NBS Source
I'm a manufacturer

"insulation"

7,065 results found

Sort by:

Showing 937-945 of 945

Sponsored
St. Mary's Catholic Voluntary Primary School - Education

St. Mary's Catholic Voluntary Primary School - Education

Innovare Offsite Limited

Project:St Mary's Catholic Voluntary Academy Client: Department for Education Contractor: Tilbury Douglas Architect:Hawkins Brown Architects Value:£12m Location: Derby, Derbyshire. Completion Date: June 2023 Innovare duration onsite 12 Weeks 2GIFA: 2300 m² Framework: This is a DfE pathfinder project – the UKs first Biophilic school. Sustainability: Net Zero Carbon in operation Innovaré System:Psi-FASTConstruction is complete on the innovative eco-building for St Mary’s Catholic Voluntary Academy in Derby, following a fire that destroyed the previous school. This biophilic school is part of a pilot scheme for the Department for Education. Biophilic design increases occupant connectivity to nature, promoting physical and mental health, and the building is net zero carbon in operation. Innovaré Offsite supported the design, engineering, manufacture, and installation of the sustainable superstructure. The timber constructed school uses Innovaré’s Psi-FAST panels, designed for fire safety, thermal, and acoustic insulation, and loadbearing capabilities. Psi-FAST panels have an A1-rated non-combustible board and class 0 surface spread of flame rating, offering 60 minutes of standalone fire resistance. The single-storey school includes a primary school and nursery with pavilions arranged along a central canopy. Each age group has a shared learning space, and the entrance building features a hall and communal areas. The buildings are naturally ventilated with solar panels and heated via air source heat pumps. Green roofs enhance biodiversity and local ecology
Sponsored
King Solomon School

King Solomon School

Axter Ltd

OverviewThis project saw the refurbishment of King Solomon International Business School, which was changing hands from office use to education. The building now features specialist science rooms, resistant materials workshop, drama studio, outdoor sports hall, music rehearsal rooms, food technology, ICT rooms and language rooms.ChallengesDue to the change of building use, a full survey of the roof covering was required. Excessive moisture was found within the existing asphalt covering, water ingress was present and the internal top floor of the building was not suitable to be used as a teaching space. The roof area presented many challenges with complex detailing to existing balustrade posts, live mobile telephone masts and large quantities of plant / M&E installed.SolutionsAs a starting point, the roof was completely stripped due to the high level of water ingress. The existing asphalt covering was removed ready for installation of a new Excel RBM system, with Hytherm ADH PIR thermal insulation. Much of the existing M&E was found to be redundant and could safely be removed from the roof area.The complex detailing to the balustrades and fire risk areas was simplified using Starcoat PMMA cold applied liquid waterproofing, allowing for a long term, robust and financially viable solution. High level roof areas were also detailed with ease using Starcoat PMMA. Successful installation provided a peace of mind roof covering for the next 25 years, supported by Axter’s Platinum Guarantee.Systems in useExcel®Starcoat® PMMA
Sponsored
Bournville Village

Bournville Village

TRC Windows

TRC Windows have been appointed by Bournville Village Trust for the first phase of a six year planned works program to supply and install bespoke sash and casement windows to 46 properties in the Bournville Village estate.The rented dwellings in Bournville Village consist of bungalows, maisonettes, flats and family accommodation.The estate also features a variety of special needs housing particularly for the elderly and people with learning disabilities.Two areas of the estate have been declared conservation areas and there are a number of buildings of architectural interest and historical importance.Window profile & thermal performanceTo meet conservation requirements, window profiles will match the style, configuration and visual appearance of the existing windows (including glazing bars, horn detail, beading, etc).For each building, they will be be supplied and manufactured in preservative-treated softwood.The thermal performance of all windows and doors will meet the requirements of the Building Regulation Part L1B and have a minimum Window Energy rating of 1.4u-value.Measurement and surveyThe process will involve the removal of existing windows and doors where necessary and installation of the new timber frames and glazing.All equipment, scaffolding and materials employed to fix and seal the windows and doors inside and outside the dwelling will be in accordance with the BS 8213-4 specification for surveying and installation.In instances where the structural box frame is to remain, allowances will be made for minor repairs and redecoration.Narrow cavity glazing (A rated)Narrow cavity insulated glazing units (IGU) will be installed so as not to compromise energy-efficiency and authenticity.These units will meet the requirements of BS EN 1279 and be manufactured by a Kitemark or similar accredited manufacturer.
Sponsored
A STAGE FIT FOR TOMORROW’S FA STARS

A STAGE FIT FOR TOMORROW’S FA STARS

Zaun Limited

The FA wanted only the best for its highest-profile ‘social pitch’ at St George’s Park, its new centre of excellence in Staffordshire, opened in October 2012 by the Duke and Duchess of Cambridge – FA President Prince William wife, Kate.The fence at Pitch No 2, the David Beckham Pitch, needed to take sponsorship and branding and keep rattle and noise to a minimum. The FA also wanted to fit in with the landscaping of the National Forest in which the centre sits.The SolutionThe system had to be in keeping with the environment – even down to surfacing the pitch surrounding the same golden colour as the car parks. In addition, it needed to limit noise impact on neighbours and cause minimal disruption to pitch use during installation as the fencing went in after the pitch.They chose a quality system that will last on this high-usage pitch at heights of 2m and 5m with EPDM inserts to insulate the fence panels from the posts to reduce noise during impacts to 72dB compared with the 93dB of wooden panels.Zaun designed its Super Rebound to take branding and sponsorship signs and fencing to remain robust even in brisk winds when the graphics can threaten to act as a ‘sail’.The installation, which is around a pitch that is primarily used by the public rather than for England training, carriesZaun’s industry-leading 12-year product guarantee.Zaun worked closely with East Staffs Borough Council on planning consent and with the St George’s Park groundsmen and facilities team to complete a tight programme of works on the £105m complex on budget and in time for the royal opening.
Sponsored
Longleat Forest Centre Parcs

SFS helped to develop a compliant specification for a subtropical swimming paradise and restaurant facilities

Longleat Forest Centre Parcs SFS helped to develop a compliant specification for a subtropical swimming paradise and restaurant facilities

SFS Group Fastening Technology Ltd

The Centre Parcs model for all UK locations focuses around a central area housing a subtropical swimming paradise and restaurant facilities. Keeping the central area open without impacting guests was key to this project. A tall order, achieved through meticulous and effective planning. Originally completed in 1994, the existing membrane and glazed rainscreen systems were in need of refurbishment. The brief was to remove the existing glazing and coverings, deck support frame re-modelling and install new insulated deck with simple large expanse blown ETFE roof-lights whilst maintaining unrestricted, safe guest access.Center Parcs and the consultant team were rigorous in their specification of fasteners and method of containing the chlorinated environment of the pool areas. SFS provided all fasteners for deck attachment. Specifically for the pool area this included the TDA-S, TDB-S and TDB, R5 (1.4547) grade stainless steel fasteners for the attachment of the deck and also RV6604-6-4W aluminium rivets for the deck stitching requirements.SFS helped to come up with suitable fastening systems that included R5 grade stainless (EN 1.4547) self tappers to fix the aluminium deck. These were manufactured by SFS, and supplied with certificates of conformity at the request of the client. Super austenitic R5 grade stainless steel fasteners were especially developed for chlorine rich swimming pool environments and are now specified by pool specialists. This is to offset the risk of chlorine induced stress corrosion cracking, a particular type of corrosion that can occur in such environments.
Sponsored
Altro Whiterock White - Capability Barns

Altro Whiterock White - Capability Barns

Altro

Altro kitchen system provides a perfect fitAltro Whiterock White, Altro Stronghold 30“We chose Altro Whiterock because it provides an easy to maintain, hygienic surface that is ideal for kitchens and have up to date fire certification.”Ben Rodgers,Cladpro LtdIssueBannold are one of the UKs largest independent family run suppliers of natural hard landscaping materials. Based in Cambridgeshire, Bannold wanted to refurbish 1920 railway carriages to create a tea room for customers.The Carriage Tea Room had a dated wooden substrate that needed to be replaced with a modern hygienic clinical finish for the kitchen facilities. The walls were not a square flat surface and needed a flexible product that could be fitted into the space. Floors and walls had to be easy to clean and maintain and fit into an environment without a straight line.ApproachCladpro are leading Altro Whiterock Premier installers specialising in hygienic wall finishes, floor coverings and ceilings. They suggested the Altro kitchen solution for the kitchen carriage. All the walls were thermoformed and wrapped to fit the unusual shape of the carriage.SolutionAltro Stronghold 30 keeps staff safe, with Altro’s highest slip-resistant rating of (PTV 55, R12) even with common kitchen contaminants such as grease, oil and flour. With 3mm comfort underfoot and 10dB impact sound insulation, it makes busy and noisy kitchen environments more comfortable for staff. Combined with Altro Whiterock it creates a full sealed solution to maintain the highest levels of safety and hygiene.
Sponsored
Horgan's Quay, Ireland - Pyroguard Infinity

Horgan's Quay, Ireland - Pyroguard Infinity

Pyroguard UK Ltd

The ChallengeNo. 1 Horgan’s Quay is one of the development’s three office buildings, with the upper floors of the new modern structure cantilevered over the site’s original Goods Shed. The lobby area features a large glazed partition on the first floor, helping to create an open, light space, as well as sympathetically blending the old restored structure with the new.KCC Group, a door and glazing contractor, were appointed to deliver the EI30 SWS Screen works on the project. Site Contracts Manager, Ger McNamee, said: “In order to ensure the safety of those within the building, 30-minute fire protection was required for the reception area, providing a fire barrier between the lobby and the first floor. Once we had the fire safety glass specification from the architect, O’Mahony Pike Architects, it was up to our team at KCC Group to source a supplier – this is when our relationship with Pyroguard began.”The SolutionTo ensure that the desired aesthetic was achieved, while also meeting building safety regulations, Pyroguard Infinity T-EI30/24-2 SWS fire safety glass was chosen by KCC Group and installed in the glazed partition, within a Jansen steel profile system.Pyroguard Infinity is a range of fire safety glass certified for butt-joint applications. With no vertical frame profiles required, it’s the ideal solution for providing visually appealing seamless partitions. Manufactured to EI classification, Pyroguard Infinity provides the highest level of integrity and heat insulation, protecting against flames, smoke and heat.
Sponsored
Lansdowne Place Development, Dublin

Lansdowne Place Development, Dublin

PARTEL

Project DescriptionLansdowne Place is a luxury residential development located in Ballsbridge, Dublin 4. When fully complete, Lansdowne Place will have a total of 215 apartments, including 24 penthouses. Exceptional features include superb location, extraordinary design, exceptionally high-quality materials, and expert craftsmanship.The Challenge in WorkPartel was engaged and involved with the project to plan and develop the airtightness strategy for apartments. We also consulted on the flat roof build-ups and were able to provide a safe and effective solution by using a high-performance system, to manage airtightness and vapour.The project team installed our integrated and trusted product system including the smart VARA PLUS membrane, IZOPERM PLUS membrane, CONEXO, CONIZO, and CONLEX Butyl airtight tapes.The requirements for airtightness and insulation changed during the project which led to challenges for vapour control. We carried out hygrothermal analysis using WUFI to determine the suitability of the penthouse flat roofs using VARA PLUS. The nature of the structure in some areas with structural beams, columns, and connections made the installation more challenging for installers – Castle Group – but through a patient and detailed installation, results are in the zone of 1 ach @ 50pa.Designed to be compatible with all conventional building systems, the smart vapour control membrane VARA PLUS, together with IZOPERM PLUS membrane and Partel tapes ensures maximum protection against humidity, improves the energy efficiency of the buildings and the comfort of their occupants.
Sponsored
Quiet, solid wood flooring for student accommodation

Quiet, solid wood flooring for student accommodation

Junckers Ltd

Cottrell + Vermeulen Architecture has designed new, bright and airy postgraduate accommodation for Churchill College, Cambridge with interiors featuring Junckers’ solid maple flooring. Cottrell + Vermeulen won a competition to design the new buildings, 16 years after the studio completed a housing scheme on a neighbouring site. The 35 new units of accommodation comprise five studio flats and 30 en suite rooms with spacious communal areas on each floor, spread across three buildings. The design builds on the original architectural scheme, designed as an extension to CVA’s previous work on the site. The architects sought to recreate the warmth and brightness of the original college rooms from the 1960s and found Junckers maple flooring a good match. The choice of two-strip boards, where two staves of wood make up one floorboard, was also a reference to the narrow boards used in the original rooms. The naturally pale tone of the maple floor is matched by joinery in birch faced plywood to form a comfortable and welcoming space, ready for students to move into at the start of the new academic year. The floor was installed by VA Hutchison Flooring. Quiet floors in multiple occupancy buildings An important consideration for student accommodation is how impact sound travels through floors from one dwelling into another. Building regulations set out minimum standards for impact and airborne sound through floors which apply to residential buildings and buildings converted to new uses, including hotels and care homes. The floor finish will usually act in combination with other elements of the building to achieve the target levels of sound insulation. The design of the subfloor and ceiling beneath play an important role, as does the way the floor finish may need to be isolated from the walls that surround it, but there is no question that the right acoustic floor will control the transmission of impact sound. Junckers has a range of acoustics systems available which comply with building regulations. The newly updated New Era acoustic system is a height adjustable system for use on structural concrete slabs, block and beam floors and almost any other type of sound, dry load-bearing base. The New Era system uses acoustic cradles with 10mm thick recycled rubber pads, factory-fitted to the underside. The cradles are height adjustable using purpose-made packers, supporting laminated timber battens. 50mm thick mineral wool insulation is placed between the battens and Junckers 20.5mm or 22mm thick solid wood floorboards are fixed to the battens to complete the installation. The use of 36mm thick battens achieves an impact sound reduction of 27dB; and a 48mm thick batten achieves an impact sound reduction of 28dB, thus complying with building regulations. For Junckers 14mm thick solid wood flooring installed with Junckers’ Clip System, an impact sound reduction of 19dB can be achieved with Junckers’ 5mm thick CA2 Acoustic Underlay, loose laid with the floorboards installed on top as a floating layer, no fixings required. Junckers’ floor system specifications are available on NBS Plus and draft NBS clauses are available on request. Junckers also provides BIM Objects for all systems. Junckers solid hardwood floor systems are guaranteed for 25 years when installed by a Junckers Approved Contractor. Junckers Approved Maintenance Contractors offer a care scheme where the client’s floor is periodically inspected and maintained so as to keep floor in good condition and to  maximise its lifespan.

Showing 937-945 of 945

Feedback