Hub

Falco UK Ltd

This is the new bespoke cycle hub Falco recently designed, manufactured, supplied and installed this spring for Kenley Station in south Croydon. Making use of the flagship FalcoHub design, the new cycle hub has been fitted with the tried and tested FalcoLevel-Eco two-tier cycle rack, providing commuters with up to 16 secure cycle parking spaces.The bespoke 6.5m x 4.2m cycle hub has been fitted with an electric sliding door, a secure access system, LED lighting, a FalcoFix 2.0 cycle repair station, bespoke branding graphics and a cladding combination of sustainable hardwood slats coupled with powder coated galvanised steel in a ‘Moss Green’ RAL colour.The cycle hub also provides secure accommodation for up to four cargo bikes, e-cargo bikes, adaptive bikes, recumbent bikes, tandems, tricycles, oversized and upright cycles or bike trailers.In addition to the cycle hub, Falco also provided a bespoke solution to store the clients refuse units.Rail passengers using pedal power can apply at the ticket office for a free security fob to gain entrance to the facility now.The images attached show the new cycle hub addition, installed next to platform 2, off Station Road.The whole shelter is a bespoke contemporary design of the classic Falco Cycle Hub shelter, which features clean lines through the glass cladding and supported by stainless steel glass clamps. The steelwork is hot dip galvanised to BS EN ISO 1461 and also meets UK structural design laws with EN 1090 accreditation. Rainwater is collected via innovative integral gutters as part of the roof system and a bespoke bund ensure that the cycle hub is weather proof.For more information regarding the cycle hub scheme at Kenley Station or any other product from our cycle parking and shelter portfolio, please contact our helpful sales team on 01538 380080.
Sponsored
Anson House Residential Apartments in Westminster Receives Falco Cycle Hub

Anson House Residential Apartments in Westminster Receives Falco Cycle Hub

Falco UK Ltd

Falco recently took to the design, manufacture, supply and installation of a bespoke cycle hub based on the traditional FalcoLok-500 design. Installed at Anson House, south Westminster, in view of the River Thames, the new cycle hub has been coupled with the FalcoVert-Pro cycle rack to provide secure accommodate for up to 24 bikes.Installed on behalf of Westminster City Council, the new cycle hub features electrogalvanised perforated sheet cladding, powder coated in a Jet Black RAL colour, along with a secure access system.The whole shelter is a bespoke contemporary design of the classic FalcoLok-500 shelter, which features clean lines through the glass cladding and supported by stainless steel glass clamps. The steelwork is hot dip galvanised to BS EN ISO 1461 and also meets UK structural design laws with EN 1090 accreditation. Rainwater is collected via innovative integral gutters as part of the roof system and a bespoke bund ensure that the cycle hub is weather proof!The cycle hub was commisioned to help reduce congestion and provide greater cycling accessibility for residents of Anson House.The FalcoVert-Pro as shown here at Anson House, is a space saving cycle rack design ideal for highly popular densities such as stations, cycle hubs, shopping centres, high streets and car parks etc. Bicycles are parked semi vertically with both front and rear wheels located in a custom designed trough.Falco cycle hubs can also incorporate a world of features including; smart LED lighting, green sedum roofs, CCTV and Help Point facilities as well as numerous other cost-effective features for the cyclist such as lock holders, helmet lockers, seating and bike repair facilities. For more information about the FalcoHub cycle store, a demonstration of the FalcoSmart app-based lock, the FalcoPod bike hangar or any other Falco product, then please speak to one of our friendly customer service staff on (01538) 380080.
Sponsored
Three types of mineral ceiling tiles for Scottish health charity

Three types of mineral ceiling tiles for Scottish health charity

Zentia

The challengeThree types of mineral ceiling tiles feature at the Jenny’s Well care home for older people with sight loss. It is operated by the Royal Blind charity, which shares sister charity Scottish War Blinded’s new Hawkhead Centre for visually impaired veterans.The Jenny’s Well care home designed by the Unum Partnership features Zentia’s tiles in the main entrance, reception and manager’s offices, all the corridors, back of house staff areas, kitchens and toilets.The solutionThese include 1,000 m² of Zentia’s Perla Tegular and 250m² of Prestige dB tiles, as well as 350 m² of Aruba Max, all mineral with Tegular edges installed on a Zentia Prelude 24mm XL2 grid system.In addition, it features ISO clean room rated Hygiene tiles to the main kitchen and humidity-resistant Hydrabloc tiles to laundry areas and WC, both square-edged 600 x 600 mm in a Prelude 24mm Corrosive Resistant grid. The use of a 200 mm high Axiom profile also provided a solution for ceiling level changes with a pre-finished bespoke upstand.The Zentia systems were supplied by CCF in Glasgow and installed for main contractor CCG (Scotland) Ltd by specialist sub-contractor Brian Hendry Interiors, a member of Zentia’s Pinnacle Partner network of sustainably-certified installers, whose squad of specialist fixers completed over a six-month programme.Unum found the site for the client, The Royal Blind, to not only accommodate proposals for the bespoke care home but also a drop-in centre for the Scottish War Blinded. The care home is designed to provide an exceptional caring environment designed to the exacting requirements of the visually impaired. The design has been developed to create domestic-scale pavilions centred around a sensory courtyard, creating a community hub, with the aim of providing a secure environment that promotes care and social interaction and encourages self-confidence and independence among its residents.
Sponsored
Park Central

Park Central

Axter Ltd

Park Central, Zone B11, Birmingham has been an ongoing 15-year project which Crest Nicholson Regeneration, delivered in partnership with Birmingham City Council and Optima Community Association.Systems in useWilotekt®-PlusEcoflex®Starcoat® PMMAOverviewThe development has completely transformed the former Lee Bank Estate into a desirable place for city centre living. Included in the scheme is an eight-acre park at the centre, which has proved very popular with the local community.ChallengesThe primary challenge was to achieve a robust waterproofing solution across all areas of the project, ensuring that all key targets of the construction programme, installation, cost efficiencies and client requirements are met.This coupled with ensuring all aspects of the waterproofing package were designed and installed in accordance with the current government legislation, NHBC design guide and industry design guides including BS 6229:2018, requiring all areas to be installed to a design fall no less than 1:80. Due to the roof slab being concrete, the frame required a fall within the structure to remove the requirement for a secondary screed which was simply accommodated across all areas. However, Block E proved a little more difficult due to the curvature of the building.SolutionsThrough review of Axter’s extensive system portfolio and by following our waterproofing ethos of ‘right system, right application’, a mix of three key waterproofing solutions was incorporated within the architectural design specification.Wilotekt-Plus was specified for the central podium as a robust waterproofing system, allowing for regular foot traffic and storage during the construction stage as this was a key area for use with deliveries and access to three of the six blocks. The system was also specified for the main roofs where a fall could be achieved within the concrete slab.Block E proved a little more challenging to create the fall, but Ecoflex ADH PVCp single ply with tapered insulation was more than up to the job. It was installed allowing for a clean, visually attractive aesthetic and the required design falls to achieve drainage.To close out the design and turnkey solution, we also incorporated waterproofing to the exposed car park decks between Blocks D and E and Blocks E and A with R12 rated, BBA certified Starcoat PMMA. Bay marking was easily applied using Starcoat PMMA white roller-applied surfacing.Through close collaboration and partnership with Axtershield Installer NRA Roofing & Flooring, all works were protected under Axter’s Platinum Guarantee, our most comprehensive insurance backed guarantee covering materials, design, workmanship and insolvency. The excellent workmanship, attention to detail and multi-discipline co-ordination of works displayed by our Axtershield Installer helped to deliver this complex project.
Sponsored
Creating Safe and Hygienic Entrances to Grange University Hospital

Creating Safe and Hygienic Entrances to Grange University Hospital

INTRAsystems

With health and wellness a top priority, a high performance commercial entrance matting system is essential within hospitals and healthcare settings. Using INTRAform DM Low Profile entrance matting with a combination of inserts, BDP created multiple safe and hygienic entrance points to Grange University Hospital (GUH). About the building Serving over 600,000 people, this world-class healthcare facility treats patients needing complex emergency or critical care. Offering 471 beds, it is home to more than 40 specialist services. In addition to the main entrance, the building has multiple access point including staff changing areas, ambulance entrance with associated trolley traffic and other pedestrian entrances to different clinical areas. Many of these entrances are in use 24 hours a day and exposed to the elements. The Solution Following consultation with the INTRAsystems specification team, the architect selected clear anodised INTRAform DM Low Profile entrance matting. With its heavy-duty closed construction aluminium planks, INTRAform DM Low Profile is ideal for locations with high foot and wheeled traffic, such as this busy hospital. The closed construction offers ease of cleaning, while the low-profile design provides a cost-effective solution without compromising performance. Extra-wide insert sections ensure maximum contact with footwear and wheels to deliver optimum dirt and moisture absorption over smaller areas. Along with the clear anodised finish, they also help to minimise strobing which can be an issue when specifying contrasting fibre and wiper bars. Modified Zonal System To maximise performance, all entrances to the hospital use a modified zonal system within a single internal, recessed matwell. All the mats feature an initial section of multidirectional rubber inserts which gives exceptional scrapping action to remove debris and excess moisture at the threshold. At the main and ambulance entrances to the hospital where traffic is heaviest, the mats feature between 2 and 4-metre sections of rubber to ensure multiple footsteps or wheel rotations are affected. Following the initial sections of rubber, INTRAlux Elite fibre inserts thoroughly remove the remaining dirt and moisture. INTRAlux Elite offers exceptional tufting per square metre which provides superior comfort and acoustic absorption. With 92,990 tufts per square metre, INTRAlux Elite can absorb and retain 5.4L/m² - perfect for the inclement Welsh weather. By specifying a modified zonal system, the architect has created a robust yet cost effective entrance matting system to maintain safety within the building and extend the life of internal floor coverings. Learn more With entrance matting providing the first line of defence against dirt and contaminants a robust entrance matting specification in hospitals and healthcare settings is critical. To learn about the nuances of specifying entrance matting in a healthcare setting, read our article on Specifying Entrance Matting for Hospitals & Healthcare on ribacpd.com
Sponsored
Emshield-DFR used in the Riverside Park and Gardens development in Poplar, East London, to provide fire resistant, multi-directional, high movement, structural joint sealing of floor slabs from below for 120minutes, EI Fire ratings

Emshield-DFR used in the Riverside Park and Gardens development in Poplar, East London, to provide fire resistant, multi-directional, high movement, structural joint sealing of floor slabs from below for 120minutes, EI Fire ratings

NCC – Emseal Movement Joints

Fire resistant, multi-directional, high movement, structural joint sealing of floor slabs from below for 120minutes, EI Fire ratings using Emshield-DFR from NCC Movement joints Limited.St William is a division of Berkely Homes, predominantly working on some of the most technically complex regeneration projects on brownfield sites, at the heart of communities across London, and typically with a landscape-led approach. Riverside Park and Gardens is being developed on the former Leven Road Gasworks in Poplar, East London, forming part of the 20 acres Aberfeldy Village scheme. This is an ambitious regeneration project in the borough of Tower Hamlets, with around 3000 new homes, plus shops, offices, cafes, bars, and a cinema, as well as extensive landscaped gardens, play areas, and riverside walks.On this important development by the River Thames, the structural floor slab joints ranged from only 15mm to 25mm wide, but they were subject to high multi-directional movement requirements, plus they required a minimum 120-minute EI Fire Rating to protect the future residents. To add to the complexity, there were shear connectors within the floor slabs that also needed protection to ensure their structural integrity in the event of a fire.An “E120” denotes that the system will not allow flames and hot gases from physically passing through the element for 120 minutes, which also explicitly denotes that the system will achieve 120 minutes ‘Integrity’ (E) and ‘Insulation (I), known as EI120, which therefore also achieves 120 minutes ‘Stability’ (R) in fire.Emshield-DFR-2 provided the ideal solution, and one which could also be rapidly installed from below in a single operation. This specialist work was completed by specialist fireproofing contractors, Gould Sealants Limited, working for Main Contractor, Morris Roe. Emshield-DFR/WFR is an EN-1366-4 tested, fire-rated movement joint, designed to be used in movement joints in exterior and interior walls where a combination of watertightness, fire-rating, sound attenuation, and thermal-efficiency are required. Key performance parameters include:-       Up to 100% joint movement (+/- 50% capability);-       100% watertight joints; -       No mechanical fixings to the structure;-       Accommodate changes in direction between the horizontal and vertical plane;-       Accommodates 3-Dimensional movements (including in shear & vertical, as well as joint expansion and contraction;)-       no additional sound concrete cut-outs required;-       Up to 4-hour fire integrity rating to EN1366-4; -       Up to 4-hour thermal Insulation rating to EN1366-4;-       High acoustic insulation & barrier performance; -       CE Approved and MarkedFor more information:Contact: David Mackay Tel: 01257 266696NCC Movement Joints Limited
Sponsored
Rhyl Railway Station Restoration

Rhyl Railway Station Restoration

Polyroof Products Ltd

Long standing and rich in history, Rhyl Railway station was opened on 1st May 1848 and was part of the Chester and Holyhead Railway Company’s line. The Station itself is located close to the centre of Rhyl, a lively seaside town on the North Wales coastline and a popular destination for many tourists across the country.As part of a Railway Upgrade Plan, Network Rail have invested £50 million into the restoration of stations across the North Wales Coast. Rhyl was one of the first stations to receive this upgrade and when it was shown that various roofs of the station were in need of restoration.The ChallengeRhyl was one of the first stations to receive this upgrade, and when it was shown that various roofs of the station were in need of restoration, Polyroof was chosen to help restore them to their former glory, and a survey was organised.The specified areas that were in need of refurbishment included the roof over Platform 2 and the bridge walkway roof which connected the two platforms. The existing waterproofing on these areas consisted of built-up felt with a mineral cap sheet, which was in an aged condition and beginning to show signs of failure such as splits and blisters. Leaks were now beginning to occur which were in danger of affecting the condition of the roof structure itself.The SolutionBased on the findings of the survey conducted by Polyroof Technical Services, a bespoke specification was designed that would eliminate the current issues through the installation of the BBA-approved Protec system. Due to the roof being situated above unheated areas, there was no requirement for new insulation within the build up. Firstly the existing built-up felt was stripped and removed from site to expose the original close-boarded timber which was inspected for defects, made good where required and retained where possible. Defective areas where replaced with new timberwork as required. In order to provide a sound, solid substrate a new OSB3 TG4 deck was mechanically fixed across the whole area within a phased approach, ensuring the roof was kept watertight as works progressed.The Protec system was then applied directly to the timber; with its RapidcureTM technology large areas where able to be made fully waterproof within short periods of time. Polyroof Technical Services visited site regularly to ensure works were being completed to the high standards required and regular reports were fed back to the client. Upon completion a final inspection by Polyroof led to the roof being signed off and guaranteed, giving the client complete peace of mind that their roof will be fully watertight for at least the 20 years. Polyroof were proud to be part of this project to restore Rhyl and its Railway station to its former glory.
Sponsored
Emseal Acoustic & Thermal Movement Joint Sealing for the New Aviva Studios, Manchester - The Factory

Emseal Acoustic & Thermal Movement Joint Sealing for the New Aviva Studios, Manchester - The Factory

NCC – Emseal Movement Joints

Aviva Studios, Manchester - The New Home of Factory International:Fire resistant, acoustic joint sealing of the complex facades, has been completed with Emshield-WFR and Emshield QuietJoint from NCC Movement joints Limited. NCC Movement joints have supplied Emshield-WFR-2 and Emseal QuietJoint to seal the wide, high movement capability, expansion joints in the complex facades of the new Aviva Studios in Manchester. Aviva Studios are new arts and cultural venues, which are now the new home of Factory International, and located in the centre of St John’s. This is the 13-acre regeneration project around the old Granada TV studios in Manchester. On this prestige project, the architect was Ellen van Loon, a partner at OMA (Office of Modern Architecture), who designed the buildings to create an eclectic environment for the arts, including striking and complex architectural facades. This included her trademark industrial styled finishes, cladding the facades with corrugated metal panels, and incorporating large exposed concrete surfaces. Structural engineering for the project was provided by Burro Happold. The structural movement joints in the external façade and walls, as well as in some of the floor slabs, had to be designed to accommodate not only significant movement (+/-50% or more), whilst maintaining watertightness, but also to be CE certified fire resistant for at least 2 hours, and it was also essential to maintain the high acoustic soundproofing and thermal insulation of the building across the façades.Emshield-DFR/WFR-2 for internal joint sealing, from NCC Movement Joints Limited was the ideal solution, quickly installed as a complete system to meet all the specified requirements in a single solution, with no mechanical fixings, and without disrupting other trades. The Emshield system was installed by TECL (Thermal Engineering Contracts Ltd) as the acoustic and firestopping specialists on the project, as well as by the specialist façade manufacturers, Lindner Prater.The 13,350 m2 building has been designed to provide open spaces that are flexible, adaptable, and capable of being reconfigured for a wide variety of shows at different scales. The key facilities are The Hall, an auditorium that seats 1,600 but can accommodate 2,000 standing; and The Warehouse, an open performance space 21 metres high, with capacity for 5,000 people, all designed and built with advanced acoustic-insulation. They can function separately or together, with a stage that can stretch back to a depth of 45 meters. Factory International are named after the Factory Records record-label, which was founded by the late Tony Wilson ran Manchester’s Haçienda nightclub in the 1980’s and launched bands such as the Happy Mondays and Joy Division. Their new home at Aviva Studio complex is the first public project by OMA in the United Kingdom, and already regarded as the most ambitious cultural development for the future in Manchester.
Sponsored
Creative Centre, York St John's University |
SIP Cladding Project

Creative Centre, York St John's University | SIP Cladding Project

SIP Build UK

The Creative Centre at York St John University represents an evolutionary step in educational architecture, mirroring the institution’s commitment to fostering innovation, creativity, and community engagement.By integrating cutting-edge sustainable technologies and materials, the centre not only minimizes its environmental impact but also serves as an inspiring example of how modern design can contribute to the well-being of both the planet and its inhabitants.The facility’s versatile spaces encourage interdisciplinary collaboration, enabling students and faculty to explore new frontiers in arts and education. This architectural gem not only enhances the university’s landscape but also strengthens its ties with the local community, inviting public participation in a range of cultural and educational events.As a symbol of York St John University’s forward-thinking ethos, the Creative Centre is poised to shape the future of creative education, making it a cornerstone of both the university and the wider society.Three main concepts formed the foundation of the design approach. First, it is a genuinely sustainable building, both in operational and embodied carbon terms, with a substantial timber frame and simple climate control. Second, the main atrium space unites all the building elements together, reflecting the latest thinking in higher education to create ‘third spaces’ for cross-disciplinary collaboration.Finally, the Centre makes the most of its proximity to York Minster connecting the University to the heritage of the surrounding city. Throughout the atrium, recital hall and critical listening room, views to the Minster are carefully framed, reinforcing this picturesque view across the stunning historic site.Low embodied carbon materials, such as glulam and CLT and SIPS were used for the construction of the Centre, as part of a ‘fabric-first’ approach using Passivhaus principles to achieve a BREEAM Excellent rating.Working alongside environmental design consultant Atelier Ten, the project’s eco credentials were achieved by using triple-glazing, making the building air tight, providing simple operation systems – such as openable windows – and a mixed mode ventilation system with both mechanical and natural ventilation in teaching rooms.The building is extremely functional and flexible, for example the 2,000m2 of teaching space are column-free internally with modular servicing to allow easy re-configuration in the future should the university’s requirements change. The 180 capacity auditorium was designed with SSV Theatre Consultants to facilitate teaching as well as performances, with a level access technical level. And the building connects to the natural environment through its use of natural materials and integration with a campus wide landscape masterplan.
Sponsored
Upgrading physical perimeter security using 358 mesh, access control measures and crash rated systems for a water treatment plant

Upgrading physical perimeter security using 358 mesh, access control measures and crash rated systems for a water treatment plant

Jacksons Fencing

Following the brief outlined by the water treatment plant the proposal adopted for implementation was for the creation of secure access control. Bi-Folding Speed Gates topped with razor wire were supplied to each of the main entry and exit points to the site. These were supported by PAS 68 rising bollards and rising arm barriers with synchronised operation and traffic light signalling. The gates and barriers were flanked by runs of Jacksons Securi-Mesh® fencing to provide a separate pedestrian entrance to the facility, while static PAS 68 rated bollards were additionally deployed to manage traffic within the site.
Sponsored
EDUCATION - LOGAN HALL UNIVERSITY COLLEGE LONDON, LONDON, STAIR NOSINGS

EDUCATION - LOGAN HALL UNIVERSITY COLLEGE LONDON, LONDON, STAIR NOSINGS

Quantum Flooring Solutions, a trading name of Quantum Profile Systems Ltd

Logan Hall is an auditorium at the University College London. It is a venue based in the famous 20 Bedford Way building, and is used for various events such as award ceremonies, film screenings and conferences.
Sponsored
Easy Glass MOD 0760 stand-off railing system + Easy Glass Slim frameless glass balustrade - Shopping centre

Easy Glass MOD 0760 stand-off railing system + Easy Glass Slim frameless glass balustrade - Shopping centre

Q-railing

Parc Central shopping centre in Tarragona, Spain, has been one of the leading shopping centres in the Tarragona province. In 2013 the second floor was fully refurbished. For the interior, the architects chose Easy Glass MOD 0760 balustrade and a combination of stainless steel and wooden handrails. On the roof terrace 100 metres Easy Glass Slim were installed, with a stainless steel cap rail to create a stylish finish. The full glass balustrade ensures the safety of people sitting outside while they enjoy a clear view of the surroundings.
Sponsored
Ultimate Rose - Robinson Home

Ultimate Rose - Robinson Home

Roseview Windows

Located in Surrey, this detached Victorian property needed its top floor timber windows replaced due to rotting. Maintaining the windows was proving costly for the homeowners but they needed a solution that would still look authentic next to their ground floor timber sash windows. After researching their options, the homeowners came across Roseview’s traditional timber alternative sash windows. The possibility of maintenance-free sash windows that are indistinguishable from the original box sashes, but while providing modern thermal efficiency and enhanced security, made Ultimate Rose the obvious choice. Using modern technology, Ultimate Rose is completely seamless with traditional joinery style mechanical joints and the slimmest 35mm mid rail on the market. When installed adjacent to the homeowner’s original windows it was almost impossible to see a difference. The home was finished with a single vertical astragal bar to match the home’s existing sightlines and allow for maximum natural light. Additionally, run through horns and a wood grain texture was added for a fully authentic finish. The result is truly indistinguishable, and the homeowners now have traditional and modern performing sash windows that will last for years to come. The owners are now planning to replace the timber windows on the ground floor with Ultimate Rose as well.
Sponsored
Skelbrooke Seclusion Suite

Skelbrooke Seclusion Suite

STJ Projects Ltd

Skelbrooke Seclusion Suite, Skelbrooke Ward, DoncasterWorking with Raceway Builders, on behalf of Rotherham Doncaster and South Humber NHS Foundation Trust, we were responsible for the supply and installation of the following elements:R-Quest Severe Duty Steel interlaid seclusion doorsets, incorporating our own Pill & Beverage HatchR-Quest Heavy Duty cross corridor doorsetsSteel interlaid external doorsetAnti-attack internal viewing screenAnti-ligature ironmongery including Surelock McGill multipoint locksBespoke manufactured CCTV & storage cupboard with anti-ligature hinge and lockFloor to ceiling storage cupboard with anti-ligature hinge and lockRecessed wall storage cupboard with anti-ligature hinge and lockAll doors (including cupboard doors) within the seclusion and de-escalation space are PVC encapsulatedOur Pill & Beverage Hatch offers a high level of security and safety, when opened, the door becomes a shelf allowing staff to place items and stand back allowing residents to take the items. Once the resident has taken items, the door is pushed closed instantly locking shut. There is then an additional 3 bolt locking mechanism for additional security
Sponsored
Coláiste an Chláirín

Coláiste an Chláirín

Bauder Ltd

Coláiste an Chláirín Bauder Thermofol single ply waterproofing system with BauderROCK insulationSynopsisThe new Coláiste an Chláirín building in Athenry, Co Galway is a post primary school consisting of classrooms, a special needs unit, sports hall, general-purpose hall, staff amenities and extensive external facilities designed by Smith Kennedy Architects & Healy Partners Architects. The project was managed by JJ Rhatigan and Company and the roofing element appointed to Priority Roofing and Cladding Ltd. The roof of the main building and the gymnasium required flat roof build-ups to meet the specifications as set out in in SDG 02-05-03 (Acoustic Performance in New Primary & Post Primary School Buildings), while meeting the general performance requirements specified within TGD 021-7 2018 (Minimum Performance Standards of Roof Materials and Finishes). The chosen system had to meet an acoustic performance of 35dB indoor ambient noise level (IANL). It was decided that, despite sports halls having a slightly higher IANL threshold, the 35dB performance criteria would be applied across all areas of the school, with control of reverberation being a key consideration in the gym.Bauder Building BoardProject:Coláiste an ChláirínLocation:County GalwayProject type:New BuildRoof size:8550m²Main contractor:JJ Rhatigan & CompanyApproved contractor:Priority Roofing & Cladding LtdThe specification:The Architect specified that the insulation used in the flat roof system should be non-combustible and achieve a U-value of 0.16Wm²k which actually exceeds the thermal requirements as described in the Irish Building Regulations Technical Guidance Document L for flat roofs in schools.BauderROCK was specified to achieve the thermal and acoustic requirements of the design. As a Euroclass A2-s1,d0 non-combustible material, BauderROCK also provided the specified fire performance. This insulation could be used across all roof areas, with some adaptations for the gym which required additional acoustic performance due to the inherent nature of the space. Acoustic infills were used in the troughs of the perforated metal deck, thus combatting the reverberation of the indoor environment.  Products appliedBauder Thermofol PVCAn integrated single ply waterproofing system, featuring a lightweight, cost effective membrane which offers a pleasing aesthetic finish on a flat roof. This system holds fire classification BROOF(t4) for compliance with building regulations under TS 1187 test method 4 for external fire exposure to roofs. BauderROCKHigh density mineral wool insulation.Project challengesOne of the challenges of this project was the ambitious schedule. The use of the self-adhesive air and vapour control layer (AVCL) enabled the trades working within the building to progress quickly without being delayed by weather conditions. BauderROCK is relatively quick to install, as was the lightweight single ply waterproofing.  The resultThe project was finished to time and specification with exceptional workmanship from the fixers at Priority Roofing and Cladding and superb collaboration from all parties throughout. The membrane was finished with standing seams to create a statement look. The roof achieved a U-value of 0.15 W/m2k, exceeding the thermal target, and met or exceeded the 35db IANL requirement across the main building and the sports hall.  The thermal performance, which will hold up for decades to come, will also impart energy efficiency benefits that reduce running costs at the school in the long term. Finally, the non-combustible nature of the mineral wool insulation ensured that the build-up met the fire safety specification. System installed Bauder Thermofol PVC single ply waterproofing system1 Bauder THERMOFOL U15 V FRThis 1.5mm polyester reinforced Poly Vinyl Chloride membrane (PVC) membrane benefits from being highly flexible due to the incorporation of internal plasticizers during the manufacturing process. The combination of materials within this membrane provides high tensile strength, with thermal stability and chemical resistance.2 BauderROCKA mineral fibre non-combustible insulation with high acoustic performance. The dual density mineral wool composition delivers compressive strength, whilst keeping the overall weight to a minimum and providing high noise absorption which enabled the complete system to meet project requirements.3 BauderTEC DBR 06This 0.6mm, self-adhesive, elastomeric air and vapour control layer is light weight and benefits from cleaner, safer, and faster installation than traditional torch applied membranes. Advocacy Niall Hanley, Contracts Manager at JJ Rhatigan, the project’s main contractor, said:"Coláiste an Chláirín Athnery was a great success and in particular the use of the self-adhesive AVCL in advance of the build-up allowed works to commence immediately internally, which was critical from a programme perspective.” Kevin Ryan, Director at Priority Roofing, explained:"We found the system both practical and efficient to install. The combination of the availability of the products and the technical backup received was superior to any other system that we have worked with.”  Eoin O’Grady, Associate Director at Healy Partners Architects commented:"We are delighted with the overall delivery of the roof build-up and the performance achieved. The PE hall solution to deal with reverberation noise as well as rainfall noise was very successfully managed. We look forward to working with Bauder on future projects.” 
Sponsored
South Asia Gallery at Manchester Museum

South Asia Gallery at Manchester Museum

Junckers Ltd

Manchester Museum has opened a new gallery dedicated to South Asian culture where Junckers’ solid wood flooring forms an integral part of the interior scheme. The new gallery celebrates the lived experiences and contributions of the South Asian diaspora and is part of the Hello Future initiative, a Heritage Lottery Fund project to encourage diverse communities to visit the museum. Architects Purcell created a new two-storey extension which includes two new galleries, as well as re-designing the original buildings to add a new main entrance, foyer, and visitor facilities. The new building has achieved BREEAM Very Good standard and was designed to adhere to the conditions required for museum collections. The design also places a strong focus on inclusivity, with improved accessibility for all visitors. The interior, designed by Studio C102 and Mobile Studio Architects, takes its inspiration from South Asian architecture and design with a material palette of rich colours and textures. Junckers Oak Natural Pearl flooring is paired with hand-patinated brass panels and a deep ochre wall colour that brings South Asian culture and creativity to life, a fitting backdrop to the many interesting exhibits on display. Junckers’ oak flooring provides the museum with a durable surface to accommodate high foot traffic. Made in solid wood, the floor is easy to care for and maintain and with a proven long lifespan, the floor can easily outlast the building’s design life of 60 years. Junckers flooring contributes to a healthy indoor climate and helps minimise any static from electrical devices and equipment. Having undergone rigorous degassing and odour tests to ensure there are no chemical substances in the flooring which adversely affect the air quality in a room, all Junckers floors carry the Danish Indoor Climate label certificate. The South Asia Gallery is a British Museum partnership. 
Sponsored
HOTEL & SPA FACADE AND TERRACE CLADDING IN TECHNOWOOD

HOTEL & SPA FACADE AND TERRACE CLADDING IN TECHNOWOOD

Technowood UK

TASIGO Hotels group have used Technowood, to the extreme, in the centre of woodlands; an area of environmental importance and also one where special attention to existing tree positions was an insistence of the permission for this build.The real timber balustrade, handrails, cladding and partitions are all part of the package supplied by Technowood. The consistency, colour and texture of real timber were matched quite easily because it was real timber. With a 2mm thickness of FSC certified timber wrapped over extruded aluminium and sealed with an A2 FR certified chemical… unmatched in other products anywhere in the world.TASIGO Hotels & resorts have, at its centre, a beautiful Spa and Wellness Center surrounded by luxury hotel accommodation. This total structure is presented across a total area of 41 thousand square meters; furthermore, the facility has been designed as a modern sculpture which has adopted the traditions of Architecture and historical consideration of the region.The 3,500 m2 Spa and Wellness Centre, was planned in-ground. This would make full use of the geothermal characteristic of the land; enables natural daylight penetration through the domes placed on top of the terrace.The hotel, with panoramic views of the surrounding countryside, consists of 164 rooms. The facility also includes a 1.400 m2 convention area and multifunctional halls, as well as a 975 m2 pillar-free ballroom, swimming pools, children’s club, bar & restaurants and indoor & outdoor parking areas.Technowood products are innovative and specified around the world because of their adaptability, quality and fire rating of Euroclass A2.Come and see us or we can visit youIf you’d like to see Technowood up close we have a showroom in Amersham at The Sky House Design Centre. We are also more than happy to send our Technical Director to come and give you a CPD. They will bring a full set of samples for you to keep too.
Sponsored
STONEBOUND RESIN BOUND FOR KING’S COLLEGE LONDON QUADRANGLE

STONEBOUND RESIN BOUND FOR KING’S COLLEGE LONDON QUADRANGLE

Addagrip Terraco Ltd

Over 1800m2 of Stonebound resin bound permeable paving has been installed at Kings College University London to upgrade the existing surfacing for the historic quadrangle. The Strand Quad has been a part of King’s since the original university building (the King’s Building) was completed in 1831.SURFACING REQUIREMENTThis project aimed to modernise and improve the surface of the Quad and provide engineering research laboratories and teaching space for new undergraduate engineering programmes in Strand Campus Quad basement levels -1 and -2.A significant part of the plan was to remove the tired, worn asphalt and replace it with a new Resin Bound gravel surface, releveling and refurbishing the King’s Building steps.The requirement was to provide a clean, modern looking finish whilst remaining sympathetic to the Quad’s history and its surrounding, including the King’s Building and the East Wing of Somerset House, which are both Grade I listed. The paving needed to be decorative, low maintenance and durable with good slip resistance for the historic courtyard.Addagrip approved contractor TP Surfacing and Coatings were first contacted about the project by Farrans back in March 2009 to assist with the design, specification and installation of over 1800m2 of surfacing at the university. Stonebound permeable resin bound paving was selected to create the two colour design in bespoke blends and work commenced in April 2022 on the transformation.The surfacing was completed in May 2022 to the client’s satisfaction.Find out more about resin bound paving systems for courtyard projects
Sponsored
Altro Whiterock White - Capability Barns

Altro Whiterock White - Capability Barns

Altro

Altro kitchen system provides a perfect fitAltro Whiterock White, Altro Stronghold 30“We chose Altro Whiterock because it provides an easy to maintain, hygienic surface that is ideal for kitchens and have up to date fire certification.”Ben Rodgers,Cladpro LtdIssueBannold are one of the UKs largest independent family run suppliers of natural hard landscaping materials. Based in Cambridgeshire, Bannold wanted to refurbish 1920 railway carriages to create a tea room for customers.The Carriage Tea Room had a dated wooden substrate that needed to be replaced with a modern hygienic clinical finish for the kitchen facilities. The walls were not a square flat surface and needed a flexible product that could be fitted into the space. Floors and walls had to be easy to clean and maintain and fit into an environment without a straight line.ApproachCladpro are leading Altro Whiterock Premier installers specialising in hygienic wall finishes, floor coverings and ceilings. They suggested the Altro kitchen solution for the kitchen carriage. All the walls were thermoformed and wrapped to fit the unusual shape of the carriage.SolutionAltro Stronghold 30 keeps staff safe, with Altro’s highest slip-resistant rating of (PTV 55, R12) even with common kitchen contaminants such as grease, oil and flour. With 3mm comfort underfoot and 10dB impact sound insulation, it makes busy and noisy kitchen environments more comfortable for staff. Combined with Altro Whiterock it creates a full sealed solution to maintain the highest levels of safety and hygiene.
Sponsored
Munich Central Station – Mezzanine Floor

Munich Central Station – Mezzanine Floor

LSA Projects Ltd

An elegant, seamless grid ceiling and innovative LED lighting solutions from Durlum, specially developed for the mezzanine floor at Munich Central Station let the modernized underground city shine in new splendour. The perfect staging of the ceiling and light creates an extraordinary spatial experience with a feel-good character for the 200,000 daily passengers.The Munich architecture firm Auer Weber transformed the mezzanine floor into a space for movement based on the design principle of the “street” and relocated the existing shops to the edge of the basement. Clean colours, transparent materials and intelligent LED lighting systems create clear walkways and a new sense of space.The modern and jointless GEO ® wide grid ceiling from Durlum forms the basic structure of the mezzanine storey. 4600 PUNTEO ® -Q50 LED light points integrated into the grid ceiling create ideal brightness conditions in every area and avoid dazzling passers-by. Artificial suns with automatic light control at the staircases create a smooth transition from daylight to artificial light. A highlight on the barrier floor is the 132 m long light wall, which reacts to visitor flows and times of day with different light scenarios using intelligent lighting control from Durlum and creates unique lighting moods.The perfect interplay between the metal ceiling and modern LED lighting technology as well as the lighting control from Durlum make the mezzanine floor a real eye-catcher in downtown Munich and a showcase project in terms of sustainability.
Sponsored
ADDASTONE TP RESIN BOUND TREE PIT SURFACING IN EXHIBITION ROAD, LONDON

ADDASTONE TP RESIN BOUND TREE PIT SURFACING IN EXHIBITION ROAD, LONDON

Addagrip Terraco Ltd

Addagrip approved contractor, Resin & Rock were delighted to be appointed to install tree pit resin bound surfacing around the base of a number of the London Plane trees on the newly redeveloped Exhibition Road in the Royal Borough of Chelsea and Kensington.A 6mm Lucerne Silver was used to replace the existing self-binding gravel finish to fulfil the clients’ requirements for a porous, hard wearing and aesthetically pleasing surface capable of tolerating the high pedestrian flows in this busy street. A super-flex collar was included in the installations to allow for tree growth and to ensure that there was no loose aggregate.The low maintenance paving provides a seamless surface with excellent slip resistance and can be easily kept clean.The installation was completed in November 2014
Sponsored
Incarnation Secondary Glazing - Brunel House

Incarnation Secondary Glazing - Brunel House

Roseview Windows

Brunel House is a listed building being converted into luxury apartments. Replacing the primary windows was not permitted, so our client needed to look at a different solution to gain the thermal performance required.The windows were large sashes, requiring heavy duty frames with tilt facility, providing simple access to the primary windows for cleaning and maintenance. An unusual and bespoke feature of this project was - at the architect’s request - trickle vents installed in the bottom of the secondary glazing track.The end result is that, without any visible sign of works “Replacing the primary windows was not permitted” being done, tenants would experience comfort levels that match modern day double glazing, even though their windows are over 100 years old.
Sponsored
Manchester Central

Manchester Central

Savortex Ltd

Iconic Manchester Central Convention Complex is an exhibition and conference centre which has undergone a £30m renovation with a seating capacity of 9,500. As a leading venue, sustainability is at the heart of everything Manchester Central do.The centre attracts 500,000 visitors annually, so the senior management team had a desire to engage visitors better and transform the user experience. By switching to 50 SAVORTEX adDryers, the following benefits were delivered. 88% energy saving per dry vs previous dryerOperational savings from smart washroom cleaning alerts and analytics dashboard0% service disruption from remote product health alertsEstimated ROI: 7 months & CSR reportingAdvertising revenue-share
Sponsored
South Western Railway, UK

South Western Railway, UK

Vebro Polymers

Client: South Western RailwayLocation: Clapham, Farnham, Fratton & Bournemouth, UKYear: 2023Project size: 25000 m²Vebro systems: vebrodeck ID, vebrodeck MMA EDFour of South Western Railway (SWR)’s major traincare depots, required over 25,000 square metres of liquid-applied seamless resin flooring, linemarking and hatching.SWR manages 187 stations alongside 10 traincare depots and stabling sidings located across London and south west England.Train depots are large facilities or yards where trains are stabled adjacent to the main lines. Trains are parked at depots overnight, where routine cleaning and maintenance takes place at what are often 24-hour operational facilities.Having had a previously poor experience with seamless resin coatings, which due to insufficient advice at specification stage had resulted in spectacular failure of the coating across many of the traincare depots, a diligent and open approach was required for the client to regain confidence in the material, application methods and resulting finish.At the time of approaching Vebro, there was no specification in mind, just the urgent need to refurbish the facilities by replacing the existing coatings.Several Vebro Polymers solutions were used across the four SWR sites, all of which were determined through a detailed site survey and evaluation process, in which the specific use of the area in question, service criteria, level of traffic and realistic life expectancy requirements of the floor within the parameters of budget were all consulted.All covered walkways, or ‘roads’ as they are referred to by depot staff that run between tracks, as well as the sunken floors located in inspection pits were specified with the vebrodeck ID system in RAL 7037 Dusty Grey.Inspection pit walls were twice coated with a water-based, gloss-finish, epoxy sealer in RAL 9010 Pure White.Semi-exposed ramps, which are located at the end of each of the sheds, were specified with the vebrodeck MMA ED system to provide additional safeguards against the elements and enhanced UV resistance as well as ensuring the material can be installed within tight weather windows.All linemarking, cross-hatching and demarcation was meticulously completed using the vebro EP Universal LM product – a solvent-free epoxy line-marking paint incorporating a thickening agent to prevent seepage under stencils and tape.
Sponsored
Using Polytrol to revive a dull and faded garage door

Using Polytrol to revive a dull and faded garage door

Owatrol UK Ltd

We’re always so pleased when we hear from customers who have opted to use our products for their projects.When we received an email and some impressive before and after photos, from one such customer who had used Polytrol colour restorer to revive his garage door, we’re not exaggerating when we say that there was an audible buzz of appreciation in the Owatrol office as we took in the transformation.It was then that we knew that we had to share how Brian (our happy customer) had achieved this result, so that our other customers could benefit, too.First, clean your garage doorIf you want to replicate Brian’s success, it’s important to ensure that your garage door is prepped before application. Your door must be clean and free of any dirt, grease, mildew or grime.A bit of elbow grease and a bowl of soapy water is usually all you’ll need to do the job. However, if there’s any mildew on your garage door, scrub on a 50:50 bleach and water solution, leave it for 10 minutes, then rinse it off.If you have any polishes or waxes on your garage door, you will need to remove these too.Before moving on to the next step, ensure that your garage door is completely dry.Now it’s time to apply PolytrolA deep penetrating oil, Polytrol works by penetrating the surface of your door and re-wetting the pigments. This restores the colour that has been lost over the years, through exposure to pollution, rain and sunlight.Using a brush or a cloth and only working in sections that you can complete in 10-20 minutes, apply a liberal layer of Polytrol.As you work, if you notice any particularly matt and shiny patches, it means that the surface is absorbing Polytrol unevenly. If this happens, just move any surplus oil over to the matt areas.Allow the product to work for 10-20 minutes, then wipe off any excess with a clean, lint-free cloth. If you want a shinier finish, you can also buff the surface with a lint-free cloth.It really is as simple as that…Now, you just need to leave Polytrol to dry.One of the great things about Polytrol, is that it has been designed to dry to a tough and long-lasting flexible finish but with no film, so you won’t need to worry about it peeling or flaking.Plus, Polytrol is now also available in a spray can, to make application super simple.“Couldn’t have wished for a better result”Brian informed us that he:“just chanced upon your advert while browsing the net looking for a product that would improve the look of my door, and I am so very glad that I did…”In his email, Brian also said he “couldn’t have wished for a better result”. We have to agree – his garage door has been totally transformed.
Sponsored
Makeover for a Cedar Clad Garden Office and Gym

Makeover for a Cedar Clad Garden Office and Gym

Owatrol UK Ltd

It never ceases to amaze us what a difference a new finish makes to wood cladding. We have recently had a customer who was in desperate need of a makeover for cedar clad garden office & gym.Roger at R and A Pressure Washing has given us another great case study to show you and we think it’s looking amazing. When the office was installed 2 years previously, the customer had used Seasonite new wood protection to protect and stabilise the new wood. The wood therefore needed a good clean before a finish could be applied, as you can see:Now they wanted to complete the look and were straight back to Owatrol products with the help of Roger!Firstly, he applied Net-TrolBy using this powerful and fast acting wood cleaner and brightener, Roger was able to restore the natural colour of the cedar cladding and decking and clean it quickly and easily. Before starting work, Roger masked off all the areas of the building which he didn’t want to be treated.Net-Trol is non-aggressive and is harmless to plants, so Roger didn’t need to worry about it damaging the grass next to the garden office.Firstly, he wet the cladding and the Southern Yellow Pine decking with fresh, clean water.They then applied Net-Trol with a synthetic roller and then scrubbed the surface with a stiff synthetic brush.After leaving it to stand for around 15 minutes, the customer then scrubbed the surface whilst simultaneously rinsing it with water. You could also use a pressure washer, max. 60 bar.If the surface starts to dry while you’re leaving the Net-Trol to work, simply mist it with some water.If you want, you can repeat the procedure but in this case, the client did not have to.The customer then left the cladding and decking to dry for 48 hours before applying the finish.Next, Aquadecks was appliedA water-based penetrating wood finish that provides advanced UV protection, Aquadecks was the ideal choice to revive and protect this customer’s cladding and decking.One of the great things about Aquadecks is that maintenance is easy, with no sanding or stripping required.Roger applied a liberal amount of Aquadecks. He worked in sections that he could complete within 30 minutes, working in the direction of the grain.After the ‘wet look’ of the first application disappeared, he then applied a second coat of Aquadecks. He then allowed it to penetrate for 15-20 minutes.Roger then wiped away any excess Aquadecks that had not penetrated. This avoided it drying in shiny spots on the surface of the cladding.Aquadecks comes in a variety of colours but in this case the customer chose a Honey tint, which we think looks stunning.By using Net-Trol and Aquadecks, Roger has given his customer’s garden office and gym a makeover that has brought the building and adjacent decking back to life.
Sponsored
Kalwall Translucent Cladding - Mahwah High School

Kalwall Translucent Cladding - Mahwah High School

Kalwall

DAYLIGHT FOR SHOWCASING STUDENT SUCCESSWe have always recognised that daylighting is both an art and a science, which makes it an appropriate focal point for Mahwah High School’s new STEAM Lab. The STEAM (Science, Technology, Engineering, Arts and Mathematics) approach to education takes an important step in recognising the importance of and integrating the arts into a science-and-technology-geared curriculum. The arts foster creativity and ingenuity that allows for the successful application of other skills.The 9,000-square-foot facility—designed by Tokarski Millemann Architects and fondly nicknamed the “Thunderbird Think Tank” in honour of Mahwah High School’s logo—houses classrooms, indoor and outdoor labs and a gallery to showcase student projects.Tokarski Millemann was looking for the perfect material to use for the art gallery component of the facility. According to principal architect, Michael Millemann, “The vision was to create a ‘cube’ shaped space for the display of the students’ creative works which were previously tucked in a hallway. The material needed to create a beautiful glow from the exterior along with permitting only serene, diffused light to the interior.”Kalwall’s museum-quality daylighting™ delivers full-spectrum, diffuse natural light to allow for high visual acuity and accurate colour rendition within the gallery space. This creates a comfortable, welcoming environment for viewing artwork and other projects or hosting gatherings.A custom blue face sheet was developed to match the school’s logo. The blue is not a coating, but rather full-colour thickness through the entire exterior face, utilising Kalwall’s super-weathering technology. Due to the panel’s power of diffusion, the blue exterior does not affect the quality of light within the space, but it allows for a beautiful, soft glow at night that acts as a marquis for the school. During the day, Kalwall’s best-in-industry solar heat gain control prevents the cube from becoming a hot box and superior thermal performance ensures a comfortable environment all year long while lowering HVAC loads. Combined with daylighting’s ability to reduce reliance on electricity, Kalwall plays a major role in the project’s overall energy efficiency.Cost efficiency is another benefit Kalwall provided. Panels are low maintenance with a self-cleaning surface, meaning normal rainfall helps to keep the exterior free of sediment while at the same time retaining its original colour during the weathering process. The lightweight panel system minimised the need for additional internal structure for a very clean design, while rapid installation kept the project on schedule and on budget.“The Kalwall translucent panels exceeded our vision,” said Millemann. “We worked with Kalwall’s Steve Del Guercio and their team to develop a daylighting and structural strategy, and the custom panel colour. The Kalwall cube anchors the addition to the existing building and is a visual beacon located on axis with the entrance to the campus. Along with the client, we could not be happier with the final product.”The Mahwah High School STEAM lab will be an environment in which students can thrive for generations to come.Photos: Courtesy of Tokarski Millemann Architects
Sponsored
Case Study Sutton Station – Breathing new life into an old station

Case Study Sutton Station – Breathing new life into an old station

Twinfix Limited

Sutton station, owned and operated by Network Rail needed refurbishment. The station was showing signs of its age, with the old timber work in need of replacing, the roof leaking and the glass roof sections in need of some TLC. Due to their age, the glass roof sections had become fragile and had subsequently broken, Also because of the difficulty in safely cleaning them, they were proving more of a light blocker, than a source of natural light.It was decided that the glass roof sections would need replacing and in order to do this, Twinfix were consulted by Network Rail and asked to offer a solution. Twinfix were mindful of the aesthetics of the station but were also very aware that they could offer something which would provide a long-term solution for the station. Utilising their Multi-Link-Panel System, Twinfix put forward a solution which would do justice to the refurbishment work, the station was receiving whilst bringing the roof up to date and delivering an outcome which would last the test of time. By replacing the old steel and glass sections with their sustainable aluminium and polycarbonate Multi-Link-Panel System, Twinfix’s proposed solution would maintain the look and feel of the old roof, but deliver something which is virtually unbreakable, doesn’t need repairing or regular replacement and would allow routine cleaning to be carried out, keeping the station flooded with light. By replacing the old glass with a slightly obscured 6mm polycarbonate, the light inside the station would be diffused rather than harsh, and significantly brighter than the current situation.The new system would not only last the rigours of time, but is made of sustainable materials. Polycarbonate has minimal impact on the environment and is fully recyclable at the end of its long life. Polycarbonate panels, used in place of glass can be manufactured to give the same look as more traditional glass with features such as Georgian wired but with a significant weight saving. This weight saving means that transportation, manual handling of lifting is easier and requires less energy, plus the structural elements can be reduced as the weight they are required to support is reduced. The result is a total saving on energy and materials needed for installation. Once installed polycarbonate is considerably stronger than glass and is unlikely to break. Depending upon the requirements and location of the installation, Twinfix manufacture a ‘non-fragile’ version which, in testing could withstand far greater impact than an equivalent glass panel. This is especially good for areas where people might accidentally step or fall onto the panels such as rail station roofs. This inherent toughness also reduces the need to replace the glazing panel as often as glass and with UV coatings the panel doesn’t yellow with age or become brittle.Aluminium is known as the ‘Green metal’ due to its ability to be recycled again and again, without degradation of its inherent properties. Recycling aluminium also saves 95% of the energy required in the production of aluminium from raw materials. Compared to traditional steel, aluminium is approximately 2.5 times lighter, strength for strength, so again there is a weight saving comparable to that associated with polycarbonate over glass. Unlike steel, aluminium will not rust, and the application of powder coating will prevent corrosion. Powder coating is a pigment encapsulated in a powdered resin and then cured in an oven to harden the paint surface.Working with the roofing contractor, G.S. Moore, and as part of the larger station refurbishment, delivered by BAM Nuttall, Twinfix were able to replace the existing damaged glass roof in the entrance, the footbridge and the platform adding up to an area over 340 metres square, bathing the covered areas in natural light.Vicky Evans, Director at Twinfix, said; “It was a pleasure working with the team at Network Rail, G.S.Moore and BAM Nuttall. Sutton Station roof was in a dramatic need of replacement. We are proud of the finished product and that we were able to offer a long-term solution that delivers the aesthetic charm of the old roof, increases light levels for passengers, improves safety for all using the station and offers a sustainable, future proof outcome. We look forward to being part of delivering more excellent results for our clients in the future.”
Sponsored
Rockfon® Mono Acoustic enhances The Lantern, London

Rockfon® Mono Acoustic enhances The Lantern, London

Rockfon

The Lantern is the result of a wholesale redevelopment and reimagining of a large eight story building in Euston, Central London. Developer owners Lazari Investments have worked with Marks Barfield Architects to create a stunning scheme which successfully meets the current desire for built inner city environments to offer contemporary and elegant work space alongside areas designed for leisure, relaxation and retail therapy.Rockfon were very pleased to be specified for the project which offers 23,000m2 of mixed-use space including offices, café’s, shops and apartments. In addition there are large terraces and gardens on almost every level.The elegant solution to unwanted noiseAround 850m2 of unique Rockfon Mono Acoustic has been installed throughout communal areas, lobbies, thoroughfares and café’s throughout the building to deliver elegant sound control where the use of reverberant materials such as glass, stone, concrete and steel, added to high foot-fall would result in unwanted noise.8build were principle contractors for the scheme with Pacy & Wheatley Acoustics being responsible for the installation of Mono Acoustic systems. David Booth of the specialist firm spoke about the project, “We are proud of the work we’ve carried out at The Lantern, which presented a number of challenges associated with the myriad of services and fittings which go to make-up sophisticated contemporary mixed-use architecture. “The grid work and Mono Acoustic were installed to a wide variety of abutments in spaces throughout the building including within the large atrium, working around the many finishes and fire curtains to the front face of the lobby and glazed screens to either end. Fitting the ceiling to accommodate a stunning feature Italian light fitting suspended from 130 rods fixed to the structural slab called for exacting tolerances and really demonstrated the system’s versatility.”Seamless performanceMono is a ground-breaking product which combines a seamless ceiling with high performance characteristics. Ceiling tiles are installed and completed with acoustic render creating a smooth, monolithic surface which not only offers high sound absorption but also provides high light reflection and light diffusion, reducing the need for artificial light.The system allows for incorporation of lighting, audio and other mechanical systems whilst delivering Class A2 fire protection. It also offers dimensionally stability at up to 100% relative humidity and can be installed in temperatures ranging from 0˚C to 40˚C.Fully recyclable, all Rockfon ranges are made from a core of naturally occurring, non-hygroscopic and non-combustible stone wool. Their surfaces provide no sustenance to harmful micro-organisms, embody high humidity resistance and are impervious to most environmental pressures. With blue chip corporates including Fujitsu, Siemens and Bauer Media occupying space within the development, attention to detail was vital in helping create the perfect setting, which is known to aid productivity while contributing to employee wellbeing and retention. Acoustic control is also vital within places where people dine, with research showing customers are less likely to return to noisy restaurants. Commitment to wellbeingRockfon Specification Manager Alan Davies talks about the brand’s commitment to the sound control and wellbeing, “We are proud to be among a growing number of manufacturers to have its products assessed by Quiet Mark – the independent global certification programme associated with the UK Noise Abatement Society charitable foundation. Its international award programme recognises excellence in low-noise products, technology and solutions to unwanted noise - visit www.quietmark.com
Sponsored
Hardie® VL Plank - Upper Level Extension

Hardie® VL Plank - Upper Level Extension

James Hardie Building Products Ltd

Classic meets contemporary with new Hardie® VL Plank interlock board on new extension.Traditional home in Harrogate was extended at the rear with a new double-storey extension and contrasting tongue and groove Hardie® VL Plank weatherboard on the upper level.The homeowner chose Hardie® VL Plank board for its' fresh, symmetrical look and low maintenance properties. Here Anthracite Grey in cedar complements the local stone to offer a strong contrast. The end result is a striking renovation that beautifully captures the character of the home's local heritage. "Mixing traditional with modern was key to our design and so we quickly switched to Hardie® VL Plank for the crisp, clean lines to contrast with the exposed stone" - Private Homeowner.
Sponsored
R-Tile Textured Dovetail for a Vehicle Conversions client

R-Tile Textured Dovetail for a Vehicle Conversions client

R-Tek Manufacturing Ltd

Our client on this project specialise in vehicle conversions for all emergency services and government departments. They needed a reliable, reputable flooring company to assist them with their refurbishment.   The project requirements were:Surface area to cover 410m2 Must be able to handle vehiclesFire retardant - Bfl S1Fast installationImpact resistantNo adhesive or damp-proof membrane requiredColour optionsHardwearingReduce dust and noiseEasy to clean and maintainCE accredited R-Tile Textured Dovetail by R-Tek Manufacturing was the clear choice, we supplied and fitted a durable, hardwearing flooring suitable for their needs and requirements.(R-Tile Textured Blue -with some black tiles for a walkway had been selected by the client).
Sponsored
Altro Operetta - La Paz University Hospital, Madrid

Altro Operetta - La Paz University Hospital, Madrid

Altro

Comfortable space created for parents and babies at university hospitalIssueLa Paz University Hospital in Madrid is a national centre of expertise in neonatal care. They wanted to transform the Neonatal Acute Unit, to allow families to stay together with their babies while they are receiving treatment and care. In total, 24 units were created to accommodate and make this visit more comfortable.ApproachA homely, family-friendly space was needed that was also hygienic and reduced the transfer of noise. Víctor de las Casas, Architect at EACSN studio, said: “We wanted to modernise the neonatology area: not only in terms of materials, but in the very “neonatal concept” of La Paz, which wants to encourage parents to be with their children in the most normal and welcoming way possible”.SolutionSandra Fuentes, Maintenance and Works Technician at La Paz said: “The professional high standards of the medical team had not been reflected in the quality of the neonatal unit, and that was frustrating.” The flooring needed to be able to cope with foot traffic, hospital beds, trolleys and wheelchairs. It also needed good looks and design flexibility. The hospital team opted for robust Altro Operetta flooring, which provides 4dB impact sound reduction, comfort underfoot and ease of cleaning.Altro Operetta is a robust floor perfect for medium to high traffic areas and is easy to clean and maintain. Designed in line with the Bauhaus ethos that style is as important as function, it has multiple attractive, natural colours and finishes to fit in your interior design scheme."Altro Operetta gives the same warm feeling that carpet does, but also provides safety to both staff and patients." Sandra Fuentes Maintenance and Works Technician, La Paz University Hospital"Basically, all the technical issues have been resolved and the floor has provided more comfort for families staying in the unit." Víctor de las Casas Architect, EACSN Studio
Sponsored
Safety and rustic charm for Santa’s Woodland Workshop

Safety and rustic charm for Santa’s Woodland Workshop

Altro

IssueThe Woodland Village is a purpose-built facility within Sherwood Forest Center Parcs. The concept has been developed over several years across all Center Parcs villages providing a guest attraction dripping in the magic of Christmas from start to finish, offering more than just a “meet and greet” with Santa. The lights, music, animations, and the occasional elf, guide visitors on a journey through the Woodland Village and on to Santa’s Woodland Workshop.As a multi-functional facility, set in a forest, Santa’s Woodland Workshop needed a floor that could withstand all the “muck and mud” of the wilderness, trudged in by the rangers and their little helpers. The floor design would also need to be suitable when the village operates as a Christmas retail outlet providing welcoming aesthetics and having the durability to cope with heavy foot traffic.ApproachAltro floors have a proven history within Center Parcs having been successfully installed at Center Parcs villages across the UK and Ireland. Floors that matched the internal Woodland Village ‘earthy’ design, the corporate branding of the Rangers’ Hut and Christmas shop, providing safety from slips together with easy cleaning were required.SolutionWith PTV >36 slip resistance, Altro EasyClean Technology and a 10-year guarantee Altro Illustra was specified for the Rangers Hut, providing a naturally safe, clean, simple yet effective design. Able to cope with medium to heavy traffic with sustained slip resistance, Altro Wood was specified for Santa’s Woodland Workshop bringing a forest feel to the busy guest attraction.Of course, only families visiting Santa are allowed to see inside the Woodland Workshop and view the festive floors, “You see, Santa really does exist” said lead designer, Darren Binney of Jackson Design Associates Ltd.

Showing 1801-1836 of 1966

Feedback