NBS Source
I'm a manufacturer

"ground water control trench sheeting etc"

18,096 results found

Sort by:

Showing 1801-1836 of 1905

Sponsored
Chelwood

Chelwood

Michelmersh Brick Holdings PLC

Chelwood House by Napier Clarke is a clean, modern building in Chesham Bois, Amersham. It was built to replace an existing suburban house and is located within an area of special character meaning it was vital to seamlessly blend into the local area.Napier Clarke elected to use local brick and charred timber to ensure the house’s materials were able to sit visually well within the immediate area. Chelwood’s impressive size (5 bedrooms, 5 bathrooms, living space, snug, kitchen/ dining, play area, garage, utility room and an attic yoga room) and modern visual leanings were expected to be a challenge for local planning authorities. However, the building’s sympathetic materials and centrepiece vaulted roofs were inspired by the local area and the proposals were accepted.Chelwood introduces a cantilevered brick upper floor to its design which contrasts the simple design of the ground floor. Internally, the same materials used in its external spaces are repeated, creating a series of truly dynamic focal points.Chelwood uses legacy Michelmersh products in its production and recently won the Individual Housing Award in the 2022 BDA Brick Awards.
Sponsored
OPEN HOUSE - Cox Architects and ECLISSE

OPEN HOUSE - Cox Architects and ECLISSE

Eclisse UK

Situated in a peaceful borough of the busy Capital of London, Cox architects designed an accessible house swimming in style. They were able to meet necessary needs for the family whilst holding on to aesthetic features that add a stunning look to the property. A open and spacious interior was a must for this property, as were sliding pocket doors, hoists and a wheelchair lift. Essential materials were used to make this house accessible for the couples youngest daughter, who was diagnosed with a rare genetic illness at 18 months old.  The decision to extend the property was decided very early on with the potential of a large extension. The couple was able to add nearly 70sqm to the ground floor alone, helping to give the family more independent freedom and space. Accessible elements were incorporated in to an everyday home such as ECLISSE pocket door systems and ECLISSE hoist pocket door systems to create an environment that wasn't consumed by accessibility needs. LOCATION: London Borough of Lambeth, SW17STATUS: Completed 2019BUILT: Elson Construction & Co. LtdENGINEER: Steve NicolaouARCHITECT: Cox ArchitectsSPECIALIST GLAZING: Vision Design Projects LtdPHOTOGRAPHER: Matt Clayton PhotographySHOOT STYLIST: Camilla Hegarty
Sponsored
New Fencing at Elland Road, home of Leeds United Football Club

New Fencing at Elland Road, home of Leeds United Football Club

Lang+Fulton

49ers Enterprises Ltd, the corporate venture capital arm of The San Francisco 49ers focused on sport, has acquired full ownership of Leeds United Football Club with a commitment to bring fresh leadership, management and investment.Recent improvements at the Club have included a steel louvred fence.Lang+Fulton supplied an Italia-100 steel louvred fence to screen the parking area for coaches at the Club. Italia-100 provides a high level of security with anti-climb properties and 100% visual screening. The fencing stretches to 111 linear metres behind the West stand of the stadium.Each RHS post was double-holed to allow for the installation to be stepped along the entire length of the fence run to accommodate the gently rising ground. Access for the coaches was provided through an extra wide 7450mm double leaf gate.The specification for the fencing and gates was for a height of 2500mm. This was achieved by seamlessly stacking an extension panel on top of the standard 1975mm panel with a flat bar frame on either side.The panels posts and gates were hot-dip galvanized and polyester powder coated Grey (RAL7016) for a durable, long lasting finish.
Sponsored
East Carlton Country Park | Modular Changing Places Toilet

East Carlton Country Park | Modular Changing Places Toilet

CareSpaces by Wealden Rehab

The North Northamptonshire County Council approached Care Spaces to create a Changing Place facility at East Carlton Country Park due to a high number of disabled visitors. With limited space in the existing Visitor Centre, we installed a Care Capsule™, a modular Changing Place toilet designed offsite for easy transport and assembly. Facing access challenges, the Care Capsule™ had to be delivered in kit form and assembled on-site. Electrical and plumbing services were extended to the location. To minimize environmental impact, ground screws replaced concrete for stability without harming the natural surroundings.The customisability of the Care Capsule™ allowed the client to match the unit with the Visitor Centre's aesthetics, featuring a brick exterior and a steel security door. The unit met Changing Places standards, including Fibo® waterproof internal cladding. Care Spaces provided awareness training to park staff, and the client is pleased with the results, emphasizing the importance of accessible facilities for all visitors. Cllr Matthew Binley expressed delight, stating the facility at East Carlton Countryside Park ensures worry-free visits for everyone.
Sponsored
Case Study - Proteus Pro-Felt® - High Street, Polegate

Case Study - Proteus Pro-Felt® - High Street, Polegate

Proteus Waterproofing

Comprising of nine shops and several residential flats, properties 29-47 High Street Polegate required a full roof refurbishment after complaints of water ingress into the residential buildings. Proteus Waterproofing conducted a thorough survey which revealed that the existing roof build up, made up of a timber deck and 2-layer felt, had been previously repaired but was now at the end of its serviceable life.Being a residential building with a combustible deck, protecting individual properties from internal fire spread was a key consideration. Compartment walls were identified allowing Proteus Waterproofing to provide a solution that would meet regulatory guidance relating to the junction of compartment walls and roofs in Approved Document B whilst meeting the needs of the client.Proteus Waterproofing specified their robust reinforced bitumen membrane range of Proteus Pro-Felt®, including a bespoke hybrid insulation approach, where instead of a full replacement consisting of entirely non-combustible insulation, a scheme was designed to meet the requirements above and either side of the compartment walls, offering the client the most cost-effective solution possible that would also mitigate any unnecessary increase of weight loading elsewhere on the roof.High Performance WaterproofingThe waterproofing and existing deck were stripped back and re- decked with 18mm plywood. When removing the existing waterproofing, our approved contractor, carefully recorded the exact location of the party walls as no drawings of the upper story flats were available.Proteus Pro-Felt® SA AVCL was used as a vapour control layer to allow for the application of the hybrid combination of 150mm Proteus Pro-Therm PIR insulation and 150mm Proteus Pro-Therm Mineral Wool insulation. A thermal calculation was undertaken to ensure that the final result met the requirements of Part L of the National Building Regulations. These were both adhered with Proteus Pro-Bond Foaming Adhesive. Proteus Pro-Felt® SA Underlay Plain was laid and finished with Proteus Pro-Felt® Ultima Plus Fireguard Mineral Capsheet, providing the client with a fully waterproofed Part B and Part L compliant roof, guaranteed for 20 years.Proteus Waterproofing worked closely with the Proteus Approved Contractor, to ensure the project was delivered to a high standard.Health & SafetyWhen working on occupied buildings, safety is always of utmost importance, as well as keeping disruptions to a minimum. The Proteus Pro-Felt® range have been tested to the highest European Classification of BROOF(t4), making it the ideal system to use on all buildings, as the risks to residents, property and members of the public are greatly reduced. All Proteus Waterproofing specifications promote fire safe installation methods conforming to the industry lead Safe2Torch guidelines. Proteus also have a range of cold liquid applied membranes which are also BROOF(t4) certified.Long Term PerformanceProteus Pro-Felt® offers high-performance bituminous membrane systems, tested to perform in extreme temperatures and weather conditions, while offering clients a robust and cost-effective waterproofing solution. Proteus Pro-Felt® Ultima Plus range retains its high polymer performance. Its class leading, high quality modified bitumen content allows this flexible membrane to move with the building and ensure long term durability and performance with third party BBA accreditation and guarantees available up to 30 years.
Sponsored
False Fire Alarms Continue to Cost the UK

False Fire Alarms Continue to Cost the UK

Safety Technology International Ltd

False fire alarm numbers continue to rise post-pandemic causing major issues for the economy by wasting vital time and resources.The latest Home Office figures from year ending September 2022 reveal fire and rescue services attended 238,885 fire false alarms, the largest total of false fire alarms in over a decade, an increase of 10% compared with the previous year.With an 18% increase from the previous year for malicious false fire alarms, 6,473 false alarms were determined, the number still rising post-COVID.False fire alarms continue to be the largest proportion of incidents attended at 38% and so it is increasingly important to minimise false alarms to ensure both the safety of individuals and the efficient use of emergency services.A teenager was arrested in Aberdeen after setting off fire alarms more than a dozen times, which police investigated as ‘deliberate and malicious’. Firefighters attended calls and wasted time and resources, meaning they could not respond to real emergency calls.False alarms are costly and disruptive, amounting to around £1 billion a year for the UK they often require emergency responders to mobilise and respond to a non-existent emergency, wasting resources and time.False fire alarms can be costly for building owners with fines introduced for repeated false alarms from emergency services, as they may have to attend multiple times, causing a drain on resources that could be better used elsewhere.They can also cause panic and confusion, particularly if they occur frequently, making it harder for people to take the necessary steps to evacuate safely in the event of a real fire. Frequent false alarms can lead to complacency among building occupants, who may not take real fire alarms seriously, potentially putting themselves and others at risk.Firefighters attended false alarms a considerable number of times at Basset Lodge, an independent living facility for many elderly and disabled people. False fire alarms are not only disruptive for staff and residents, but also pose a risk to their safety, and place additional strain on fire and rescue services. These repeated false alarms can lead to complacency in the public, lowering the sense of urgency in real evacuations.Protective covers can help to control the number of accidental and malicious fire alarms, but there are many ways in which you can reduce false alarms, for example regularly checking and testing equipment to ensure it is not faulty is one approach to preventing unnecessary risk for the fire department and public from false alarms.As the original call point cover manufacturer, Safety Technology International manufacture tough covers have been specifically designed to help deter false fire alarms and to prevent malicious or accidental activation of manual call points. The strong, durable construction of our polycarbonate call point protectors means they can withstand the toughest knocks, whilst offering lasting protection against false fire alarms. With various models available in a range of sizes and colours, and multi-language or custom text options, we have covers suitable for most applications or devices. Sounder models help to deter malicious activations with an audible alarm that draws immediate attention to the area. Waterproof models also allow for outside application, protecting devices and manual call points against the ingress of dust or water.
Sponsored
BB93 Solution for Teeside University

BB93 Solution for Teeside University

CMS Danskin Acoustics

Sound-absorbing ‘trees’ installed at Teesside University LibraryTeesside University’s Middlesbrough campus has benefited from over £270 million of investment in recent years, including a £6 million refurbishment programme for the university library. The library’s first floor was the second phase of the refurbishment, opened on 7 October 2016, and includes a unique and visually striking installation of CMS Danskin’s SuperPhon panels, designed to represent two trees.The ChallengeThe original building was constructed in 1997 and incorporated some sound absorbent materials; the refurbishment had to inject new life into the interior whilst also enhancing the library’s acoustic performance. The open-plan layout, which can have up to 450 students using it at any one time, presented a particular challenge for controlling the build-up and spread of sound.Class A absorbent rafts and baffles were recommended by Apex Acoustics to act as noise barriers as well as provide sound absorption, and control the spread of sound throughout the space. The space was zoned for noisier and quieter activities and acoustic consultants Apex Acoustics undertook full modelling to determine the optimum arrangement of rafts and baffles.The SolutionCPMG Architects, who were tasked with the refurbishment, worked to integrate the recommended Class A absorbent rafts into the library’s interior scheme, which used a contemporary palette of materials and a focused colour strategy. Two identical ‘trees’ were created at either side of the library’s first floor, using CMS Danskin’s SuperPhon Acoustic panels to represent the foliage.Circular panels of varying sizes and different shades of green were suspended from the ceiling and arranged around two structural concrete columns, to look like abstract trees. The panels were bespoke and CPMG Architects was able to specify the material used to cover them, and the colours. Some of the panels had to be made and supplied in two halves, and constructed on-site, due to their size. The ‘trees’ also had contemporary lights suspended from the panels, to represent hanging fruit.The ResultThe two sound-absorbing ‘trees’ represent a visually striking and unique use of CMS Danskin’s SuperPhon panels.Richard Thorpe of CPMG Architects said: “We went for the SuperPhon panels because of what we could do with them – the bespoke service gave us scope to play around with the design and come up with something quirky and interesting. We were able to create an attractive design feature which had a very practical purpose – to reduce reverberation in the refurbished library.”The project was completed at the end of September 2016 and the refurbished floor is now open to students.
Sponsored
Aviation Hangar Heating - Boscombe Down

Aviation Hangar Heating - Boscombe Down

Powrmatic Ltd

OverviewA successful installation of 40 x Powrmatic SRP U Tubes at a hangar facility in Boscombe. With the system design by Powrmatic, ABS, a leading HVAC and installation company, was entrusted with this significant installation project. The installation aimed to provide efficient heating performance, reduce energy costs, and improve the overall comfort and functionality of the hangar.Project BackgroundThe Weighbridge Hangar Building 499 at MOD Boscombe Down operated by QinetiQ required a new heating system due to the life-expired existing system. The hangar required a powerful heating system that would operate efficiently during the cold winter months while reducing energy costs. A new Powrmatic SRP U-tube herringbone radiant heating system was produced in line with the design intent of WYG on their tender documents. J & B Hopkins secured the M & E contract and employed the services of ABS Ltd to undertake the installation of the radiant heating system. ABS Ltd, formed in 1978, offers a full range of professional services including the installation and maintenance of both radiant and warm air heating systems to both commercial and industrial properties throughout the UK.SolutionThe MOD hangar facility, situated on an exposed location, at Boscombe Down required a robust heating solution to withstand the cold winter months. 40 Powrmatic SRP radiant U Tube PVU50 Hi/Low heaters each rated at 50kW on a herringbone system layout with ducted fresh air onto each burner to comply with fire safety standards were installed by ABS Ltd. To maximize efficiency, the heaters mounted at an impressive height of 23 meters in line with Powrmatic’s design drawings were arranged in 8 lines of 5, with 3 heaters connected to one fan and 2 heaters connected to another fan. The heating system incorporated Powrmatic MC200 controllers and black bulb sensors for precise temperature control across the hangar.ResultThe final stage of the installation was completed by J & B Hopkins, arranging for the necessary gas and electrical distribution services to the radiant heaters and discharge fans. The 40 Powrmatic SRP radiant U Tubes installed by ABS Ltd effectively heated the facility, providing a comfortable and conducive environment for the workforce during the winter season. Additionally, the new heating system reduced energy costs and eliminated the need for multiple exhausts on the rooftop hence retaining the aesthetic design principles of the hangar. The commissioning was successfully carried out when all services were completed, providing a satisfied client with a capable heating installation within the hangar, for the exposed site location.
Sponsored
Britmet Lightweight Roofing: Slate 2000 and BritFrame in Social Housing Case Study

Britmet Lightweight Roofing: Slate 2000 and BritFrame in Social Housing Case Study

Britmet Lightweight Roofing

This case study highlights the successful implementation of Britmet’s flat-to-pitch conversion system, BritFrame, and lightweight metal roof tile, Slate 2000. The project, carried out by Jennings Roofing encompassed a total area of 500 square meters and aimed to improve the infrastructure of the existing roof. This case study examines the benefits, challenges, and outcomes of utilising Slate 2000. This case study highlights the successful implementation of Britmet's Slate 2000 roofing system and Britframe structural solution in a social housing project. The client, a new customer of Britmet, discovered the systems at the UK Construction Week (UKCW) exhibition. Impressed by the innovative design and features, the client expressed interest in utilising Britframe for a flat-to-pitch conversion project in their social housing development. The client is a housing association responsible for managing and maintaining a portfolio of social housing properties. They were seeking an effective solution to address various issues with one of their buildings, including an ageing roof with multiple repairs, inadequate insulation, and inefficient rainwater management. The objective was to enhance the building's aesthetics, improve water tightness, increase energy efficiency, and minimize future maintenance requirements. The initial meeting between the client and Britmet took place at the UKCW exhibition, where the client became acquainted with Britframe, a lightweight and versatile structural solution. Intrigued by its potential, the client arranged for an on-site visit to further assess the feasibility of utilising the Britframe and Slate 2000 roofing system for their project.Slate 2000 is a durable and aesthetically pleasing lightweight roofing material that offers long-term performance and weather resistance. It's stylish design and robust properties make it an ideal choice for enhancing the visual appeal and durability of roofs and cladding. During the initial site visit, Britmet's team evaluated the existing roof condition, rainwater management system, and insulation levels. After careful assessment, they provided the client with a budget price estimate for the proposed project. The estimate included the cost of materials, labour, and necessary ancillary items. To streamline the project, the client signed a Project Assist agreement with Britmet. This allowed Britmet to obtain planning drawings and submit the necessary applications on behalf of the client. Additionally, Britmet provided structural calculations, design drawings, and rainwater calculations to ensure compliance with regulatory standards and best practices. The main objective of the project was to convert the existing flat roof to a pitched roof using Britframe and install Britmet's Slate 2000 roofing system. This conversion offered numerous advantages, including improved water tightness, increased insulation, and resolved rainwater management issues. Notably, the internal gutters, which had caused maintenance problems, were relocated externally as part of the new design.Beyond functionality, the new roofing system and structural solution significantly enhanced the building's aesthetic appeal. The modern design of Britframe, combined with the stylish appearance of Slate 2000, seamlessly integrated the property with its surroundings. The improved visual aesthetics added value to the social housing development. One of the key benefits of choosing Britmet's Slate 2000 and Britframe was the assurance of minimal maintenance requirements. Unlike the previous roof covering, which had undergone numerous repairs and reached the end of its life, the new system was designed to be durable and long-lasting. This eliminated the need for ongoing maintenance and reduced future costs for the housing association.Through the adoption of Britmet's Slate 2000 roofing system and Britframe structural solution, the social housing project achieved its objectives of enhanced aesthetics, improved water tightness, increased insulation, and efficient rainwater management. The collaboration between the client and Britmet, from the initial meeting at UKCW to the successful implementation of the project, demonstrated the value of innovative roofing and structural solutions in the social housing sector.
Sponsored
Leeds Beckett University

Leeds Beckett University

Ecoprod Technique

Louise Lyttle – Campus Service Supervisor"I am the campus supervisor in charge of all the cleaning in the University. The waterless urinals were installed in the food court last September as part of the University’s Green Impact initiative.They were installed while I was on holiday. When I came back everyone was gushing about these waterless urinals but I was very sceptical. I thought there was no way that they would work, that they would stink and so on, but they’ve been absolutely amazing.I’m a massive convert – if I had my way they’d be installed all over the campus."No more odour"I can’t believe how fantastic they are and that they work so well without needing any running water. They always look clean, they always smell clean and they’re 100% easier to clean because there’s no water going into them."Much easier to clean"Cleaning them is so much easier than cleaning traditional urinals, and more efficient too. I can’t believe how long the cleaning fluid lasts for. I thought we’d go through bottles and bottles of it but we don’t.With traditional urinals you often have a constant trickle of water through them which means you can get lots of problems with limescale and other marks which can be really difficult to clean off. You don’t have any of these problems with the waterless urinals. They’re much easier to clean and, importantly, they always look clean too."No more blockages or flooding"We used to get a lot of blockages in traditional urinals on campus and they can cause all kinds of problems but we haven’t had any of that with the waterless urinals.The traditional urinals run on battery sensors that regulate the flush. From time to time the battery runs out and if the guys don’t spot that on their check then they don’t flush at all for a few days which causes huge problems with odour. It’s not an issue at all with the waterless urinals.Similarly, we used to get overflows and floods caused by blockages in the traditional flushing urinals. These can be hugely damaging. If they happen over a weekend then you can come in on Monday and find that you’ve got a ceiling down on the floor below. Again, the waterless urinals remove this problem completely."Smells lovely and looks clean"I’m converted. If it was up to me we’d have them all over the campus. It’s such a big difference – if you go in the gents now it alway smells lovely and looks so clean.We have an external cleaning company that does most of the cleaning on campus. When we first installed the waterless urinals we put one of our own cleaners in to clean them, our team leader trained her on the correct method and then trained the external cleaners. They all picked it up straight away. They’ve had no problems with it and they never get mixed up.The feedback from the cleaners is really positive. They find the waterless urinals much easier to clean. You just spray them and wipe round – no more scrubbing or rinsing."Positive feedback from students"We’ve put a sign up explaining to the students what the waterless urinals are about. A few found it strange at first but the only comments we get are about how great it is that the urinals don’t smell like they used to."Great service from Ecoprod"Dealing with Ecoprod is great. The pods need replacing every few months. I raise a purchase order and as soon as Ed sees it he sends out the order and it’s here the next day.It’s fantastic service. I know within two days of placing the order that I’ll have the replacements so I never need to worry. The service from Ecoprod is really good."
Sponsored
Marischal Square

Marischal Square

Bauder Ltd

Marischal Square Bauder Bakor Hot Melt structural waterproofingSynopsisMarischal square is a mixed use complex in the centre of Aberdeen based on the site of the former council headquarters building, St. Nicholas House. In 2011 Muse Developments undertook a £107m redevelopment of the site creating space for two new office buildings, seven restaurants and café bars, a 126-room hotel, a modern civic space and a new public space area in between the new buildings.Bauder Building BoardProject:Marischal SquareLocation:AberdeenRoof Area:5,400m²Client:Muse Development & Morgan SindallApproved Contractor:Briggs AmascoThe specificationWith large parts of the new roofing areas being accessible terraces and areas which will experience a significant amount of foot traffic, the Bauder hot melt structural system was a natural choice. The system was combined with hard and soft landscaping to provide the different aspects of the various terraces, stairways, podium decks and rooftops.The Bauder Hot Melt structural waterproofing system is ideally suited as a waterproofing system beneath paved or ballasted surfacing, car parks, podiums, plazas, green roofs and substructures.Project challengesA key challenge for this project was the fact that Muse Developments and Morgan Sindall, who were working jointly on the development, were looking for a single source waterproofing. Bauder proved to be the perfect fit, covering and delivering all elements of the waterproofing systems.The resultApproved contractor Briggs Amasco carried out the works on the 5,400m² of the separate roof areas, whilst expert Bauder site technicians carried out a total of 26 site visits over the duration of the project to ensure the quality of the installations. Following a final inspection, Bauder was able to issue a 20 year product and workmanship guarantee on the project.System installed1 BauderPLANT E 42Green torch-on root-resistant capping sheet.2 790-11Hot melt rubberised bitumen asphalt with a percentage of post-consumer recycled materials that infills and fully bonds to all minor deviations in the deck.3 DeckPrimed concrete.
Sponsored
Durlum Polylam at The Sands

Durlum Polylam at The Sands

LSA Projects Ltd

The Sands - Durham WaterfrontArchitect: Ryder Architecture LtdInstaller: Pennine ContractsProduct: Durlum Polylam BafflesLSA Projects supplied over 300 linear metres of Durlum Polylam baffles to the new facility The Sands on Durham Waterfront in the city centre. The new riverside development was intended to move the County Council headquarters into the city centre for improved public transport connections for staff and other visitors.In 2022 the building applied for change of use planning to convert the landmark building into additional learning spaces for Durham University Business School. The change of use allows the department of the Russell Group university to move straight into the ready-made facility after delays with their original plans for a different site.The £50m facility has space for the 2,300 students and members of staff at the business school across the 1.4 hectare site. In addition to traditional learning spaces the building has modern working space for staff and academics and hopes to attract leading businesses to work with the university and graduates.Durlum Polylam baffles were used for the feature ceiling in the main event space. The ceiling is made up of 320mm deep 100mm wide baffles in concentric squares with the outer square measuring an impressive 20 metres across. Polylam pieces were finished in a Dur-Graphic faux Cherry veneer print and mounted in 9 double-row rings with alternating strip lighting and integrated ventilation systems.Polylam from Durlum is a versatile ceiling system made up of vertical baffles available in a range of sizes up to 100mm wide by 800mm deep. Pieces can be installed using suspension grid systems available from Durlum in a variety of ways including independent mounting and group mounting with regular spacing and options for demount-ability.Baffles are made from either galvanised sheet steel or aluminium and finished in a choice of RAL colour powdercoating as a standard with options for gloss and metallic finishes as well as Dur-Graphic and Duroplan printed designs. Acoustic perforations can also be applied to the baffles as well as incorporating Dur-Sonic acoustic mineral wool filling to the inside of the hollow baffle lengths.
Sponsored
That hard-working industrial look

That hard-working industrial look

Powdertech (Corby) Ltd

Project OverviewThe Percy Gee Building, at Leicester University, is named after a former benefactor and chairman of the former college. Over the last 2-3 years the building has undergone an exciting £13.1 million transformation and expansion. This is a multi-purpose facility, home to the Students’ Union, a venue for informal learning and a centre for refreshment and eating.PLEASE NOTE: BETTER IMAGES WILL BE POSTED WHEN WE CAN ACCESS TO THE BUILDING WHICH IS CURRENTLY CLOSED DUE TO COVID-19. THESE PHOTOS WERE TAKEN THROUGH A GLASS WINDOW. That hard-working industrial lookA main hub of the building will be ‘Campus Kitchen’ a new food court which will provide a range of varied cuisines for staff, students and visitors This is an interior occupied by Millennials and Gen Z and the décor needed to reflect their styles and trends. By using Amron Welltec “wave” or “corrugated” profiled aluminium sheet on an interior wall something new and unexpected was injected into the kitchen space. To take this ‘jolt away from the norm’ still further the designers envisaged not shiny metal, but the appearance of weathered and rusted metal – an industrial ‘vibe’ perhaps hinting at determination and hard work.Powdertech Collections includes a range of finishes which replicate patination/rust on metal, giving a ‘Corten’ appearance but with no rusty residue which could mark clothing and other surfaces. The client chose ‘Firebox’ from the Evolution/Rust collection. This gives a very natural ‘rusted’ look with no two panels looking the same. Powdertech applied Firebox to 80 m2 of material which line the walls and over-counter area of the Campus Kitchen.BenefitsEvolution™ Rust finishes can be used internally and also externally. There is no residue, and no run-off or staining from rainwater.The striking designs are achieved through using polyester resin systems, and a bit of magic!The finish can be cleaned like any other powder coating – minimal maintenance.We are passionate about colour and always keep up with latest trends in shade and texture of finishes.The Evolution range has up to a 25-year guarantee for gloss, colour and adhesion.Conforms to ISO 12206 and Qualicoat specifications.
Sponsored
Podium Landscaping, Roofdrain & Advanced Turf System, Edinburgh Quartermile, UK

Podium Landscaping, Roofdrain & Advanced Turf System, Edinburgh Quartermile, UK

ABG

The Quartermile development is a cosmopolitan mix of luxury apartments, cafes and businesses in the heart of Edinburgh city centre. The masterplan for the new area is designed by Foster + Partners and enjoys views of some of Edinburgh’s greatest landmarks. The access to the new building (adjacent to the old Edinburgh Royal Infirmary site) is elevated from the North Meadow Walk pedestrian walkway and cycle route. The pathways and landscaped areas in front of the development needed a structural drainage solution and reinforced turf area that would be suitable for trafficking by maintenance and emergency vehicles when required.ABG’s high strength Roofdrain 60S+RX geocomposite was specified to provide sub-surface drainage across the base of the podium deck. The drainage board provides a high flow capacity void to channel water pressure to the surrounding perimeter drains. By utilising a 60mm drainage layer the need for much deeper and harder to install drainage stone layers can be minimised. The carbon footprint for the product is just 3.3 kgCO2e per m2 which is an approximate 50% saving compared to the embodied carbon of quarrying, transportation and installation of the equivalent thickness of drainage aggregates. Once installed the Roofdrain core is filled with pea gravel to provide a rigid sub-base beneath a bedding layer and resin bound gravel pathways. The drainage core features regular perforations to allow surface water to percolate and drain to the underside of the board. Adjoining rolls can be easily overlapped with the cups designed to slot  into one another. The Roofdrain was overlaid with a Terrex NW9 geotextile to prevent fines entering the drainage core. The Roofdrain can be stepped to cascade into lower sections to suit the landscaping layout. The main green area to the front of the building was cultivated using the Advanced Turf reinforced grass system. The Netlon Advanced Turf System (Netlon ATS) is a high performance, mesh-element reinforced natural grass rootzone system that provides a SuDS compliant free-draining grassed surface. It consists of a high quality, sandy soil rootzone into which thousands of playing card sized polypropylene Netlon plastic mesh elements are pre-blended. The composite mesh reinforced rootzone and selected turf are then delivered to site as a system. ATS was specified for this development to support loading by occasional MEWP vehicles such as cherry pickers, and in the event emergency vehicles need to traffic onto the grass.
Sponsored
Edith Neville Primary School, Camden

Edith Neville Primary School, Camden

Anderson, GEC Ltd

The fit-out of a new primary school building in North-West London has featured the installation of half a dozen different configuration of high quality stainless steel work-surfaces within its teaching, staff and family areas, specified for their durability and visual appeal as well as the creation of hygienic, easy to clean and maintain facilities.The Edith Neville Primary School in Camden has been built by Orpington based Neilcott Construction for the London Borough of Camden with Hayhurst and Co. Architects leading the design team. Project Architect, Jamie Wakefield, commented: “I had seen GEC sinks on another project and we specified them as part of a full Stage 4 design for the Edith Neville Primary School, which has been built for the London Borough of Camden. Schools inevitably get some very heavy usage, but with stainless steel it is easy to clean the surfaces up and get them looking smart again and they’ll still look good in ten years’ time. The different GEC fabrications feature throughout the new school as classroom art sinks, tea-point countertops and in spaces such as the family centre. There is also one in the staff kitchenette and a special studio space. We’re very pleased with how they look and they are working well for the school.”The many and varied units supplied by G. E. C. Anderson include a total of 16 in varying sizes from 1440mm long x 600mm deep and up to 3073mm long x 650mm deep, all with flat surfaces for food preparation and stacking dishes, including ten units supplied with one full size sink and six with a full sink together with half sink, plus three with cut out for cooker hobs, while 300mm high splashbacks- again in stainless steel, help prevent water or waste material staining or damaging the walls. The tops also incorporate five different edge details for such purposes as preventing water run-off.Since its formation in 1962, GEC Anderson has built its reputation for the supply of top end stainless steel sinks and sanitaryware on a combination of innovative design, top quality materials and expert craftsmanship. In addition to the company’s Decimetric system of cabinets, sinks, drainers and other equipment - widely specified for sectors including health and catering – it is able to create custom engineered solutions to exactly fit any space or specification.
Sponsored
Sixmilewater Park | Anti-Slip Decking For Public Boardwalk

Sixmilewater Park | Anti-Slip Decking For Public Boardwalk

Gripsure (UK) Ltd

Sixmile Boardwalk is a wooden walkway located in Ballyclare, a town in County Antrim, Northern Ireland. The boardwalk stretches for over a mile through Sixmile Water Park, providing visitors with stunning views of the surrounding natural beauty. The boardwalk is an accessible and family-friendly attraction that allows visitors to explore the park’s wetlands and wildlife, including ducks, swans, and otters. It is a popular destination for walkers, joggers, and cyclists, as well as families and nature enthusiasts. The boardwalk also features several rest areas and interpretive signage, providing visitors with information about the park’s history and ecology.The second phase of the Antrim Boardwalk refurbishment project involved an extension and upgrade of the walkway, including the removal of existing slippery timber deck boards and replacing these with new anti-slip timber deck boards. For this, Gripsure’s non-slip Premier decking were carefully chosen for the new raised boardwalk and viewing platform area, installed by Martin Contracting Services Ltd.Primarily chosen for its safety benefits, Gripsure’s Premier profile achieves a PTV rating of 78 assuring a safe and comfortable walking surface for visitors, even in wet or damp conditions. Gripsure decking has been tried and tested on projects for over 15 years and is now trusted by many household names, such as Center Parcs and Samsung.In addition to the proven safety benefits, the Gripsure decking used at Sixmile Boardwalk is also extremely durable and long-lasting, making it a cost-effective choice for Antrim and Newtownabbey Borough Council. The decking requires minimal maintenance and is resistant to rot, decay, and insect damage, ensuring that it remains in excellent condition for years to come.Overall, the Gripsure non-slip decking used at Sixmile Boardwalk has been a great success, providing a safe and sustainable solution that enhances the park’s natural beauty and functionality. The decking has helped to increase visitor safety and comfort, and has helped to make Sixmile Water Park a more accessible and enjoyable destination for visitors of all ages and abilities.The Mayor of Antrim and Newtownabbey, Councillor Billy Webb, said: “These refurbishment works will bring more footfall to Antrim town centre and help us tackle the challenges of climate and environmental change by encouraging active travel whilst also proving a local business with the contract.”All media is courtesy of Martin Contracting Services. ©2022 Martin Contracting Services
Sponsored
Südanit 280 Alpha Hemihydrate | Mobile Screed Factory | Fast Floor Screed | 20,000 m2 apartments Dublin

Südanit 280 Alpha Hemihydrate | Mobile Screed Factory | Fast Floor Screed | 20,000 m2 apartments Dublin

SMET Building Products Ltd

We supplied our Südanit 280 Alpha Hemihydrate Binder to our Smet Supported Partner, Fast Floor Screed Ltd, who pump-applied their self-levelling, Südanit 280 Alpha Hemihydrate Screed in this amazing new apartment development for Cairn Home Plc in Dublin.The delivery, completed using their mobile screed factories, enabled Alpha Hemihydrate Screed flooring solution to be installed quickly and efficiently over the entire project over two sessions. The apartments are amazing looking: https://www.cairnhomes.com/new-homes/marianella/This CE marked, self-smoothing, self-levelling screed is the most technologically advanced floor screed available, complying with the performance requirements of EN 13813.Südanit 280 Alpha Hemihydrate Screed’s advanced composition means that it reacts with water quickly – providing consistent, reliable drying characteristics and considerably faster drying times – enabling follow-on trades to proceed without delay.The Fast Floor Screed Mobile Screed Factory – is a unique system. The lorry mounted rigs carry Sudanit 280 Alpha Hemihydrate binder, sand & aggregates and water in separate compartments. The automatic production process ensures materials are precisely weighed, fed to the mixing bin, and into the pump for easy, mess-free installation. Ensuring the Fast Floor Screed Mobile Screed Factory produces Sudanit 280 Alpha Hemihydrate floor screed to a consistently high quality. Have a look at Fast Floor Screed past projects.The floor is remarkably quick to walk-on – applied at 500m² per day and walkable within 6 hours and it’s particularly suitable for use with UFH, fully encapsulating pipes and services – increasing the performance of underfloor heating, maximising your insulation, and therefore improving your building’s U-Values performance.Check out more projects using this screed:https://www.smetbuildingproducts.com/projects/by-product/casea-sudanit-280-alpha-hemihydrate-binder/Whether your job is self-build, retro-fit, floor renovation, design, commercial or industrial venture – we have a floor compound suitable for you.Contact Smet Building Products Ltd for any advice regarding your substrate.Related DownloadsTDS CASEA Sudanit 280 BinderEPD – CASEA Calcium Sulphate Flowing ScreedTDS SMET_Tiling Onto Calcium Sulphate Floor Screed_System ITDS SMET_Tiling Onto Calcium Sulphate Floor Screed_System II
Sponsored
Absorb-R GypLine αw Acoustic Plaster Lambeth Town Hall

Absorb-R GypLine αw Acoustic Plaster Lambeth Town Hall

Soundis

Lambeth Town Hall, a Grade II listed building designed by the well-known architects Septimus Warwick and Austen Hall, was opened on 29 April 1908 by the then Prince and Princess of Wales, subsequently King George V and Queen Mary and is a fine example of the Edwardian Baroque style of civic architecture.The remit for the New Town Hall was to provide a more peaceful working environment where council workers were not disturbed by noise levels and reverberation issues. As an example, where poor sound absorption and poor reverberation control is not resolved, staff members often experience problems with concentration, fatigue and headaches so practical work is always disturbed instead of being a pleasant working space.Soundis supplied and installed a Monolithic Absorb-R GypLine αw to the existing soffits and ceilings to create a Semi-Textured Finish to soffits and a Semi-Smooth Finish to public spaces and council meeting rooms.Morgan Sindall have monitored progress with pre-completion quality results and on site satisfaction reports which indicate that exceeded the expectations of all involved with this project. Morgan Sindall also highlighted and rewarded Soundis for Health & safety performance throughout the contract.
Sponsored
AUTOMATIC SYSTEMS INSTALLS NEW FIRSTLANE AND ACCESSLANE INTO HOUSING ASSOCIATION PROJECT

AUTOMATIC SYSTEMS INSTALLS NEW FIRSTLANE AND ACCESSLANE INTO HOUSING ASSOCIATION PROJECT

Automatic Systems UK & Ireland

Automatic Systems was asked by Aspex UK Limited to work with them on a project they had won at the head office of Riverside Group.Riverside is a group of complementary businesses driven by a clear social purpose, with a charitable housing association at its core.Established over 90 years ago, they have grown to become a major provider of affordable housing, care and support services in England and Scotland, with almost 56,000 homes in management. Operating at scale and across 160 local authorities, their vision is to transform the lives of the 90,000+ people they house and revitalise the neighbourhoods in which they live.RiversideGroup approached Aspex as a result of Covid to help secure and control the access of their head quarter building.SOLUTIONWith the help of Automatic Systems Aspex came up with a solution that fulfilled their criteria. This included the installation of the newly launched Firstlane and AccessLane.WORK TIMEFRAMEHaving worked with Aspex on a number of previous projects Automatic Systems were the preferred supplier when the contract was won in December 2020. Works took a week to complete as allocated in February this year.FUTURE WORKAutomatic Systems looks forward to working with Aspex on future projects.
Sponsored
Geschwender Lockers at Sky Lagoon Iceland

Geschwender Lockers at Sky Lagoon Iceland

LSA Projects Ltd

Client: Pursuit CollectionInstaller: Geschwender GmbhProduct: Bespoke Cubicle Solution from GeschwenderOpened in 2021 Sky Lagoon in Kársnes Harbour, Kópavogur near Reykjavik in Iceland is a Geothermal Spa experience from luxury hospitality and attractions provider Pursuit. Pursuit Collection manage world-class attractions across the glove with facilities including wildlife safaris in National Parks and a growing collection of ‘FlyOver’ flight experiences in the United States, Canada, and Iceland.Sky Lagoon is a wellness retreat featuring their seven-step ritual experience including traditional sauna and steam room as well as the unique oceanfront geothermal infinity lagoon with unobstructed views of the ocean landscape.Geschwender supplied and installed a series of Bespoke Lockers and Changing Rooms to the spa. Sky Lagoon has both public and private changing facilities depending on the ritual package chosen each being carefully designed and installed by Geschwender in matching faux Oak laminates to reflect the natural ethos of the space. Lockers and private changing spaces are controlled using contactless electronic locking systems which are perfectly integrated into Geschwender fittings.
Sponsored
Adare Manor Padel Courts

Adare Manor Padel Courts

LSA Projects Ltd

Architect: Healy PartnersInstaller: John Paul ConstructionProduct: Gustafs Linear Ribs and Gustafs Panel SystemClose to 400m2 of Gustafs Linear Ribs and Gustafs Panel System in natural Walnut veneer were used to clad the walls and ceiling beams of the Padel Courts in the new leisure facilities at the Adare Manor in early 2020.The new Padel courts are a facility unique to the activity centre at Adare Manor. Padel is a hybrid sport between tennis and squash, traditionally played with 4 players and suitable for the whole family. Part of the larger expansion and restoration project the Padel Club also houses studio space for yoga as well as gym and swimming facilities, sauna and steam room.Gustafs Ribs were installed to the upper walls within the court area, 34mm deep ribs with 38mm gaps were used for 50% open area achieving class A for acoustic absorption, perfect for controlling sound levels in the sports hall.In addition to the ribs 171m2 of Gustafs Panel System was used to clad the steel ceiling beams in complimentary Walnut veneer. Specialist Gustafs capax profiles were used for their signature invisible fixing.
Sponsored
HANOVER STREET

HANOVER STREET

Metalline Architectural Fabrications

Sandwiched between a retail unit and some 2000 square feet of office space, the seven storey shuttered façade reflects the historical military tailors that used to occupy this part of London. Their tailoring techniques, forms of embroidery and bronze detailed shop fronts were an inspiration for the architects Squire and Partners, whose detailed design of the bronze panelled façade, included glimpses of deep red in the shutter reveals with 45mm diameter punched holes intended to replicate the stripes on a Sergeants uniform. Fabricated on a CNC turret punch press using high grade J57S UP aluminium, the exterior featured hook on Unity rainscreen panels finished in bronze anodised and aluminium infills in a red polyester powder coating. The balcony detail was enhanced with impressive folding shutter doors designed to offer, security, shading, ventilation and noise control from the streets below. The outer skin to the shutters was finished in bronze anodised to match the exterior panels. They also featured a regency gold anodised finish to the side plates and a red polyester powder coating to the interior screen that when folded added to the aesthetic design of the building.
Sponsored
InterContinental, The O2 – London – Rutland TS.9205 & TS.11204

InterContinental, The O2 – London – Rutland TS.9205 & TS.11204

Rutland

Project DetailProject: Intercontinental – O2 – HotelLocation: London, UKProduct: TS.9000 range of architectural closers Project DescriptionThe purpose built new InterContinental® London – The O2 features a dedicated riverside conference centre with separate entrance away from the main hotel lobby allowing for complete privatisation of bespoke events for exclusive use hire. The Luxury hotel with a globally recognised brand.With 453 luxury bedroom suites, 5 Restaurants and Bars, 20 meeting rooms, and a complete fitness centre it was important that the door controls not only work well but were guaranteed for many years. Both the TS 9205 and the TS 11204 Cam Action door closers were used extensively on the O2 Hotel as the importance of frictionless customer care and ease of operation was paramount.A Door Closer is a small element of building design, which makes an enormous difference to its operation.You can check out their web site here or visit at 1 Waterview Drive, Greenwich Peninsula, London, the O2, SE10 0TW.For all your Door Closer requirements e: sales@www.rutlanduk.co.uk or t: 01246 261 491
Sponsored
Bespoke Double Leaf Hatch - Kielder Observatory, England

Bespoke Double Leaf Hatch - Kielder Observatory, England

Surespan

IntroductionSurespan design and manufactured two sets of bespoke double leaf hatch doors for the Kielder Observatory located in England’s largest forest in Northumberland. Products suppliedWe supplied;Surespan designed and manufactured two sets of bespoke double leaf hatch doors for the roof and the front of the Observatory’s two rotating turrets – one to house a 20” Pulsar manual telescope and the other for a small Mead 14” telescope. Features:These hatches are electrically operated and have been specially designed to open in a specific sequence using remote control via 24v dc actuators.The projectAs part of the Kielder Art and Architecture program, Charles Barclay Architects designed Kielder Observatory for the Forestry Commission.The all-timber observatory was constructed from Douglas fir with larch cladding, the pier-like building has rotating turrets that house two permanent telescopes and an observation deck. The turrets can be rotated through 360 degrees.The observatory generates its energy using a wind turbine and photovoltaic panels and includes a composting toilet.The observatory has received 2009 awards from the RIBA and The Civic Trust and featured in the inaugural World Architecture Festival.
Sponsored
Surespan provide access to space - Kielder Observatory

Surespan provide access to space - Kielder Observatory

Surespan

Kielder Observatory Surespan designed and manufactured two sets of bespoke double leaf hatch doors for the Kielder Observatory located in England’s largest forest in Northumberland.  The ProjectAs part of the Kielder Art and Architecture program, Charles Barclay Architects designed Kielder Observatory for the Forestry Commission. The all-timber observatory was constructed from Douglas fir with larch cladding, the pier-like building has rotating turrets that house two permanent telescopes and an observation deck. The turrets can be rotated through 360 degrees.The observatory generates its energy using a wind turbine and photovoltaic panels and includes a composting toilet. The observatory has received 2009 awards from the RIBA and The Civic Trust and featured in the inaugural World Architecture Festival.  The ProductSurespan design and manufactured two sets of bespoke double leaf hatch doors for the roof and the front of the Observatory’s two rotating turrets – one to house a 20” Pulsar manual telescope and the other for a small Mead 14” telescope.  FeaturesThese hatches are electrically operated and have been specially designed to open in a specific sequence using remote control via 24v dc actuators.      
Sponsored
Canterbury's Art Museum & Library, The Beaney Institute, Canterbury

Canterbury's Art Museum & Library, The Beaney Institute, Canterbury

Tarmac

Background:Canterbury’s Art Museum and library, The Beaney Instituteis a Grade II Listed, Victorian building dating back to 1900.The Institute was granted £11.6m by the Heritage LotteryGrant to conserve, repair and restore the existing buildingplus create an extension that would double the size of theInstitute in order to provide better facilities to the museum,art gallery and library.The Solution:Limelite plaster from the Heritage range was used torestore and protect the internal walls throughoutthe Institute. Limelite Renovating Plaster was appliedto control and minimise dampness that can occur inolder properties. High Impact Finishing Plaster was thenapplied, creating a BBA approved plaster system allowingthe walls to breathe while protecting them from damage,maintaining a heritage-style appearance.The Outcome:The Limelite plaster system was the perfect solutionfor The Beaney Institute. Important pieces of art andmuseum artefacts are protected from condensationand salt transfer from the walls.This modern solution works sympathetically with thefabric of the building providing the aesthetic finishexpected of a building of its character whilst also beingdurable enough to withstand the high footfall of thevisiting public.
Sponsored
Co-Operative, Birtley

Co-Operative, Birtley

Berry Systems

Berry Systems supply and installed safety barriers and balustrading to protect loading bays, warehouse racking, pedestrian walkways and the plant.The new Co-Operative Composite Distribution Centre in Birtley covers 25,600 sq metres (276,000 sq ft) and supplies a vast range of products from 3,500 lines to 262 Co-Operative stores in the North of England.Activity in the centre is extremely busy with hundreds of vehicle movements daily facilitated by 500+ members of staff. We won the contract to supply and install all the safety barriers, balustrades, loading bay barriers and racking protectors inside the warehouse, as well as the vehicle perimeter barriers and ramp barriers externally.All the products, with the exception of the galvanised spring steel barriers, were painted in high visibility yellow. The spring steel barriers are designed to absorb  impacts from HGVs and forklift trucks while retaining their own integrity and ongoing effectiveness. The Co-Op were determined to ensure their new development was as environmentally friendly as possible. Waste oil helps provide heating and the lighting system is solar controlled to eliminate wastage. It ensures a variable level of interior lighting to automatically complement exterior levels.
Sponsored
Soundis Raised Floor System & Underfloor Heating Boards at Holland Park, Kensington, London

Soundis Raised Floor System & Underfloor Heating Boards at Holland Park, Kensington, London

Soundis

Holland Park Villas has set a new benchmark for quality in the super-prime central London residential development market. Unparalleled interior finishes combined with exceptional landscapes to show what a truly world-class team can deliver.On arrival, an impressive 30 year old Acer Palmatum tree takes centre stage. Granite paving, hornbeam trees, ornamental planting and a water wall further add to this sense of elegance and quality.This level of quality and attention to detail continues to areas not easily seen by the new tenants. Around 13,200 m2 of Soundis High density dry screed panels able to span between joists were installed by our installation partner UK Acoustic Systems as a raised access floor system. Chosen primarily for the ease of maintenance and future extensions of the underfloor network, the system is also an integral part of the underfloor heating system.Not only does this system demonstrate its practical heating properties, but the new apartments will also benefit from the pleasant acoustic characteristics provided from the floor system.
Sponsored
BAFTA Headquarters

BAFTA Headquarters

3v Architectural Hardware Ltd

Architect/Designer: BenedettiLocation: London Project OverviewFront of house refurbishment including developing bespoke signage and hardware to meet the client and architect’s requirements. ServiceFull hardware scheduling service. Bespoke signage & ironmongery. Project Details 3v worked alongside Benedetti architects to provide a full interior hardware package for the beautiful refurbishment of the British Academy of Film & Television Arts headquarters at 195 Piccadilly. This project included development of bespoke signage panels and hardware designed to complement the overall design aesthetic for the refurbishment of this Grade II listed building.The Expansion includes new top floor by raising & restoring two large Victorian rooflight structures & decorative plasterwork considered ‘lost’ for 40 years, from the original 1883 Royal Institute of Painters in Water Colours Gallery, built in ‘opposition’ to the Royal Academy across the road.Facilities include: doubled capacity, two cinema theatres, banqueting hall, multipurpose event and exhibition spaces, members’ bars/restaurant/club, roof terraces, judging/meeting rooms and offices.
Sponsored
Three Bridges Station

Three Bridges Station

A J Wells & Sons

AJ Wells designed, manufactured and installed just over 1000m2 of vitreous enamel wall cladding with a metal ceiling to modernise the public areas of Three Bridges Station and provide easy access to hidden electrical and telecommunication services.The metal soffit was designed and installed to act as both a water management system and create an aesthetically pleasing ceiling in the subway and platform access areas. The ceiling also incorporated inspection hatches so that the underside of the rail bridges could be inspected periodically by the relevant parties.AJ Wells carried out the installation work under extremely challenging conditions as Three Bridges station is open 24 hours a day throughout the year. As a result the majority of works could only be carried out during the evening and in the early hours of the morning when customer traffic flow was at a minimum.AJ Wells worked closely with the other trades on the project in order to ensure that all interfaces achieved their required purpose.KEY FEATURES:• Vitreous Enamel Cladding system• PM13 ceilingA.J WELLS SERVICES:• Design• Manufacture• Installation
Sponsored
Ridgeway Views, Mill Hill

Ridgeway Views, Mill Hill

Cellecta Ltd

Ridgeway Views is a collection of 490 flats set within 47 acres overlooking fields of Totteridge Valley. These energy-efficient homes offer village life coupled with city living. The development includes a gym, bar, parking, charging points, landscaped gardens, fitness trail, concierge, café, car club and play area. The National Institute for Medical Research was originally designed in 1934 by Maxwell Ayrton, with the buildings all being named after pioneering researchers from the institute (Dodson & Wolff House), with the main cruciform named as Ayrton House. This building has been recreated with a green copper-roofed centre, village pond, 3 storey workspace and restaurant.Cellecta’s HEXATHERM XPERi was specified by Julian de Metz of dMFK working with Hawkins\Brown & RMA Architects due to its closed cell structure that provides unrivalled resistance to water absorption and high compressive strength, making them ideal for external basement lining applications.Barratt Homes was supplied 112,500m² of Cellecta products to develop these flats in the Mill Hill conservation area.
Sponsored
Walls can purify the air with ESCREO Clean Air

Walls can purify the air with ESCREO Clean Air

ESCREO

For almost a decade, ESCREO whiteboard paints have been helping companies transform their workplaces, making them more creative, organised and open to collaboration. Creativity and innovation are embedded in the DNA of the company and its team from the very beginning. Thanks to this, they manage to find a solution to a problem that negatively affects our productivity and well-being, namely poor air quality. This is how ESCREO Clean Air was born - the latest addition to ESCREO's carbon neutral portfolio of functional paints. ESCREO Clean Air is an interior air purifying paint, which reduces air pollution by more than 90.1%. One of the magic components is an enhanced mineral which attracts and neutralises harmful pollutants, incl. VOCs, odours, air chemicals and CO2. The non-toxic environmentally friendly water-based formula is a great collaboration between modern technology and a clever "problem-solving" approach, through which ESCREO can help commercial building owners use hitherto passive areas such as walls to further purify the air indoors, making the premises more attractive to current and future users.
Sponsored
Horne Terrace

Horne Terrace

Forterra Building Products

The ChallengeA former industrial area along the south bank of the Union Canal in Merchiston, Edinburgh required transformation with the expected outcome of becoming one of the places to live in the city centre. A housing development was to provide a stylish addition to the already thriving growing community.The development consists of 11 stylish, one, two and three-bedroom apartments. The apartments feature high quality engineered flooring, bespoke kitchens, designer bathrooms and fitted wardrobes, and each has a terrace or balcony enjoying open views over the canal.It was important that the building materials used were sympathetic to the local sandstone buildings.The SolutionThe original intention had been to use extruded bricks for the project, however, it was decided instead to use Forterra’s buff, stock thrown, Belgravia Gault Blend from its Ecostock range. A total of 55,000 bricks were used in the construction of Horne Terrace.The BenefitsBelgravia Gault Blend complemented beautifully the sandstone aesthetic of the buildings in the locality, while at the same time delivering great technical specification of low water absorption and low embodied carbon.
Sponsored
Amgen, Cambridge

Amgen, Cambridge

Rapid Ramp Limited

REQUIREMENT: The planned site improvements included relocating the loading bay and installing compliant access steps to the post room.ADDITIONAL INFORMATION: CAD and technical drawings were designed in-house and based on site measurements taken.END RESULT:We installed the modular access steps within a few hours. Once the installation was complete, the system was instantly usable. This allowed the post room to open within a quick turnaround time.The access steps are fully compliant with documents M & K of the building regulations.FEATURES INCLUDED: Infill Handrail - this product prevents users from climbing or falling through gaps.Yellow Tread - this is a safety feature designed to help those with impaired vision identify the nose of each step. Additionally, it helps users distinguish any level changes.Trombone Ends - these are added to the ends to prevent clothes catching.Mesh Platform - the self-draining mesh allows water to pass through rather than collect on the surface.Continuous Handrail - this handrail system ensures users always have support to hold onto.
Sponsored
The Avenue

The Avenue

SELO

This exemplary development inserts 76 new homes into a conservation area in a historic market town and preserves a lime-tree avenue and a listed water tower, creating a beautiful setting for popular homes. In addition to large detached houses, it includes affordable family houses and smaller homes for the over-55 market. Saffron Walden is one of England's most beautiful market towns and the design of 'The Avenue' uses this existing context to brilliant effect.In this development Arrive and Enigma were used. Arriva stands out as an exceptionally versatile doorset featuring an outward-opening action. When positioned in front of the concealed flush side, the door gracefully swings open towards you, adding to its user-friendly and adaptable design.Enigma Pocket Doors are recognised space savers and allow the occupiers to use the full footprint of the rooms where they are installed. A conventional door will need a radius of around three feet to open which means around 10 square foot of space needs to be kept free for the door to function. This is all space that could be used for something else.
Sponsored
Themed playground in Athens, Greece

Themed playground in Athens, Greece

Redlynch Leisure Installations Ltd

Nestled in the natural beauty of northern Athens, “Adventure Farm Forest” is an inspiring outdoor playground that beckons families from all corners to come together and have fun!Themed playground in Athens, GreeceDesigned with a harmonious blend between nature's wonderland and creative play activities, it will surely excite imaginations while thrilling your little adventurers. Its centerpiece attraction – Polka - draws many children seeking thrills amidst elastic tiles covering its entire area. For younger kids, there are multiple interactive games such as Mole's Wood adventure or Little House for infants plus several benches for tired parents waiting nearby. A refreshing marble fountain supplies cool water under sunny Grecian skies topped off by a cozy municipal coffee shop only steps away when you need refueling after long hours of family bonding moments within this special place - truly a one-of-a-kind spot in Greece!The project was executed by our local channel partner Intec S.A. in 2012.

Showing 1801-1836 of 1905

Feedback