NBS Source
I'm a manufacturer

"gas air and steam"

2,272 results found

Sort by:

Showing 109-144 of 286

Sponsored
LivePicture living plants artistry brings fresh air and well-being to Bristol office

LivePicture living plants artistry brings fresh air and well-being to Bristol office

Mobilane

A contemporary office environment demands a number of important considerations; functionality, aesthetics, space, accessibility and wellbeing.  Ticking all of these boxes are the multiple LivePicture installations at the headquarters of Ultraleap, a technology company in Bristol. A framed piece of artwork with living plants, LivePicture has brought foliage, freshness and visual impact to the offices, thanks to installers Inleaf.
Sponsored
Bank of England Leisure Club

Bank of England Leisure Club

Sauna360 Ltd

Helo installed a steam room and sauna to extend the wet leisure facilities at the Roehampton Club. The project was to provide two attractive, contemporary styled thermal rooms in the existing space. We provided a clean, simple design in both sauna and steam rooms providing good capacity yet with a spacious feel. Delivered on time and on budget
Sponsored
Queen Elizabeth Hospital

Queen Elizabeth Hospital

Fixfast Ltd

On the roof at the famous Queen Elizabeth Hospital in Woolwich, London; is a very considerable amount of equipment for services such as air-conditioning, electricity, and gas. Specialist contractor Mid Kent Roofing were approached and asked by Vinci Facilities to provide a walkway solution to this need, and the DukMat walkway system was the only option. Supplying more than two kilometres of the walkway system, Fixfast worked closely with Mid Kent Roofing to provide the solution - easy to install and neatly packaged, the DukMat system is second to none."Deliveries were perfect and times adhered to which stopped any traffic flow problems with emergency services also using the same access points as the deliveries"Stave Cayford - Mid Kent Roofing
Sponsored
Asbestos roof coating project in Haverhill

Asbestos roof coating project in Haverhill

Liquasil Ltd

This was the first asbestos roof coating project undertaken with Liquasil products, back in 2013. The roof was heavily soiled and was cleaned using a DOFF steam cleaning machine, delivering 150°c steam to completely kill moss and lichen spores. The metal fixings were treated with Liquasil's corrosion primer and sealed with Non-Sag Sealer before the whole roof was coated with Asbestoseal, the only BBA Approved asbestos roof coating.
Sponsored
Acoustidor: St. Luke's Birmingham

Acoustidor: St. Luke's Birmingham

Strongdor Limited

When the last remaining building of Birmingham’s first gas works was bought by the Church of England, they were aware that, when newly constructed in 1818, its main function was the supply of gas to illuminate the dark streets. Now redeveloped into a vibrant church named St. Luke's, Gas Street it offers a different kind of light to the people of the city.In its new role, the former Gas Retort House now has a growing congregation of over 300, mainly comprising of young people and students, who are led by The Revd. Tim Hughes, his wife Rachel and a dynamic team who are committed to making positive impact on Broad Street and the wider area.
Sponsored
Novotel Hotel - Tower Bridge

Novotel Hotel - Tower Bridge

Sauna360 Ltd

Helo UK is pleased to announce the completion of another professional Sauna & Steam installation for Novotel Hotels. In 2010 Helo created a new design for Novotel sauna & steam rooms, and has since installed new rooms in several Novotel Hotels in the UK. The latest installation is at Novotel Tower Bridge, where Helo removed the hotel's old rooms and built two new rooms which reflect Novotel's quality image in terms of both looks and function.
Sponsored
Asbestoseal asbestos roof coating project Warwickshire

Asbestoseal asbestos roof coating project Warwickshire

Liquasil Ltd

Specified because of it's unique BBA Approval and Latent Defects Insurance Guarantee, Asbestoseal was applied to this asbestos cement roof in Warwickshire. The roof was first steam cleaned using 150°c steam, removing all moss and lichen. Metal fixings were treated with Liquasil's corrosion primer and then sealed using Non-Sag Sealer. The entire roof surface was then coated with Asbestoseal 20 to provide long term protection and add considerably to the life of the roof. The metal gutters were lined with Liquasil's seamless silicone gutter lining system
Sponsored
Architectural Cast Iron Ventilation Gratings and Grilles in any RAL colour

Architectural Cast Iron Ventilation Gratings and Grilles in any RAL colour

Cast Iron Air Brick Company

We have over 250 different cast iron grilles available on our website in either bare metal or painted black. But don't let that put you off specifying cast iron because our website features products that are ready to be dispatched. Actually we can supply them in any colour you or your client requires. If it has a RAL number then we can do it. There's a charge and a week or so extra to bare in mind but if you're looking to make a statement or just to blend then get in touch...
Sponsored
Facebook Data Centre Ireland

Facebook Data Centre Ireland

Juta UK Ltd

JUTA UK is leading the way with the new Facebook Data Centre in Ireland. As the first geosynthetic on site, JUTA Gas Protection geomembranes are being utilised to protect the building, and the future workers from Ground Gas emissions such as Methane, Carbon Dioxide and Radon. Following many months of working together in partnership with Baridek Services Ltd (Installer), JUTA UK Gas Protection membranes were selected to provide the foundation for future proofing the development. The Facebook project is split over two phases, Phase one will deliver two buildings with a gross floor area of 50,800 square meters.
Sponsored
Bushey Grove Health Suite

Bushey Grove Health Suite

Sauna360 Ltd

The existing Bushey Grove health suite was a stark, clinical looking area with gloomy sauna and steam plus a difficult to maintain whirlpool spa with all the plant two floors below. TyloHelo's design concept was to open up the space with glass frontage and dividing walls between thermal rooms and create more comfortable relaxation areas. The design was contemporary with large format tiles in warm, natural colours. The thermal suite comprised a Finnish Salt sauna, Salt inhalation steam room, Herbal sauna, Bucket shower, Feature shower, Ice feature and three heated benches.
Sponsored
Furzefield Leisure Centre

Furzefield Leisure Centre

Sauna360 Ltd

The existing health suite at Furzefield Leisure Centre was a dated, clinical design with enclosed sauna, steam and a delapidated whirlpool spa. TyloHelo created a design to open up the space with glass frontages, heated relax benches with contemporary style large format tiles in warm, natural shades. The new health suite has a spacious, stylish feel befitting a luxury hotel, increased bather capacity, lower running costs and easier maintenance. The project comprised a Vitality sauna, Salt sauna, Salt steam, ice feature, shower and heated bench. Completed on program and to the budget.
Sponsored
Bunsen Burner Consumption

Bunsen Burner Consumption

Arboles UK Ltd

Need to calculate the gas supply pipework?
Sponsored
A Guide to Laboratory Taps

A Guide to Laboratory Taps

Arboles UK Ltd

An introduction to laboratory gas and water taps.
Sponsored
Floor Heating Pipes - Libraries, Palaces, Conservatory, Church, Orangery and Public Buildings

Floor Heating Pipes - Libraries, Palaces, Conservatory, Church, Orangery and Public Buildings

Cast Iron Air Brick Company

The Ecclesiastical cast iron floor grille isn't used exclusively in churches, cathedrals or abbeys. We've supplied these beautiful Scottish made gratings to a number of religious buildings across the country that's for sure but their main use is in "ordinary" period properties and listed buildings. Buildings with large heating pipes sunk into the floor with suspended walkways. Places like Stansted and Rotherfield Hall or National Trust, Mount Stewart Property in County Down and Halls in Melton Mowbray and Stoke on Trent. To make a real feature or for a sympathetic restoration why not take a look ...
Sponsored
Community Centre Heating - Harrow Club

Community Centre Heating - Harrow Club

Powrmatic Ltd

Project BackgroundThe Harrow Club in London W10 has been creating positive futures for marginalised young people in West London since it was formed in 1883 as The Harrow Mission Church. Through general youth clubs and specialist interventions, they aim to empower young people to complete their education, avoid anti-social behaviour and become positive contributors to society. They work with up to 500 young people each week across 6 clubs, helping them to recognise their full potential.The Harrow Club with high ceilings, period windows, and exposed beams has a large sports hall which is a preserved reminder of the Club’s heritage, plus a smaller dance studio, both of which were heated by an old continuous gas-fired radiant tube system that had ‘life-expired’.Project SolutionBuilding Services Engineering Consultants, SS and A of Great Portland Street were commissioned by the Harrow Club to explore options for the replacement of the old radiant heating system. They called on the expertise of Powrmatic to review possibilities and offer a solution.The installation of the new systems was expertly undertaken by Industrial Commercial Environments Ltd of East Sussex. Radiant heating is the most suitable form of heat for both sports halls and dance studios as the lower air temperature for the same comfort level is approx. 5ºC lower than with a warm air system, thus producing a beneficial environment for the activities. A new Powrmatic SRP-PCV+ continuous gas-fired radiant tube system was the proposed solution. This enabled the installation to follow the route of the existing thus minimising costs and disruption during the works.Project ResultThe new Powrmatic SRP-PCV+ continuous radiant heating systems in the two halls have provided the Harrow Club with energy-efficient heating for the next two to three decades. These systems deliver the comfortable environment crucial for the well-being of the young people that the club nurtures in their quest to improve their futures.The Harrow Club now benefits from the energy-efficient Powrmatic SRP-PCV+ systems, listed on the Carbon Trust Energy Technology List (ETL), reducing their fuel bills, carbon emissions and thus their impact on the environment.
Sponsored
We're Celebrating 25 Years Supplying The Laboratory Industry

We're Celebrating 25 Years Supplying The Laboratory Industry

Arboles UK Ltd

25 years!!They same time flies when you're having fun!This year sees us hit a 25 year milestone! We've grown and developed a range of quality laboratory gas and water taps that suit all customers regardless whether they're from the local comprehensive looking for the simple yet effective drop lever gas tap or the professional scientist needing a reverse osmosis.
Sponsored
Writable walls in education design at school

Writable walls in education design at school

ESCREO

Svetlina Educational Complex uses whiteboard paint to redesign a STEAM creative area for the next generation of masterminds as writable walls ensure higher collaboration, creativity and productivity. The latter are an innovation that perfectly matches the innovative spirit of the Primary School of this Educational Complex. ESCREO whiteboard paint has been applied as part of the refurbishment of the school to integrate the STEAM programme into its holistic education system which is under the auspices of UNESCO. Lusio Architects who took lead of the project knew that Svetlina and ESCREO are united by the idea of being innovators in their fields. You can read more about this project in the full interview with the Primary School where they also share what values are at the heart of this partnership in this project.
Sponsored
Grade II Listed Kitchen Extract

Grade II Listed Kitchen Extract

Kompozit'All UK

application area: commercial kitchen extractuse type: school kitchen air extractionproject scope: line brick duct with four linersadded value: 25-year guarantee on liner, no need to fit and maintain chimney fansBackgroundVentilFlex-25 engineers were to supply and install a bespoke kitchen canopy solution for a grade 2 listed school building in Hampshire. The bespoke canopy could not be fixed to the walls or the ceiling, which was 14 meters high.The 20-metre ventilation shaft had metal supporting crossbars. This made it impossible for any rigid extraction ducting system to be installed without affecting the integrity of the structure. The client opted for a kitchen extraction system with a different approach – VentilFlex-25 RKV – a composite liner solution supplied in a flat and soft state. The bespoke-made liners are useful for ducts where access is difficult or if the duct has bends and offsets.The main challenge of this installation was to insert and inflate 4 VentilFlex-25 RKV liners simultaneously. This way the liners would fill the available duct space evenly and act as a single large liner.Statement of workThe steaming took a few hours, during which the high temperature started a chemical reaction in the composite structure which solidified the resin and gave the liners their final physical characteristics – tensile strength, high corrosion-resistance, high heat-resistance and an air-tight finish. The new VentilFlex-25 RKV liners provide an outlet for the gases coming from 3 combi ovens, 2 range ovens a fryer and a grill.
Sponsored
Ironmonger Row Baths

Ironmonger Row Baths

Sauna360 Ltd

The original Ironmonger Row Baths site was built in the 1930s with swimming pool and traditional style bathing house of hot rooms and cold plunge in the basement. These facilities were completely upgraded in 2012 with saunas and steam rooms added.  In January 2022, the basement spa was destroyed by a fire. A complete restoration of the area was required of the builder’s work, fabric and services and Sauna360 UK was honoured to be commissioned to design and install all wellness areas. In January 2024 the "bathing house" re-opened to a wonderful reception.There has been a transformation of the area and a feeling of space, tranquillity and relaxation. Huge full height tiles adorn the walls throughout. Longitudinal floor tiles subtly take the eye to the glass fronted Salt sauna at one end and the backlit image and relax zone the other.  On arriving from the changing area the guest has a choice of contemporary facilities of saunas, aroma steam rooms, feature showers and ice to the left or traditional hot rooms, cold plunge and massage slabs to the right with large relaxation areas in the centre.  In the contemporary zone there are two large saunas: The Juniper Sauna This sauna  is operated at 75-85C with automatic infusion for a medium humidity. To the front a Juniper wall provides a beautiful detail with its own natural spicy aroma.  Behind the benches, and hidden within the wall, are Infra red panels. These allow the room to be operated in separate sessions at a lower temperature 40-45C with the benefits of IR bathing.The Salt Sauna The Salt Sauna is hot (85-95C) and dry like a traditional Finnish sauna and provides the ideal environment for the large salt wall. The impressive sauna has the height for a third bench in the hottest zone. The glass front allows the backlit salt wall and attractive finishes to be viewed from outside and the feeling of space appreciated from within. The Aroma Steam Room This opulent room has copious amounts of steam infused with seasonally changing essence. The stunning, large format, dark marble tiles are paired with subtle underbench lighting to create a relaxing ambience. Inclined backrests are used for ultimate comfort.Salt Inhalation Steam Room Contrasting beautifully with Aroma Steam Room, this thermal experience infuses the area with a mint or lemon essence to complement the automated salt spray within the steam environment for enhanced inhalation benefits.Completing the area are two Feature showers with warm and cool programs using essence plus a Cool room with ice feature and icy mint spray.Infrared Benching In the central area there is a long Recliner bench in ergonomic ceramics with gentle Infra red heating plus an expansive relaxation zone.Hot Rooms In the traditional zone there are the Hot Rooms. A series of interlinked rooms in large ceramics with increasing temperature as you get further in for the ultimate thermal experience.Drench Bucket & Plunge Pool Outside the hot rooms one will find a drench bucket cleansing shower and a large Plunge pool. The plunge pool now includes a unique heat recovery system which uses the heat removed from the plunge pool water to provide heat to the existing learner pool.Massage Slabs & Footrests The traditional zone also has twin heated Massage slabs for wet massage treatments by the spa therapists. The area is completed by additional heated benching with heated foot rests, below the backlit feature wall.
Sponsored
The Langley Hotel

The Langley Hotel

Sauna360 Ltd

Sauna360 have completed their installation of extensive thermal features at the prestigious 5 star Langley Hotel in Iver, Buckinghamshire. This comprised of two beautiful Hammam, Steam rooms, Saunas, Heated Loungers, feature showers and ice features.
Sponsored
21 Wapping Lane, London

21 Wapping Lane, London

Sauna360 Ltd

Helo are proud to announce the completion of the Spa at no.21 Wapping Lane in the heart of London’s Tower Hamlet district. The Ballymore Group called upon the expertise of Helo to install a high end Sauna, Steam room and Vitality Pool.
Sponsored
Maximum ambient vibration isolation for sensitive glass measuring tables through automatic air spring elements

Maximum ambient vibration isolation for sensitive glass measuring tables through automatic air spring elements

ACE Fabreeka UK

Measurements made on a glass measuring table led to unusable results because the isolator used was unable to cope with the lateral stiffness of the products used. Only the low-frequency pneumatic isolators PAL 21 from ACE with automatic level control could provide a remedy. A special feature of these membrane pneumatic isolators lies in the level control valve, which has, by virtue of its construction, an above-average longevity. Relatively large acceleration forces can lead to horizontal movements and it is particularly in such situations that the robustness and durability of the isolation system make a significant contribution.
Sponsored
DONG Energy: High Risk of Fall During Transfer from Vessel to Transition Piece

DONG Energy: High Risk of Fall During Transfer from Vessel to Transition Piece

MSA Safety (Latchways) – Fall Protection

DONG Energy (Danish Oil Natural Gas), a leading energy group in Northern Europe, procures, produces, distributes, and trades in energy and related products. DONG Energy invests heavily in European offshore wind power and oil and gas exploration and production, with commitments in the multi-billions, helping to develop secure, low carbon energy supplies. Regular maintenance is essential to keep any offshore wind farm working efficiently and productively. Harsh environments are particularly challenging and as a result, safety systems must be of the highest calibre.
Sponsored
Netherwood Hotel, Cumbria

Netherwood Hotel, Cumbria

Sauna360 Ltd

Helo was commissioned to provide a new health suite for Netherwood Hotel in Cumbria including Herbal Sauna, Aroma Steam Room, Salt Inhalation, Feature Shower and Ice Feature. The conversion of the old tiled pool to three wellness tubs of varying temperatures completed the project.
Sponsored
CapaCITY Two Tier Racks

CapaCITY Two Tier Racks

Cyclepods Ltd

The CapaCITY two tier is a highly convenient gas assist two-level bicycle parking system. The lifting system ensures that a bicycle can be parked on the top level effortlessly. Galvanised steel upper arm Upper arm on casters for easy glide action. Upper arm reaches to the floor for ease of loading bike. European manufacture for quality assurance. Welded and bolted construction. Security bolts give additional security. Gas assist action: Dampers stop upper arm from falling down uncontrolled. Lifts loaded upper arm with little effort.
Sponsored
DRU Fires and Grate Expectations selected to supply fires for prestigious  home counties estate.

DRU Fires and Grate Expectations selected to supply fires for prestigious home counties estate.

DRU Fires

DRU gas fires and a Spartherm wood fire were specified by Ethos Construction and DRU dealer Grate Expectations for Harford Manor, a country house in Holyport, Windsor. They selected the fires for their ‘A’ energy ratings. This included the DRU PowerVent extended flue system for flexibility of location. In addition, the gas fires can be operated using the DRU Eco Wave app for tablets and smartphones. Ethos project manager Niten Mistry said: ‘The fires were selected for their impressive performance and ease of installation. They also contribute to the high quality of the property.’ www.harfordmanor.com, www.grateexpectations.com,
Sponsored
London Aquatics Centre made Watertight with GCP Preprufe® Waterproofing System

London Aquatics Centre made Watertight with GCP Preprufe® Waterproofing System

GCP Applied Technologies

The London Olympics Aquatics Centre has been given a watertight seal with the application of Preprufe® waterproofing membrane from GCP Applied Technologies. GCP was able to meet the architects’ full requirements combining the Preprufe® comprehensive waterproofing and gas protection with a range of fully compatible pre-applied and post-applied membrane systems. The specification of the Preprufe® waterproofing system has ensured that after the Olympic games, the facility will continue to benefit from long term waterproofing and gas protection performance befitting of the Olympics Legacy. Find out more.
Sponsored
Bright UV stable floor coating installed at Duxford Air Museum to show off aviation exhibits at their very best

Bright UV stable floor coating installed at Duxford Air Museum to show off aviation exhibits at their very best

Sherwin-Williams

Sherwin-Williams polyurethane floor coating Resutile provided a bright solution for this large museum area full of famous aircraft which have been part of aviation history. Lots of natural light came into this area so any coating chosen had to be UV stable to avoid discolouration over time which would spoil the aesthetic appearance. Resutile has great chemical reistance and is fully light resistant. The product has been used in Aircraft hangars around the world for twenty five years to create and enhance bright modern environments.
Sponsored
Novotel Hotel - London Excel

Novotel Hotel - London Excel

Sauna360 Ltd

Helo completed the installation of a new sauna and steam room at the Novotel Excel as part of an ongoing improvement program to their wet leisure facilities. The rooms are contemporary styled, utilising subtle underbench and underseat lighting in both rooms. Wide glass doors allow easy, inclusive access for all.
Sponsored
Dormy House Hotel - The House Spa

Dormy House Hotel - The House Spa

Sauna360 Ltd

Sauna360 are pleased to announce the completion of the House Spa at the prestigious Dormy House development designed by award winning Spa designers Sparcstudio. With its rural charm accompanied by lashings of Luxury, this Spa experience offers Juniper Sauna, Steam Room, Rasul, Lavender Room and Ice feature.
Sponsored
Marriot Hotel & Country Club

Marriot Hotel & Country Club

Sauna360 Ltd

Helo UK is pleased to announce the completion of a professional Wellness facility for Marriott Hotel, Lingfield, Surrey. The Marriott Hotel and Country Club, situated in the stunning grounds of Lingfield Park,commissioned Helo to design, build and install a state of the art spa to include sauna, steam, rhassoul and treatment rooms.
Sponsored
Kensington High Street, London

Kensington High Street, London

Sauna360 Ltd

Helo’s design brief was to create two luxurious wellness rooms to overlook the swimming pool in this prestigious central London development. Both the Aroma steam and the Herb Sauna have a full glass frontage with central wide access doors. Finishes throughout are in keeping with the opulence and expectations for this high end development.
Sponsored
Shah Deniz

Shah Deniz

Lionweld Kennedy Group

Lionweld Kennedy designed, fabricated and supplied steel grating, handrails, ladders and gates for the 'Shah Deniz' stage 2 offshore facility, owned by Tekfen Construction. Supplying 'safegrid', 'safetreads' and 'saferails' which were fabricated to fit the specifications of the client provided them with an efficient and compliant flooring solution. Our flooring will add a further 16 billion cubic meters per year (bcma) of gas production to the approximately 9 bcma produced by Shah Deniz Stage 1.Shah Deniz Stage 2, will help increase European energy security by bringing Caspian gas resources to markets in Europe for the very first time.
Sponsored
Worsnop House

Worsnop House

Bosch Thermotechnology Ltd

The project involves major refurbishment and alterations to a Sheltered Housing scheme including completely new M&E installations. We were looking for new systems to improve heating, reduce maintenance and running costs, and ultimately provide comfort for all residents in a smart new environment. We opted for a communal heating system to avoid individual boilers and gas supplies in flats through installing a cascade of GB162 / C7000WP boilers and a Greenstar Heat Interface Unit (HIU) within each property. To supplement the systems, we also specified Greenskies solar thermal panels and a Gas Absorption Heat Pump to enhance the overall efficiency
Sponsored
Easylift Premium Two Tier

Easylift Premium Two Tier

Cyclepods Ltd

The Easylift Premium is a highly convenient gas assist two-level bicycle parking system. The lifting system ensures that a bicycle can be parked on the top level effortlessly. - Easy to use: a. Light aluminium upper arm b. Upper arm on casters for easy glide action c. Upper arm reaches to the floor for ease of loading bike - European manufacture for quality assurance - Welded and bolted construction. Security bolts give additional security - Gas assist action: i. Dampers stop upper arm from falling down uncontrolled ii. Lifts loaded upper arm with little effort
Sponsored
Pronteau Propure Commissioned for Eco Water Tower Project

Pronteau Propure Commissioned for Eco Water Tower Project

Abode (Part of Norcros Group (Holdings) Ltd)

Abode, award-winning designer and distributor of market leading kitchen taps, sinks, bathroom taps & showering solutions bring eco-luxe convenience to a unique water tower restoration project in Castle Acre, Norfolk with Pronteau: a high-specification range of steaming hot water taps with exclusive safety features.

Showing 109-144 of 286

Feedback