NBS Source
I'm a manufacturer

"low voltage distribution systems"

5,388 results found

Sort by:

Showing 1549-1584 of 1742

Sponsored
Profile 22 Flush Tilt and Turn windows have been used in the construction of flats for University of Derby students.

Profile 22 Flush Tilt and Turn windows have been used in the construction of flats for University of Derby students.

Epwin Window Systems

The developer of the new build flats was Jensco Holdings Ltd and the main contractor was Clegg Construction. The design, manufacture and installation of the windows on the project was undertaken by Profile 22 Approved Window Contractor Kingfisher Windows. As a member of the Approved Window Contractors Scheme, Kingfisher has demonstrated a wealth of experience in the management of large contract supply and installation and working proactively towards on-time and on-budget completion. The company’s track record was one of the factors that saw Kingfisher secure the window contract for Agard Court through competitive tender.
Sponsored
OFFICE – GRANITE EXCHANGE CO-WORKING SPACE – STAIR NOSING

OFFICE – GRANITE EXCHANGE CO-WORKING SPACE – STAIR NOSING

Quantum Flooring Solutions, a trading name of Quantum Profile Systems Ltd

Granite Exchange offers serviced office space to businesses and individuals. Companies can lease meeting rooms, private offices, or shared desk areas to operate from. The ultra-modern design and high specification facilities in Granite Exchange are ideal for businesses who want to offset high property rates while maintaining a sleek and professional outlook.
Sponsored
HOTEL & LEISURE - BRADLEY HALL GOLF CLUB - STAIR NOSINGS

HOTEL & LEISURE - BRADLEY HALL GOLF CLUB - STAIR NOSINGS

Quantum Flooring Solutions, a trading name of Quantum Profile Systems Ltd

Prestigious Bradley Hall Golf Club is located in over 60 acres of picturesque parkland in central Yorkshire. Golf was first played here in 1906 and considerable investment was spent converting the old house into an outstanding club house. Recently the golf club had a major building upgrade but still retained the quality that had been set up all those years ago. As part of this refurbishment the central entrance of the golf club required an impressive eye catching finish to their traditional style Victorian staircase with a unique large curved bottom step.
Sponsored
HOTEL AND LEISURE - SMUGGLERS COVE, BOURNEMOUTH - EXTERNAL STAIR NOSING

HOTEL AND LEISURE - SMUGGLERS COVE, BOURNEMOUTH - EXTERNAL STAIR NOSING

Quantum Flooring Solutions, a trading name of Quantum Profile Systems Ltd

Smugglers Cove Adventure Golf is a tourist attraction at Bournemouth Beach. The 18 hole course is part of Bournemouth’s famous seafront, which has over 7 million visitors per year. For safety purposes, it was necessary to fit Stair Nosings onto a fire exit staircase at the site.
Sponsored
White Rhino House Heating - Whipsnade Zoo

White Rhino House Heating - Whipsnade Zoo

Powrmatic Ltd

Zoo Animal Enclosure Heating SolutionIn partnership with HEVAC Services Ltd of Kings Langley, Powrmatic was approached to develop a heating solution for the White Rhino’s House at Whipsnade Zoo, which saw the installation of an overhead gas-fired (LPG) continuous radiant heating system, as the previous electric heating system inside their indoor habitat was not efficient enough and heat was escaping through the timber structureProject BackgroundThe White Rhino house at Whipsnade Zoo is the home to a herd (also known as a “crash”) of seven southern white rhinos, Sizzle being the only male – the six females are; Mikumi, Bertha, Tuli, Jaseera, Fahari, and Nandi. Sizzle and Tuli are the parents of the latest baby rhino Nandi born in August 2021.The heating inside their indoor habitat at Whipsnade was not efficient enough. Localised electric heaters were spread around the large space to create coverage, but the heat was escaping through the timber structure. It was decided to upgrade the structure by foam insulation to the internals of the asbestos roof and to provide a new continuous gas-fired overhead radiant heating system providing blanket heat coverage to the complete floor area of the house.  Project SolutionHEVAC Services Ltd of Kings Langley, Hertfordshire, who undertake servicing of HVAC equipment at Whipsnade Zoo on behalf of Pareto FM for the end client ZSL (Zoological Society of London), approached Powrmatic to develop a heating solution for the rhino’s house. The brief was to provide an overhead gas-fired (LPG) radiant heating system to blanket cover the complete floor area of the rhino house, but also design it so that it could be zone controlled, should one of the herd have a need to be in an area of a higher or lower temperature.The LPG propane tanks for the heating system needed to be sunk into the earth at the edge of the rhino house to avoid having to remove any trees, thus maintaining the conservation ethos of ZSL. For a structure such as the rhino house, being the size of a large sports hall, a Powrmatic SRP-PCV+ continuous gas-fired radiant tube system comprising; 4 x 73kW burners was the proposed solution, arranged in 4 temperature zones, with the new MC400/C controller and just the one flue discharge to atmosphere.Project ResultThe installation of the new PCV+ continuous overhead radiant heating system was skilfully undertaken by HEVAC Services Ltd, with the contract programme being driven by the daily habits of the rhino herd! Whether they wanted to be in their house or out on the field. Thus, the logistics of undertaking the heating installation were unique compared to working in a standard commercial/industrial environment.The White Rhinos now have a refurbished home and a heating system that delivers radiant heat in exactly the same way that we (and the rhinos) receive energy in the form of heat from the sun. Radiant heating systems efficiently radiate infrared radiation, which is the transfer of energy in waveform from a hot surface to a relatively cooler surface without heating the medium between. Thus, the rhinos can bask under the radiant heat, whether indoors or outside under the sun.The ZSL Whipsnade Zoo White Rhino Enclosure now benefits from a highly energy-efficient Powrmatic SRP-PCV+ system, listed on the Carbon Trust Energy Technology List (ETL), endorsing the Seasonal Space Heating Energy Efficiency of; 92.1%, and thus delivering low; energy usage, fuel bills and carbon emissions minimising their impact on the environment.
Sponsored
Bliss Blakeney | Sustainable North Norfolk new-build with a stunning view - Blakeney, Norfolk

Bliss Blakeney | Sustainable North Norfolk new-build with a stunning view - Blakeney, Norfolk

IDSystems

Architect: Waugh Thistleton Architects. Maximising the location and view in an Area of Outstanding Natural Beauty was key to this redevelopment and new-build on the North Norfolk coast. The site contained a 1950s houses and outbuildings that were out of keeping with the area, and so in its place the owners were granted permission to build a sustainable, low-energy new-build family home, clad in locally sourced timber and stone, and including IDSystems' theEDGE2.0 ultra-slim sliding doors to make the most of the stunning view over the salt marshes and estuary.
Sponsored
Lockerpod

Lockerpod

Cyclepods Ltd

Lockerpods bike locker offer safety and security for your bike. Manufactured from recyclable, low density polyethylene, the LDPE is UV treated and will not deteriorate or dis-colour over time. The door hasps are made of protected Stainless steel tabs, drilled to accept padlocks. Internally it is designed so that a ground anchor can be installed to accept a D Lock or chain for additional security. Lockerpods are weatherproof so your bike is kept clean and dry and there’s space to store your helmet and other bike kit safely with your bike.
Sponsored
Ehzer Bridge, Netherlands

Ehzer Bridge, Netherlands

Galvanizers Association

Originally erected quickly by Canadian troops in 1945, in support of the liberation of the Netherlands, the structure is still sound today. It represents a landmark erection for the Dutch galvanizing industry. Most importantly, on a recent visit to inspect the structure, it was noted that the steel itself had not been affected anywhere, despite a higher level of sulphurous pollution in earlier years. Today, the low sulphur dioxide content of the local atmosphere means that predictions on anticipated lifespan can be extended several times over what was initially foreseen upon installation.
Sponsored
Twyford HQ Taken to the Next Level with Gartec

Twyford HQ Taken to the Next Level with Gartec

Gartec Platform Lifts

The high traffic HQ for Interserve required a lift in an awkward stairwell space, to match the contemporary style of the building. A Gartec 7000 passenger platform lift was installed in just 3 days with no building works, with a fully glass shaft. Gartec worked around the glass stairwell, removing panels where required. The small footprint, low cost and simple maintenance made the lift ideal for the location. Sheena, the Office Manager, commented "the install team worked quickly and efficiently... now completed it looks like it has always been there".
Sponsored
Hardie® VL Plank - The transformative effect of interlock cladding

Hardie® VL Plank - The transformative effect of interlock cladding

James Hardie Building Products Ltd

A self-detached home in Brighton that once blended in with its' neighbours is now arguably the street's most striking resident. The homeowners were passionate about creating a contemporary two-toned look, using materials that are durable and low maintenance.The exterior walls are clad with Hardie® VL Plank fibre cement board, showcasing a mix of a vertical installation on the top half and horizontal installation on the bottom half. The clean, modern lines of the interlock V groove help to accentuate the building's shape, enhancing a sense of spaciousnous.
Sponsored
TeploTie used in First Zero-Carbon Retrofit

TeploTie used in First Zero-Carbon Retrofit

Leviat

Ancon TeploTie, the innovative low thermal conductivity Wall Tie, has been used in the UK’s first retrofit to achieve zero-carbon Level 6 of the Code for Sustainable Homes. TeploTie wall ties are ideal for retrofit projects as they can be resin-fixed into existing walls. The project involved the refurbishment of a semi-detached home, built in the 1840s with solid brick walls. The front elevation is internally insulated to preserve the original brickwork. The U-value of the walls is now 0.11W/mK2, 16 times better than before.
Sponsored
Naylor and the Olympic Legacy Part 3

Naylor and the Olympic Legacy Part 3

Naylor Concrete Products Ltd

The Olympic stadium had a capacity of 80,000 during the Olympics and Paralympics. It will be reduced in capacity to 25,000 for the future and will become West Ham United F.C's new permanent home. Designed by Populous Architects and contracted to McAlpine, it took over three years to build. Along with 10,700 tonnes of steel and thousands of cubic metres of low-carbondioxide concrete, there are many Naylor Concrete Hi-Spec, Fair Faced and Fire Resistant Lintels in the building, supplied through Civils and Lintels to Essex based Brickwork Contractor, Galostar.
Sponsored
Passivhaus certified loft ladder with fire protection

Passivhaus certified loft ladder with fire protection

Premier Loft Ladders Ltd

The Klimatec 160 is a high performance solution for passive and low carbon buildings. Not only does it offer superb thermal insulation and an airtight seal, but it also benefits from 30-minute fire protection. The Klimatec 160 is the latest product in the Premier Loft Ladders range to be certified by the Passivhaus Institut (PHI) for use in passive buildings. It offers very high thermal insulation, achieving a U-value of just 0.34 W/m2K. It also features a class 4 certified airtight seal. As such, it is extremely effective at keeping the warmth in the building.
Sponsored
Spitbank Fort Hotel

Spitbank Fort Hotel

The Solid Wood Flooring Company

Spitbank Fort was originally built in 1878 and was part of a group of forts designed to defend the mouth of the Solent. This project created challenging circumstances for wood flooring because the structure is metal and is over 130 years old. Surrounded by sea creating high, fluctuating humidity and the structure was round so most of the boards had to be re-manufactured to fit. There were height restrictions because there were numerous arches creating low points and all the services had to be laid on the existing substrate thus raising the finished floor level to accommodate them
Sponsored
Traditional Textures Blue Zinc Patina - Eden Student, Coventry

Traditional Textures Blue Zinc Patina - Eden Student, Coventry

Metal Solutions Limited

Situated in the heart of Coventry and clad in Traditional Textures precoated aluminium using an angled standing seam. The colour Blue Zinc Patina captures the colour, tone and textures of real pigmented zinc at a fraction of the cost. The range of pre-coated Aluminium come in a wide variety of surface finishes with a warranty of up to 20 years. Aluminium is lightweight, offers a flat surface aesthetic. Ease of handling and excellent formability even in low temperature conditions make it an installers favourite. Commissioned on this project as a Value Engineered solution
Sponsored
Reducing Noise in the First Welsh Passivhaus School

Reducing Noise in the First Welsh Passivhaus School

Troldtekt A/S

The Burry Port Community School is the first Passivhaus School in Walesa in a design collaboration between Carmarthenshire County Council and Architype architects. A major contribution to the pleasant environment was the choice of Troldtekt acoustic ceiling panels, especially in the classrooms and potentially noisy open spaces. Specified throughout the UK and Europe, the benefits of the 100% natural wood fibres panels include high sound absorption, high durability, natural breathability, low cost life cycle performance and sustainability documented by Cradle to Cradle certification at silver level.
Sponsored
Accoya selected for the Bradford Royal Infirmary

Accoya selected for the Bradford Royal Infirmary

Accoya

Accoya was chosen as the project required a striking facade which complimented the existing traditional stone Temple Bank House. Accoya was also selected due to the fact it is low maintenance & provides warmth & natural textures. 15 mm planks were chosen for the cladding to ensure minimum wastage in the manufacturing making it as cost effective as possible. The client was very impressed with how well the cladding cloaks, shields and invites, addressing the road facing elevations and drawing the occupants around the building to its entrance which sits in relief.
Sponsored
Accoya cladding on Pipers Corner School, High Wycombe

Accoya cladding on Pipers Corner School, High Wycombe

Accoya

Accoya was selected as the ideal material to clad the new Performing Arts Centre for Pipers Corner School, High Wycombe. Over 1200 m2 of Accoya cladding, soffits and trims were used throughout the project for phase 1 of the build. Designed by Nichols Brown Webber Architects and Landscape Planners, Accoya was chosen due to its Class 1 durability and low maintenance upkeep. Accoya was also used due to its sustainability credentials as the building has been targeted to achieve a BREEAM ‘very good’ rating.
Sponsored
Primark Bromley

Primark Bromley

INTRAsystems

Primark has become a household name providing amazing value for money for shoppers around the globe. According to an article about Primark in The Economist, “For many shoppers, Primark has an irresistible offer: amazing trendy clothes at amazingly low prices. Using the INTRAform to offer excellent performance and longevity in high traffic areas and the INTRAform DM to offer excellent moisture absorption with extra wide fibre inserts in high traffic areas we helped maintain safety and keep internal floor finishes looking great!
Sponsored
SuperLag Quietslab used at ExxonMobil Oil Refinery

SuperLag Quietslab used at ExxonMobil Oil Refinery

CMS Danskin Acoustics

CMS DANSKIN ACOUSTICS recommended a bespoke combination of industrial acoustic materials to ensure noise at work compliance at ExxonMobil Oil Refinery. The ChallengeFawley Oil Refinery is the largest oil refinery in the UK. When ExxonMobil found that the noise output from two industrial fans at the refinery exceeded the levels specified by The Control of Noise at Work Regulations, it consulted CMS Danskin Acoustics for advice. To ensure the most cost effective and high performing materials were specified, CMS Danskin Acoustics evaluated the noise reduction required on-site. Evaluation of the acoustic data revealed that noise levels in excess of 118dB at 125Hz were being emitted by the fans. Based on these criteria, the technical team at CMS Danskin Acoustics recommended the use of a combination of specialist materials from its industrial acoustic range. The SolutionTo control the low frequency-biased sound, CMS Danskin Acoustics recommended and supplied the SuperLag Quietslab Laminate with Acoustic Barrier Type WB10 combination for the fan casings and associated ductwork. Creating a multi-layered, high performance system, two layers of SuperLag Quietslab Laminate, totalling 250mm thickness, with a core of 5mm Acoustic Barrier Type WB10, were bonded onto the fan casings and ductwork. A direct coupled lagging system, SuperLag Quietslab Laminate comprises long-stranded mineral fibres thermo-set with resins for the absorption of sound at the surface, as well as a high mass inner acoustic barrier core to reduce the transmission of sound through the material. Manufactured from a weight-enhanced, high-density material, Acoustic Barrier Type WB10 provides a flexible and cost effective treatment for chemical and refinery applications. In total, 1,000m2 of the SuperLag Quietslab Laminate/Acoustic Barrier Type WB10 materials were installed around the fans and ductwork to achieve the high levels of sound reduction required.ResultsThe high performance bespoke system specified by CMS Danskin Acoustics, significantly reduced the noise generated by the fans. This enabled ExxonMobil to comply with The Control of Noise at Work Regulations by bringing noise levels under the 85dB compliance level.
Sponsored
Case Study - Proteus Cold Melt® & Proteus Pro-Living® - Cygnet Hospital

Case Study - Proteus Cold Melt® & Proteus Pro-Living® - Cygnet Hospital

Proteus Waterproofing

Cygnet Hospital, a new state of the art medical campus based in Maidstone required a waterproofing membrane for the newly installed concrete and metal decks. Proteus Waterproofing applied their Cold Melt® membrane, to provide a seamless leak protection to the inverted roof, that was then finished with Proteus Waterproofing’s Pro-Living® Green Roof. High Performance WaterproofingFirstly, the metal deck for the main roof was prepared and overlaid with Pro-Vapour Control SA, a self-adhesive bituminous waterproofing membrane that forms a barrier against vapour and gases, ready for the Proteus Pro-Therm PIR Insulation and Cold Melt® waterproofing installations.Proteus Pro-Therm PIR is stable, rot proof and will remain effective as an insulation system for the lifetime of the waterproofing covering, making it suitable for new builds. Cold Melt® waterproofing was then overlaid to the main roof and upstands. The exposed areas were covered with Cold Melt® UV Top Coat, making the waterproofing UV stable. Cold Melt® provides a seamless leak protection and is cold applied, therefore removing the risk of fire. The roof was completed with a Pro-Living® Green Roof providing ecological benefits for the building. Health and SafetyWhen working on occupied buildings, safety is of utmost importance. Proteus Waterproofing’s Cold Melt® system is cold applied and low odour, therefore meeting all necessary health and safety requirements. Cold Melt® is quick, simple and safe to apply allowing the Proteus Approved Contractor to successfully complete the project to a high standard within a short time frame, whilst ensuring the planned building works continued to run on schedule.Long Term PerformanceIncorporating recycled rubber crumb and organically grown products, Cold Melt® creates an elastomeric, seamless, cold applied waterproofing membrane. Cold Melt® system can include inverted roof insulation and, with or without insulation, can be designed as a paved, ballasted, green or brown roof. The membrane is made in the UK, does not become brittle with age and is BBA Certified to last the life of the structure.
Sponsored
The National Treatment Centre, Scotland, UK

The National Treatment Centre, Scotland, UK

Vebro Polymers

Client: NHS HighlandLocation: Inverness, Scotland, UKYear: 2023Project size: 400 m²Vebro systems: vebrobound StoneAn attractive, slip-resistant alternative to tarmac was required for the outdoor areas surrounding an elective care centre in the heart of Inverness Campus.NHS Highland, one of the fourteen regions of NHS Scotland, provides physical and mental health services across the Highland and Argyll and Bute Council areas, covering an area of 32,500 km² and serving a population of 320,000 people.NHS Highland has opened a new elective care facility at Inverness Campus, a hub for world-class research and development in the life-sciences sector.The National Treatment Centre, based at the Inverness Campus, comprises an ophthalmology outpatient department, ophthalmology and orthopaedic theatres, inpatient wards, an imaging and diagnostics suite, as well as collaborative spaces, educational facilities, and office spaces.Not only does the centre cater to local needs, but it also goes beyond by fostering innovation and research, enhancing the scope and impact of clinical services provided.Vebro Polymers has supplied vebrobound Stone, a fully permeable, SUDs compliant resin-bound aggregate system that is ideally suited for use in public-facing external applications like hospitals and healthcare facilities. The permeable, seamless polyurethane resin bound aggregate system is designed for installation directly onto tarmac or concrete on terraces and external areas of commercial and institutional venues and delivers a stylish and low maintenance alternative to loose gravel, block paving or concrete.Available in a range of attractive aggregate blends, vebrobound Stone can complement existing structures to deliver a stunning welcome to institutional facilities such as this.Hendersons, established over 40 years ago and based in Moray in Scotland, provide first class resin flooring installation throughout Scotland.The company, who also offer a range of other services including painting, decorating and industrial cleaning, deployed their dedicated resin flooring team to transform Glenturret Distillery. Hendersons prides itself on the continual training of existing staff and development of trainees across its business, ensuring it continues to offer an unsurpassable service.
Sponsored
The Shard Tower

The Shard Tower

FOAMGLAS®

FOAMGLAS® Tapered T4+ (Slab)Design Architects: Renzo Piano Building WorkshopExecutive Architects: Adamson Associates, LondonMain Contractor: Mace; Roofing Contractor AC PLCConstruction: 2012Application: Warm Roof - FOAMGLAS® Tapered T4+ (Slab )Finish: Bitumen membranesFOAMGLAS® provided the ultimate solution for the roof maintenance platform of The Shard at level 75.Its light-weight and high compressive strength enable regular maintenance to be carried out without risk of surface damage.At 310 m, Shard Tower is one of Western Europe’s tallest buildings; exposed to extremes of temperature & the revolutionary structure sways up to 50 cm in high winds.The building maintenance platform on level 75 islocated directly above the viewing galleries, and essentially forms the Shard’s roof. To shed water, the flat metal platform required an insulation with a tapered top surface.In this extremely exposed location, and with significantloads upon the platform, a truly reliable solution was needed. FOAMGLAS® insulation combines compressive strength, long-term insulation performance.Using their "in house" CAD systems, FOAMGLAS® designed a bespoke Tapered Insulation system. Taking full advantage of its low coefficient of expansion, and to eliminate thermal bridging, FOAMGLAS® and its membranes were adhesive bonded onto the metal structure. The unique ability of FOAMGLAS® to withstand high compressive loads ensures regular maintenance work can be safely carried out without damage to the insulation or the membranes.Adamson Architects commented on this project: "FOAMGLAS® has proved itself to be the ultimate solution for the difficult loadbearing areas of the Shard. Specifying cellular glass insulation ensured complete integrity and performance in key areas of the Shard Tower".
Sponsored
St Paul's Cathedral Restoration

St Paul's Cathedral Restoration

Tarmac

Project brief:A monumental restoration project for the iconic St Paul’s Cathedral spanning 15 years and costing £40 million. It was the first comprehensive restoration project that the Cathedral has gone through and this extensive cleaning, repair and renovation programme was one of the largest of its kind ever in the UK.The Project:It doesn’t get much more high profile than this when it comes to historic building restoration. As part of the London skyline for over 300 years, the requirement was for materials that perfectly balanced the strength and performance to do the job with the delicate nature of working with such a fragile and weathered structure. The sheer scale of the project also dictated the need for an extremely consistent product.Help from Tarmac Building Products – St. Pauls Grout Mix:Pozament, from Tarmac Building Products Ltd, boasts the heritage range of Limelite Grouts and Mortars specifically designed for such tasks. Yet in a project of such epic proportions and with the stakes so high our technicians instead produced an all new low strength blend of PFA, lime and special additives, that was capable of penetrating the fine voids and fissures in the Cathedral’s structure, whilst remaining sympathetic to the existing materials.The new grout, now named St. Paul’s Grout Mix, is easily mixed and in addition can be placed using gravity feed techniques, which are often used to ensure low pressures that are needed to avoid damage to delicate structures, such as in the case of St. Paul’s Cathedral.St. Paul’s Grout was designed to achieve a low strength of approximately 2.0 N/mm2 at 28 days, which was sufficient to strengthen and fill voids in the heartening of the masonry walls at St. Pauls Cathedral. The mix also contains a special plasticiser/wetting aid, so that when used at a water solids ratio of 0.4, a very fluid mix capable of penetrating fine voids and fissures is produced.Outcomes:The St. Paul’s Restoration project was finally finished in June 2011. To this day Tarmac continue to produce the St. Paul’s Grout when required and since then, it has been used successfully on many similar restoration projects including York City Wall, Winchester Cathedral and other English Heritage projects.
Sponsored
Derby Arena

Derby Arena

Prospec Ltd

The £27.5 million Arena heralds the most exciting and important changes to leisure facilities in Derby in the last 40 years. The new arena is primarily a Velodrome with space for sports and physical activity; however it also serves as a venue to host cultural events, exhibitions, product launches and conferences. Prospec Marathon Connect cubicles, Marathon laminate lockers, vanity units and benching are installed throughout all of the changing areas. A spectacular curved bank of low level lockers dominates the outfield circulation area, creating both a focal point and a huge volume of storage.
Sponsored
“Bad vibrations“ eliminated with VibroChecker

“Bad vibrations“ eliminated with VibroChecker

ACE Fabreeka UK

For pristine sound, a manufacturer of hi-fi amplifiers relies on air springs from ACE. This effectively eliminates disruptive ambient vibrations that enter the demonstration room from a neighbouring workshop and disturb the listening experience. The PLM-1 air springs, which have a low natural frequency of 3 Hz, are used as a bearing in the hi-fi rack for decoupling. ACE was able to prove the effectiveness measurably with the company's own app VibroChecker PRO. In the meantime, the manufacturer offers the high-end amplifiers optionally with the air springs and the app from ACE to the end customers.
Sponsored
Bideford College

Bideford College

dormakaba UK & Ireland Ltd

At the £55 million new-build Bideford College in Devon, careful selection of sustainable materials was of the utmost importance to help the building achieve a BREEAM rating of ‘Excellent’. When choosing solutions to control the numerous doors throughout the building, product lifecycle and longevity were important to help create a sustainable and low maintenance building. To achieve this, a comprehensive range of products from dormakaba was specified to install TS 93 cam action closers, as well as latches and floor springs. Incorporating a series of eco-friendly features the scheme received a Civic Building Award and a RIBA Award.
Sponsored
Fontwell Racecourse

Fontwell Racecourse

Fixfast Ltd

This visually stunning building, constructed for Northern Racing Ltd, provides twelve corporate hospitality boxes, hospitality lounges and a glass-fronted restaurant which provides an exceptional view of the track. The DrillFast Lacquered fasteners fit perfectly into this luxury environment, being colour matched precisely to the scheme and with a neat low profile finish. The use of genuine A2 stainless steel also makes this construction a real investment for the future of the racecourse and facilities."No problems, no complaints - always served us well"Sue Jenkins - Buyer at Southern Industrial Roofing Ltd
Sponsored
Granada Delivers Acoustic & Thermal Benefits at Local Hospital

Granada Delivers Acoustic & Thermal Benefits at Local Hospital

Granada Secondary Glazing

Granada Glazing has treated Hallamshire hospital’s stroke unit in Sheffield with a bespoke secondary glazing solution that provides acoustic, thermal and privacy benefits for patients accessing the city centre facility.Working to locally based JTP Architects’ specification, Granada Glazing designed, manufactured and installed horizontal sliding secondary glazing units, finished in white, in two, three and four-panel configurations to line up with the primary windows. Low-E glass was supplied to enhance thermal performance and achieve a 1.9W/m2K centre pane U-value.
Sponsored
Motorline Renault Plan Showroom Access with Gartec Lifts

Motorline Renault Plan Showroom Access with Gartec Lifts

Gartec Platform Lifts

Motorline Renault car showroom in Maidstone had an access issue during building, with customer showrooms and a meeting room spread between 2 floors. To open the showroom to everyone, a lift was required in the customer lounge. Gartec suggested an Aritco 7000 as a simple, low cost option which ticked all the boxes. Our team worked around their building schedule and the lift blends perfectly with the high end showroom. “Whilst we don’t use it very often, the lift is a perfect addition to make our entire showroom accessible to everyone” (Lin, Showroom Administrator)
Sponsored
Kingspan insulates beachfront Grand Design

Kingspan insulates beachfront Grand Design

Kingspan Insulation

A range of premium and high performance products from Kingspan Insulation has been installed on a stunning new beachfront home on the Isle of Wight, featured on Grand Designs. This includes Kingspan Kooltherm K8 Cavity Board, which was used to insulate the majority of the walls throughout the property, and Kingspan Kooltherm K7 Pitched Roof Board, which was were applied to the ground floor overhang. With thermal conductivities as low as 0.020 W/m.K, the products delivered the required thermal performance with a slim build-up, helping to maximise space within the rooms.
Sponsored
Herringbone Parquet for Maitland Park

Herringbone Parquet for Maitland Park

The Solid Wood Flooring Company

We have developed designs for two sites within Maitland Park Estate to provide 112 dwellings, a new Tenants’ and Residents’ (TRA) Hall and landscaping improvements to the central park. The Estate, built in the 1930s with successive waves of development until the 1980s. The Grafton Terrace site currently houses the existing TRA Hall and some dilapidated garages. Our scheme repairs the Victorian street frontage with a combination of four to six storey flats and four storey town houses. These will offer both social rented and low cost home ownership tenure.
Sponsored
Home elevator EcoVimec with masonry shaft

Home elevator EcoVimec with masonry shaft

Vimec SRL

The Home Lift installed in this private house is an EcoVimec Home lift, which has been chosen to increase comfort and add value to the property. The owner chose EcoVimec home lift because it’s electric and environmentally friendly (it has reduced energy consumption and doesn’t use hydraulic oil).The EcoVimec Home lift has been designed to fit within a masonry shaft, offering a compact and space-saving solution to access multiple floors of the house. The cabin has been designed to be as discreet as possible, with a low profile and modern appearance that complements the property perfectly.
Sponsored
Dundee Waterfront: Roma-3 fencing

Dundee Waterfront: Roma-3 fencing

Lang+Fulton

Three types of fencing were supplied for a prestigious waterfront location on the the River Tay. The design was developed jointly with the City of Dundee Chief Engineer, creating bespoke fencing which made use of modular panels wherever possible to meet the project budget. Roma-3 was used as infill panels to the keyside balustrade. The panel frames were customised with an extensions to carry a hardwood and stainless steel handrail. All the fencing was hot-dip galvanized and polyester powder coated to provide a durable, low maintenance finish to withstand the rigours of the coastal location.
Sponsored
Powder coating replaces stone

Powder coating replaces stone

Powdertech (Corby) Ltd

How powder coating light-weighted a new buildPowder coated aluminium would solve the issues of weight and expense and is also low maintenance. The designers were impressed with the Powdertech Landscape™ ‘Stone’ range which replicates the colour and random markings of different natural stones. ‘Kilkenny Stone’ was the shade chosen, a Qualicoat Class 2 powder with high performance corrosion protection, weather resistance and colour stability. Over 3500sq metres of aluminium cladding panels, window reveals, column casings and soffit panels were coated.
Sponsored
hardwood Timber Tiles with self-levelling pedestals on terrace

hardwood Timber Tiles with self-levelling pedestals on terrace

Wallbarn Ltd

Roof terrace on the third floor of a residential block. The customer wanted a floating deck but was keen to source decking that could be easily installed. They needed to deal with a slope and variation in the surface, as well as easy access to a drain. Wallbarn recommended their Cumuru hardwood timber tiles which being 500mm x 500mm x 30mm, which are highly portable and perfect for low threshold retro-fits. To deal with the variation in surfaces around the deck, we recommended laying the timber tiles onto our ‘Balance’ self-levelling pedestals. Total installation time: 3 hours

Showing 1549-1584 of 1742

Feedback