NBS Source
I'm a manufacturer

"egger pro flooring"

2,933 results found

Sort by:

Showing 757-765 of 765

Sponsored
OFFICE – GRANITE EXCHANGE CO-WORKING SPACE – STAIR NOSING

OFFICE – GRANITE EXCHANGE CO-WORKING SPACE – STAIR NOSING

Quantum Flooring Solutions, a trading name of Quantum Profile Systems Ltd

Granite Exchange offers serviced office space to businesses and individuals. Companies can lease meeting rooms, private offices, or shared desk areas to operate from. The ultra-modern design and high specification facilities in Granite Exchange are ideal for businesses who want to offset high property rates while maintaining a sleek and professional outlook.
Sponsored
HOTEL & LEISURE - BRADLEY HALL GOLF CLUB - STAIR NOSINGS

HOTEL & LEISURE - BRADLEY HALL GOLF CLUB - STAIR NOSINGS

Quantum Flooring Solutions, a trading name of Quantum Profile Systems Ltd

Prestigious Bradley Hall Golf Club is located in over 60 acres of picturesque parkland in central Yorkshire. Golf was first played here in 1906 and considerable investment was spent converting the old house into an outstanding club house. Recently the golf club had a major building upgrade but still retained the quality that had been set up all those years ago. As part of this refurbishment the central entrance of the golf club required an impressive eye catching finish to their traditional style Victorian staircase with a unique large curved bottom step.
Sponsored
Protecting Christian Dior’s Flagship London Store

Protecting Christian Dior’s Flagship London Store

Newton Waterproofing Systems

Internally and externally waterproofing the below-ground developments of the extended Christian Dior store on New Bond Street, with Newton 403 HydroBond, Newton 107F and Newton System 500.New Bond Street has been one of the most prestigious retail streets in London since it’s 18th Century beginnings, and in 2011 was named as the second most expensive retail street in Europe after the Champs-Élysées in Paris. The Christian Dior name has also been synonymous with haute couture and luxury retail since its own inception in 1947.This project required both the internal and external waterproofing of the extended basement area of Christian Dior’s flagship London store. A significant extension of the existing floor space on this stretch of famous London road, the extensive basement area will be used as stock rooms, changing rooms, and staff and shop floor areas. It was therefore a crucial requirement to achieve a completely dry internal space.The property line construction between two existing buildings meant that there was a requirement for waterproofing both new and existing structural elements, including pile caps, underpinning, a new reinforced concrete slab, existing foundations, and also existing vaulted areas at the front of the building which extend below New Bond Street.Because a completely dry internal environment was required, (defined as Grade 3 by the BS 8102:2009 Code of Practice for The Protection of Below Ground Structures From Water From The Ground) the proposal put forward by design specialists G05, in consultation with Newton, was a combination of Type A and Type C waterproofing systems. Due to the fact that the build was between the flank walls of two existing structures, the Type A system comprised of a combination of the hydrophilic, fully-bonded Newton 403 Hydrobond membrane pre-applied below the new concrete slab, and was linked to the cementitious, flexible Newton 107F membrane, which was applied to the internal faces of the walls and the prepared internal areas of the vaults.Following the application of the Type A system, a Newton System 500 Cavity Drain membrane system (Type C) was applied to the internal wall and floor areas by Newton Specialist Basement Contractor Advanced Preservations Ltd, who also guaranteed the work. The system included perimeter drainage using Newton Basedrain, and two Newton Titan-Pro pumping systems. The under-pavement vaults were lined internally with the Newton 500 system.Not only was continuity achieved with the waterproofing systems across numerous below-ground building mediums and scenarios, but the waterproofing system also conformed to the recommendations of BS 8102:2009 for combined waterproofing protection, where even the slightest form of water ingress is unacceptable.The internal areas were also successful in achieving an environmental Grade 3 with regard to their degree of water tightness, meaning that they will be suitably fit for purpose and use by both Christian Dior’s staff and customers.
Sponsored
EDUCATION - LOGAN HALL UNIVERSITY COLLEGE LONDON, LONDON, STAIR NOSINGS

EDUCATION - LOGAN HALL UNIVERSITY COLLEGE LONDON, LONDON, STAIR NOSINGS

Quantum Flooring Solutions, a trading name of Quantum Profile Systems Ltd

Logan Hall is an auditorium at the University College London. It is a venue based in the famous 20 Bedford Way building, and is used for various events such as award ceremonies, film screenings and conferences.
Sponsored
Case Study - Proteus Hot Melt® and Proteus Cold Melt® - Nashmills

Case Study - Proteus Hot Melt® and Proteus Cold Melt® - Nashmills

Proteus Waterproofing

On the Grand Union Canal in Hemel Hempstead, the Nash Mills Wharf housing development features a range of stylish new build 1-4 bedroom houses and luxury apartments offering high quality waterside living in this Hertfordshire town.With a waterproofing system required to protect the concrete podium above the ground floor car park, a selection of hot and cold applied products were provided by Proteus Waterproofing that met the requirements of the client Linden Homes. The licensed roofing contractor worked with Proteus Waterproofing on a dual system specification which included the fast and economical Proteus Hot-Melt waterproofing system, and for the intricate detailing around upstands and to avoid hot works around the plastic soil and vent pipes, the Cold Melt® waterproofing system was the ideal solution.Fast, hassle-free applicationWith the podium deck covering 3000m2, the Proteus Hot Melt® system was the optimum waterproofing solution for a robust, cost effective, seamless and fast application. This solution worked exceptionally well for the Licensed Contractor and is compatible with the fast applied Cold Melt® solution which was used for high detail items including plastic soil and vent pipes and upstands. There was also the added challenge of wet brickwork and an exacting building program to keep to. To overcome this problem, Proteus isolated the wet substrate with Pro-DPM Primer (Damp Proof Primer) which can be applied to green concrete 3 days old and then followed immediately by the Proteus waterproofing system. This enabled the Cold Melt® to be installed on to the vertical elevations will no loss of time.Quality controlProteus Waterproofing worked in close partnership with its Licensed Contractor to successfully deliver the project to a very high standard within the required timeframe.Long term performanceIncorporating recycled rubber-crumb and other organically grown products, Cold Melt® creates an elastomeric, seamless, cold applied membrane and can outlast the lifetime of the substrate on which it is installed.
Sponsored
Waterproofing an Air Traffic Control Tower, Scotland

Waterproofing an Air Traffic Control Tower, Scotland

Newton Waterproofing Systems

Heavy rainfall on the Orkney Islands meant that the basement room of Kirkwall Air Traffic Control Tower suffered from frequent flooding, with water levels reaching 1.2m at their highest point. Newton Waterproofing and Specialist Contractor Wise Basement Systems were called in to remove the existing water and then waterproof the structure to protect it from future flooding, all in just one week.Kirkwall airport is located on the main island of the Orkneys, 10-miles off the North coast of Scotland. Presented with a logistically challenging location and a tight project timescale of just 1 week, Newton had no hesitation in recommending the expertise of Wise Basement Systems as the specialist contractor to Building Surveyor Pick Everard.Getting involved at the very start of the project, Wise were immediately able to design, advise on and install a system to remedy the 2 inches of water in the existing basement of the Air Traffic Control tower.Cavity Drain Waterproofing, or ‘Type C’ waterproofing as it is defined by BS 8102:2009 is often the most effective means of achieving a completely dry ‘Grade 3’ environment in an existing structure below ground. It was therefore no surprise that Wise Basement Systems designed a Newton CDM System for this existing basement area.To begin, Wise installed 120m2 of Newton 508 on the walls and 80m2 of the recycled Newton 520 eco to the floor, above the closed-cell Fibran XPS 500-C insulation. The drainage membranes were supplemented with a perimeter channel of Newton Basedrain, directed to a Titan-Pro sump chamber containing two NP400 Pumps to remove the water.Finally, to ensure that the system will continue to work in all eventualities, even in a complete power outage, Wise installed a backup system with dual Northstar batteries and a Victron Power Inverter.Even with a project located 10 miles from the mainland, and 1 week to waterproof a basement with only a 600mm wide access hatch, Wise Basement Systems delivered a completely dry space for the client that was also compliant with BS 8102:2009 and backed by their guarantee.
Sponsored
Waterproofing a 116-Bed Care Home, London

Waterproofing a 116-Bed Care Home, London

Newton Waterproofing Systems

Hammerson House will be a world-class, 116-bed residential centre for the elderly Jewish Community in Hampstead. Newton Specialist Contractor Cast Contracting Ltd (CCL) were approached during the planning stages to develop a comprehensive waterproofing solution for the extensive basement.CCL recommended the installation of a Newton CDM water management system to comprehensively waterproof the extensive basement. First, they employed the 8mm Newton 508 membrane to the concrete retaining walls of the basement. The 50mm thick Fibran XPS 500-C insulation was then installed beneath more 508 membrane across the entire concrete slab. Additionally, Basedrain drainage channel was installed around the perimeter, including inspection ports to provide a fully maintainable system.This entire system is served by a series of complete sump and pump systems, each consisting of primary and backup NP400 pumps, high water level alarms, and battery backup systems. These are all controlled by Newton’s advanced Control Panel-Pro to ensure a failsafe system, even during a power outage.Finally, Newton’s 107F cementitious waterproof membrane was spray applied to the concrete upstands of the lightwells and lift pits in order to complete the continuous watertight solution.
Sponsored
Hays Galleria Laminate Z Style Lockers Project

Hays Galleria Laminate Z Style Lockers Project

Helmsman

Helmsman had the luxury to manufacture, deliver and install around 180 Z lockers and several benches to commuter washrooms and changing rooms. The client requested wet area Z type lockers, which we provided in heavy-duty aluminium and stainless steel powder-coated bodies and solid grade laminate Z doors. The client choice of colour for the body was the standard ‘ice’ and, the laminate door was Grey Maple (619) from our Abet Laminati collection. Z locker sizes were bespoke to comply with the space. The sizes are 1800H x 378W x 450D + 1mm rivets and 1800H x 298W x 450D + 2mm rivets and end panels to match the lockers. The majority of the lockers are with standard cam locks, and 44 of the Z lockers are with a keyless operation of the Ojmar OCS Pro locks for security and sleek design. These locks have a digital keypad with an integrated handle. In these uncertain times, these locks are hygienic and easy to upkeep. Bespoke bench seating with shoe tray underneath, manufactured from hardwood slats, complement the lockers. The client specifically requested to have these made from hardwood which matches the laminate locker colour.
Sponsored
US Homegrown Craft Beer Sensation, Brooklyn Brewery, Chooses Fresh Floor Finish for Williamsburg Plant Upgrades?

US Homegrown Craft Beer Sensation, Brooklyn Brewery, Chooses Fresh Floor Finish for Williamsburg Plant Upgrades?

Flowcrete – a brand of Tremco CPG UK Ltd

Bucking the trend for dairy brick, Brooklyn Brewery opted for close to 8,000 sq. ft. of urethane cement for major upgrade works to its manufacturing facility located at the former matzo plant where it has operated since 1996.

Showing 757-765 of 765

Feedback