NBS Source
I'm a manufacturer

"radiation shielding fire bricks"

6,694 results found

Sort by:

Showing 721-756 of 944

Sponsored
Aungier Street Student Accommodation

Aungier Street Student Accommodation

Profab Access Ltd

Profab Access rises to the top at Aungier Street Student AccommodationSituated in the heart of Dublin just a short walk or cycle from Trinity College, Royal College of Surgeons Ireland and University College Dublin, Scape Aungier Street is a new state-of-the-art student accommodation complex.Offering a diverse range of high quality accommodation options, from en suite rooms in shared apartments, through to large and premium studios, the latest Scape development features communal study spaces, large open plan kitchens and gym areas to offer students all of the amenities they require.As part of the construction process, which was managed by John Paul Construction, 226 Profab Access 4000 Series Riser Doors were specified for installation by AE Doors throughout every part of the building, including the communal areas and individual bedrooms.The 4000 Series Riser Doors offer the highest standards of fire safety, supplied with comprehensive CERTIFIRE bi-directional certification from third party accredited testing, Warrington Fire.This means the riser doors are fire tested from both sides to two hours, providing the specifiers, contractors and ultimately the students residing within the building with confidence the critical fire integrity products offer the highest standard and most up to date evidence for fire safety performance.The 4000 Series is the only riser door in the UK to be independently bi-directionally fire tested and certified by an accredited third party to ensure legal compliance.The steel riser doors feature a slimline construction that doesn’t compromise on quality or functionality, offering aesthetics without compromise. Providing clean and concealed access to the riser shafts, the unobtrusive doors were specified with a central key cylinder lock and hinges on one side.This significantly streamlined the installation process for the team at AE Doors and reduced the risk of damage to the doors upon installation, particularly in the student bedrooms and bathrooms where access was restricted.Pat Woods, Technical Sales at AE Doors, said: “Given the nature of this development we knew the quality and durability of the riser doors was paramount to ensure their longevity and continued efficiency.“We have supplied and installed Profab Access’ riser doors for over two years and continue to be extremely impressed with the quality of construction, so we knew the 4000 Series would be the ideal choice for this project.“The products are extremely easy to install and as they are manufactured in the UK, they are available with impressive lead times. This meant we could ensure the development of the project was kept on track, ready for its opening this autumn.”In the event of a fire, the doors will maintain their frame and integrity for up to two hours, preventing the spread of fire throughout the property for this period of time.The riser doors are 35dB acoustic rated, smoke sealed and airtight to Part L, whilst also featuring intumescent smoke seals that enable occupants to safely exit the building. By specifying the CERTIFIRE bi-directionally fire tested 4000 Series Riser Doors, the development is actively future proofed as the comprehensive testing certification provides a complete and transparent audit trail of due diligence that evidences the products are not only fit for purpose, but meet the duty of care required to ensure legal compliance.Marcus Parnham, Commercial Director at Profab Access, said: “Scape provides students across Ireland, the UK and Australia with contemporary accommodation that offers the highest standards in quality, safety and functionality.“The specification of our 4000 Series bi-directionally fire tested riser doors throughout all areas of the new Aungier Street development is a further reflection of this commitment, ensuring the building features the highest levels of riser shaft fire protection currently available on the Irish and UK markets.” The 4000 Series Riser Doors were supplied with a high quality powder-coated matt surface, which were finished on-site in a range of bold colours to reflect the contemporary interior design scheme.Profab Access’ diverse portfolio of riser doors and access panels are supported by a wide range of BIM Level 2 and CAD files to aid the specification process and streamline the initial design stages.Manufactured at Profab Access’ Atherstone headquarters in accordance with ISO 9001, the 4000 Series Riser Doors can be specified and installed in a range of configurations to meet each project’s specific measurements and requirements.For further information on Profab Access and its range of access panels, riser doors and steel doors, call +44(0)1827 719051 or visit https://www.profabaccess.com.
Sponsored
Rural Farm Shop - An accessible and convenient entrance for a shop that sells local food to local people

Rural Farm Shop - An accessible and convenient entrance for a shop that sells local food to local people

FAAC Entrance Solutions UK

Located in Hampshire and partly funded by the European Agricultural Fund for Rural Development which invests in rural areas, this farm shop is packed with delicious, locally grown food and household essentials.Project Year: 2020Product: ASSA ABLOY SL510 Slim Eco 4 panel bi-parting sliding door.  See our sliding door rangeProject Background:  The client was working with a tight schedule to have an existing brick building fitted with a sliding door and pocket screens to be part of a new country store. Looking to enhance accessibility whilst giving a modern look to the traditional farm shop, they got in touch with our local expert who visited the site to assess all requirements.Solution: We proposed our SL510 Slim Eco beam-mounted system with a bi-parting operator and 22mm clear insulated laminated glazed units. Combined activation/threshold presence detection sensors and glazed pocket screens to comply with EN16005, making it a safe and convenient entrance that complimented the existing brick structure. Working together with the client and our operations team, we also managed to expedite the order to work to meet the much awaited opening day.For more information or assistance with any project, please contact enquiries.esuk@faactechnologies.com where we can provide expert guidance and detailed documentation.
Sponsored
Hamad International Airport

Hamad International Airport

Profab Access Ltd

VISION 8000 Non fire rated doors were installed at Hamad International Airport.These were a bespoke specification to feature in the stone tiled walls.
Sponsored
The Peninsula Hotel

The Peninsula Hotel

Rapid Access Ltd

The Peninsula London, 1 Grosvenor Pl, London SW1X 7HJ The Peninsula London offers 190 exquisitely styled guest rooms and suites by Architect and Designer of Interiors, Peter Marino. Superbly situated alongside Hyde Park Corner and Wellington Arch, The Peninsula London occupies one of the city's most prestigious addresses.The Peninsula Hotel London, renowned for its luxurious hospitality, sets high standards for safety, comfort, and tranquility. Ensuring secure utility access and acoustic comfort is essential for its distinguished clientele. This case study highlights the successful collaboration between The Peninsula Hotel London and Rapid Access Ltd, a leading Manufacturer of 2-hour fire rated Riser Doors with a 40DB acoustic rating.Challenges:1. Safety and Compliance: The Peninsula Hotel London demanded access solutions that met stringent fire safety and compliance standards, ensuring the safety of guests and staff.2. Acoustic Comfort: Maintaining a tranquil and peaceful atmosphere within the hotel's opulent surroundings was a top priority.3. Efficient Utility Access: The project required access solutions that facilitated efficient maintenance of utility systems without compromising safety or tranquility.Solution:Rapid Access Ltd, recognized for their expertise in access solutions, was chosen to address the specific needs of The Peninsula Hotel London. The solution included the supply and installation of 2-hour fire rated Riser Doors with a 40DB acoustic rating, designed to meet the following key criteria:1. 2-Hour Fire Rated Riser Doors: Rapid Access Ltd provided riser doors that met stringent fire safety standards, ensuring the safety of guests and staff.2. 40DB Acoustic Rating: The riser doors were equipped with an acoustic rating of 40DB to maintain a peaceful and quiet environment within the hotel.3. Efficiency and Security: The access solutions allowed for swift and secure access to utility systems, enhancing operational efficiency while upholding safety and tranquility.Implementation:The supply and installation of 2-hour fire rated Riser Doors with a 40DB acoustic rating by Rapid Access Ltd were carried out with meticulous attention to safety and acoustic comfort. The installation process was executed to meet the highest standards set by The Peninsula Hotel London.Conclusion:The collaboration between The Peninsula Hotel London and Rapid Access Ltd exemplified the successful integration of access solutions that met stringent safety, acoustic, and efficiency standards in a luxury hospitality setting. The installation of 2-hour fire rated Riser Doors with a 40DB acoustic rating not only met functional needs but also contributed to the overall safety and comfort of The Peninsula Hotel London, enhancing the guest experience. This case study underscores the importance of selecting the right access solutions provider for high-end establishments with specific safety and comfort requirements.
Sponsored
Darwin Centre, Natural History Museum

Darwin Centre, Natural History Museum

dormakaba UK & Ireland Ltd

Accessible for every visitorThe landmark £78 million Darwin Centre is the most significant development at the Natural History Museum since it moved to South Kensington in 1881. With over four and a half million visitors passing through its doors every year, choosing the right door products was crucial if this popular tourist attraction was going to stand the test of time.dormakaba’s contribution to the projectdormakaba TS 92, TS 93, and ITS 96 cam-action door closers were specified due to their low opening forces in accordance with BS8300 and their aesthetical design, which is in keeping with the overall style of the Darwin Centre. The TS 92 and TS 93 cam-action closers have been installed with the electro-magnetic hold-open feature and have been designed to remain open, closing automatically if the fire alarm is triggered. Offering the illusion of an invisible closer, the ITS 96 is a concealed cam-action closer hidden within the door leaf and frame, complementing the overall modern and sleek design of the new centre.As part of the brief, a wall of glass was to surround the technology and displays within the Darwin Centre, only accessible by staff through glass doors. Due to the small diameter between the wall and the glass door, specialists in glass interior products, Harbrine, overcame this by using dormakaba’s EA pinch free patch fitting which allowed safe access with a clear view of the museum display.dormakaba BTS 75V and BTS 80 floor springs also feature at the redevelopment. These floor springs feature a hydraulically controlled closing cycle, adjustable closing speed and mechanical backcheck.Also installed is dormakaba’s ED 200 – an automatic swing door operator that offers an optimum solution for safety in high traffic areas. During an emergency, fire doors and exit doors must continue to open for people to exit, but close firmly to prevent the fire or smoke spreading. The ED 200 is particularly appropriate for internal fire door applications and has been successfully third party fire tested to EN 1634-1 on timber doors. Its unique package of safety, security and interfacing features means that when a fire alarm is actuated, or when the power is cut, the closer will revert from automatic to manual operation with a hydraulically dampened spring close action.
Sponsored
FIREFLY ZEUS Lite™ Safeguards Ceiling Spaces Across Wakefield Food Warehouse

FIREFLY ZEUS Lite™ Safeguards Ceiling Spaces Across Wakefield Food Warehouse

FIREFLY™ TBA

FIREFLY ZEUS Lite™ Safeguards Ceiling Spaces Across Wakefield Food WarehouseForming a fresh element to the UK’s critical food supply infrastructure, a new distribution warehouse in Wakefield, West Yorkshire, is near to completion with the specialist suspended ceiling installer making use of ZEUS Lite™ 90:30 from the range of TBA FIREFLY™, to create vertical fire barriers at intervals within the roof-space across the footprint of the building.The 15,300m2 facility at Headways in Stanley, on the outskirts of Wakefield, has been built by GF Tomlinson for the Kitwave Group, a national distribution business with a fleet of over 500 vehicles supplying hotels, restaurants and many other venues across the country. The installation of the ZEUS Lite™ was undertaken by Nottingham Suspended Ceilings, as the sub-contractor well experienced with the performance and user-friendly characteristics of the Firefly range.All the rolls of ZEUS Lite™ 90:30 material and the well proven FIREFLY™ fixings, including stainless steel staples and fire-resistant adhesive, were supplied to Nottingham Suspended Ceilings by the merchant, Minster On-line.The site agent for Nottingham Suspended Ceilings, Mark Prescott, commented: “Our company carries out commercial contracts right across the East Midlands and beyond, where we have made use of Firefly barriers on a large number of past projects. Although you have to be a competent contractor and follow the manufacturer’s guidance precisely, we find the ZEUS Lite™ and other products in the FIREFLY™ range straightforward to install. In the case of the warehouse here, we have now completed the installation of the fire barriers up to roof level in dozens of locations across the building; as well as installing all of the suspended ceilings throughout.”FIREFLY™ ZEUS Lite™ is ideally suited to this type of application, comprising a flexible woven fabric fire barrier that has been specifically developed for the vertical separation and compartmentation of extensive concealed spaces within buildings.By offering 90 minutes integrity and 30 minutes insulation, FIREFLY™ ZEUS Lite™ 90:30 exceeds the minimum requirements regarding fire barriers under the Building Regulations’ Approved Document B (Fire Safety). The specially treated glass fibre fabric is strong and resilient as well as flexible while, crucially, the system’s certification covers the inclusion of service penetrations; which many alternative products do not.
Sponsored
Powdertech finishes 'duo' at Bournemouth University

Powdertech finishes 'duo' at Bournemouth University

Powdertech (Corby) Ltd

Overview Cladding on a student accommodation block needed replacing to comply with current standard and regulations. Our powder coating finishes passed stringent tests.Location: Bournemouth      Sector: Education/Residential.   Client: Metalline.  Specification: C4M Urban, A2,s1-d0  Main Contractor: Starfish   Area coated: 6000sq m.The RequirementExisting cladding on a student accommodation block at Bournemouth University International College needed replacing to comply with current standards and regulations, key amongst which is the ‘Reaction to Fire’ rating, A2, s1-d0. Also important was the need to impact futureproofing of the building by improving the building façade lifespan in its exposed coastal site, close to the Bournemouth seafront.The designers proposed a robust replacement system, which, on completion, would exceed current high-rise cladding legislation. More detail on this project can be found on the Starfish website HERE.The Powdertech Solution‘Peat Fire’, a finish from our Rust collection, a Powdertech Wood Finish shade and a RAL shade were selected by the client to be used across the building façade. These were applied as marine grade with great attention paid to metal protection pre-treatment.The building owners insisted on complete and independent fire testing of all the chosen products for the cladding. A fire barrier system was set up in Belfast under a BS 8414 testing criteria, to be conducted before acceptance of the proposed design and fixing solution. The three Powdertech finishes selected by the client were all pre-tested on the Metalline aluminium cladding and final inspection readings demonstrated full compliance. Meeting with the main contractor, Starfish, and Metalline ensured a good level of understanding and communication throughout the project.Read more on our powder coating and reaction to fire regulations HERE Why Powdertech?We offer a wide range of unique finishes; those chosen here provided the popular ‘aged and weathered’ look.All finishes are rated A2, s1-d0 for reaction to fire.Our finishes offerExcellent corrosion protection and weather resistanceHigh level of colour and gloss retention and high performance abrasion resistanceFinishes conform to BS EN 12206-1 and Qualicoat specificationsA 25-year warranty was provided for all three finishes used in this project with an expected 40-year lifespan.
Sponsored
Hidden Aluminium Gutter at Marriott Courtyard Sandy Park Hotel

Hidden Aluminium Gutter at Marriott Courtyard Sandy Park Hotel

Dales Fabrications Ltd - Aluminium Eaves Products

Project type: Hotel Location: Marriott Courtyard Sandy Park Hotel, Sandy Park Way, Exeter, EX2 7NN Project Cost: £35mProduct: Complete Eaves System Including: Meridian Coping System, Fascia Soffit, Hidden Aluminium Gutter Finish: Syntha Pulvin RAL 7016 Anthracite Grey Fire Rating: A2 s1, d0 Non-combustible (Reaction to Fire EN BS 13501-1:2018) Support method: Monocoque Support System Architect: Kensington Taylor Architects Contractor: DNA Intergrated Construction Sub Contractor: T.A. Colbourne Projects
Sponsored
Vertical Rainscreen Cladding Panels at Chelsea Waterfront, London

Vertical Rainscreen Cladding Panels at Chelsea Waterfront, London

Dales Fabrications Ltd - Aluminium Eaves Products

Location: Lots Road, Chelsea, LondonProject Type: HousingDevelopment Cost: £60mProduct: Rainscreen CladdingMeridian Wall CopingsShadex 150 Privacy ScreensPerforated Secret Fix Soffit Panels (To Balconies)Finish: Syntha Pulvin RAL 7012 Matt Basalt Grey S4L0891: Qualicoat 2Fire rating: A2 s1, d0 Non-combustible (Reaction to Fire EN BS 13501-1:2018)Client: CK Asset Holdings LtdArchitect: FarrellsMain Contractor: Rollecate Facades LtdSub Contractor: Rollecate Facades Ltd
Sponsored
Aluminium Fascia Soffit at Haberdashers' Askes Boy's School

Aluminium Fascia Soffit at Haberdashers' Askes Boy's School

Dales Fabrications Ltd - Aluminium Eaves Products

Location: Haberdashers’ Askes’ Boys’ School Pre-Prep Building, Butterfly Lane, Elstree, Hertfordshire, WD6 3AFProject type: EducationProject Cost: £7mProduct: Fascia SoffitFinish:  RAL 7044 Matt Silk GreyProduct: 101.6mm Rainwater PipeFinish: RAL 7033 Matt Cement GreyFire Rating: A2 s1, d0 Non-combustible (Reaction to Fire EN BS 13501-1:2018)Architect: IID ArchitectsContractor: Volker Fitzpatrick LtdSub Contractor: Stafford Rainwater Systems Ltd Photography: Andy Stagg Photography
Sponsored
Shadex 100 Brise Soleil at McDonalds, Ilkeston

Shadex 100 Brise Soleil at McDonalds, Ilkeston

Dales Fabrications Ltd - Aluminium Eaves Products

Project type: RestaurantLocation: Rutland Street, Ilkeston, DerbyshireProduct: Shadex 100 Brise Soleil Horizontal Support method: First Fix Brackets: Through CladdingFirst Fix Brackets: Curtain-walling MullionsFirst Fix Brackets: Blockwork, Before RenderFinish: Syntha Pulvin RAL 5012 Matt Light BlueFire rating: A2 s1, d0 Non-combustible (Reaction to Fire EN BS 13501-1:2018)Architect: Peart Bradley ArchitectsContractor: Coxmoor Projects LtdSub Contractor: R. & J. Projects Ltd
Sponsored
Shadex 260 Elliptical solar shade system in aluminium reduces costs on £1.1 million renovation at Beths Grammar School, Bexley

Shadex 260 Elliptical solar shade system in aluminium reduces costs on £1.1 million renovation at Beths Grammar School, Bexley

Dales Fabrications Ltd - Aluminium Eaves Products

Location: Bexley, Greater LondonProject Type: EducationalDevelopment Cost: £1.1mProduct: Curved Plain Fascia with THX Soffit PanelsMeridian Wall CopingShadex 260 Drop-in Cassettes (Structural Steel Supports)Contemporary Rainwater Pipes​Finish: Syntha Pulvin RAL 7011 Matt Iron GreyFire rating: A2 s1, d0 Non-combustible (Reaction to Fire EN BS 13501-1:2018)Client: Beths Grammar School, BexleyArchitect: Ingleton Wood ArchitectsMain Contractor: Horizon ConstructionSub Contractor: Specialised Fixings of Ipswich
Sponsored
Curved Aluminium Fascia and Rainscreen Panels at Terrace Mount, Bournemouth

Curved Aluminium Fascia and Rainscreen Panels at Terrace Mount, Bournemouth

Dales Fabrications Ltd - Aluminium Eaves Products

Location: Bournemouth, DorsetProject Type: Mixed use – Housing, Hotels & RetailDevelopment Cost: £20mProduct: 800m Meridian Aluminium Wall CopingsCurved Aluminium FasciaSecret Fix Soffit Panels Rainscreen Panels​Finish: Syntha Pulvin RAL 9007 Matt Anthracite Grey Aluminium: QC2 Powder & Marine Specification Fire rating: A2 s1, d0 Non-combustible (Reaction to Fire EN BS 13501-1:2018)Client: McAleer & RusheArchitect: White Ink ArchitectsMain Contractor: McAleer & RusheSub Contractor: Rollecate Facades Ltd
Sponsored
Dan Court Wembley, London

Dan Court Wembley, London

EFFISUS

The purpose of this development is making the re-cladding of an existing building removing Aluminium Composite Material insulation and cement particle board and replacement with new 3mm aluminium cladding and associated works. The new building will include a mixed tenure unit of 138 one, two and three bed apartments. It’s design was developed by the PRP Architects. Its design was developed by the PRP Architects. In order to protect the façade building from moisture, driving rain and wind the solution Effisus A2 Fire Rated Breather FR System was applied, using an A1 Fire Rated Breather FR Membrane.
Sponsored
Kings Cross Underground Station, London

Kings Cross Underground Station, London

Howe Green

Over 60 of Howe Green’s 7500 Series floor access covers were chosen for the development of a sizable extension of King’s Cross tube station. An access solution was required to provide access to essential under floor services including ventilation ducting, electrics, communication cables and rail services. The specification required a solution that would prevent the passage of fire through service channels. Howe Green’s 7500 Series access covers met requirements with a three hour fire rating. In addition to single covers, Howe Green’s innovative multi-part covers were also used.
Sponsored
Boden, Leicester

Boden, Leicester

Planet

British clothing company, Boden, found the perfect location in Leicester, to expand their warehouse and contact centre.With a fashionable interior at the forefront of architect, Spacelab’s, mind, LOFT20 provided the ideal solution. A fantastic alternative to slim framed office partitioning, LOFT20 was used throughout the interior, from meeting rooms, to the break-out spaces.Where fire rated partitioning screens and doors were needed, FireClear was the obvious solution, being fully compatible with LOFT20. Achieving E30 fire rating, FireClear had mullions and transoms applied, in the same width and colour as LOFT20, to provide seamless integration throughout the design.
Sponsored
London Stadium

London Stadium

Hart Door Systems Ltd

London Stadium (formerly and also known as Olympic Stadium) is a multi-purpose outdoor stadium at Queen Elizabeth Olympic Park London.Project/doors:21 Fire and Security shutters (2010)50+ Fire and Security shutters (2015)The challengeHart assisted with the specification prior to the award. Technical collaboration was ongoing ensuring that integration and operation of the shutters went smoothly with safety and continuity in mind. Hart was subject to strict working practices and the factory was visited to review progress and audit Hart's quality system procedures.The solution2010 - Manufacture, supply, deliver and install 21 Fire Resistant and Security Shutters to the Olympic Main Stadium requiring advance battery backup and operational features. 2015 - Manufacture, supply, deliver and install over 50 Security and Fire shutters to the new build including kiosk shutters, security entrances and POD buildings surrounding the arena. The successHart was chosen out of 50+ door companies to supply all of the roller shutters to the London 2012 Olympic main stadium. Hart was again awarded all of the roller shutters under much competition on the stadium transformation project in 2015 which was transformed to cater for the multi-use environment.The review:“You should be commended for the cooperation, commitment and effort applied by your entire team. From early design discussions to your final commissioning activities of the 50 new shutters onsite, it was a pleasure to work with such proactive and knowledgeable organisation.” Jon Pepper, Project Manager, Balfour Beatty
Sponsored
University Arms Hotel

University Arms Hotel

SELO

Elevating Luxury Living at University Arms, Cambridge.University Arms, Cambridge, a quintessentially British hotel, embarked on a transformative journey to redefine luxury and sophistication in its 189 rooms and suites. As part of this ambitious project, Selo Doors was entrusted to supply bespoke riser doors, seamlessly blending classic Edwardian interiors with modern aesthetics while meeting stringent fire-rated and concealed requirements.Selo Doors took on the challenge of providing bespoke riser doors tailored to the unique requirements of University Arms. The emphasis on customization ensured that the riser door sets seamlessly integrated into the overall design, offering a concealed and flush appearance. The metal riser doors were crafted with precision, aligning with the hotel’s commitment to quality and aesthetic excellence.Recognizing the critical role of fire safety in a luxury hospitality setting, the bespoke riser doors supplied by Selo Doors were meticulously engineered to meet rigorous fire-rated standards. This not only prioritized the safety of occupants but also underscored the commitment to compliance with industry regulations.The collaboration between University Arms, Cambridge, and Selo Doors resulted in the creation of a luxurious haven where bespoke riser doors play a pivotal role in elevating the overall aesthetic and safety standards. The fusion of British elegance, bespoke craftsmanship, and fire-rated excellence underscores the commitment to offering guests a memorable and secure stay. This case study serves as a testament to the seamless integration of bespoke riser doors in a prestigious hospitality setting, where attention to detail and quality craftsmanship are paramount.
Sponsored
Merrielands Crescent

Merrielands Crescent

ARC Building Solutions Limited

RC was approached by Dorsey Construction Materials to supply our award-winning cavity fire barriers and cavity closers for a high-rise housing development in Dagenham.
Sponsored
European Oak for Dumfermline Carnegie Library & Gallaries

European Oak for Dumfermline Carnegie Library & Gallaries

International Timber

International Timber recently supplied Firside Joinery with high quality, fire-treated European oak cladding for the award-winning Dunfermline Carnegie Library and Galleries.
Sponsored
Hyatt Regency's new tavern-style bistro pub, the Gentleman & Scholar, invests in Opti-myst flame technology

Hyatt Regency's new tavern-style bistro pub, the Gentleman & Scholar, invests in Opti-myst flame technology

Glen Dimplex Heating and Ventilation

“On this basis, my engineering team went on the hunt for a fire that would eliminate as many of these issues as possible – and that is how we discovered Dimplex’s Opti-myst technology.”
Sponsored
Bespoke powder coating colours made to replace glass panels

Bespoke powder coating colours made to replace glass panels

Powdertech (Corby) Ltd

Two shades of blue, light and dark, formally in glass panels, needed to be replicated when the glass was removed and replaced within areas of the rainscreen façade and spandrel panels across all levels of a student accommodation tower block in Kings Cross, London.Powdertech was sent shards of blue glass from the old windows, to match with a powder coating both in shade and gloss level. Working in close contact with the client Powdertech directed one of its powder manufacturers to make two unique shades of blue to match the old glass in both colour and gloss. Powdertech coated 4500 sq m of aluminium spandrel panels of sizes ranging from 350mm by 2500 mm to a larger size of 900mm by 4500mm.The non-combustible cladding panels are designed to help prevent fire damage quickly and easily spreading as part of the system. They perform to technical criteria, sound insulation and thermal performance and reduce environmental issues. Powdertech’s powder coatings and application techniques all conform to reaction to fire rating A2-s1,d0, thus contributing to the fire safety of the panels
Sponsored
122 Waterloo Street, Glasgow

122 Waterloo Street, Glasgow

Pilkington United Kingdom Limited

The newly completed 122 Waterloo Street development in the centre of Glasgow offers its occupants floor-to-ceiling glazing throughout, with almost uninterrupted views thanks to the latest Schüco curtain-walling system designed, manufactured and installed by Edinburgh-based façade specialist Charles Henshaw & Sons Ltd.But, impressively, the landmark building – which will be the Glasgow headquarters of global financial services firm Morgan Stanley – will also be one of the most energy efficient buildings in Scotland, thanks in part to high-performance glass coatings from Pilkington United Kingdom Limited.The scheme has been certified BREEAM Excellent, and achieved an ‘A’ rated Energy Performance Certificate (EPC), the latter based on a detailed assessment of the building’s energy performance. The glazing helps to minimise this by reducing energy emitted from the building, as well as the heating effect of the sun, both of which can make maintaining a comfortable interior climate more energy-intensive.A glass for all seasonsThe scale of the building and the large area of glass used means that excessive radiation of heat from the building could lead to rapid heat loss during colder conditions, requiring an increase in heating to keep the interior warm.To mitigate this effect, the glazing features a Pilkington Optitherm ™ S1 Plus low-emissivity coating which reflects radiated heat back into the building.The second issue that can affect buildings where most of the envelope is glazed is excessive heat build-up when the sun is shining directly into the interior. This can present a challenge for building managers, often requiring high levels of energy-intensive air conditioning.To combat this, a solar-control coating has been used, reducing the amount of heat energy that is able to enter the building while maintaining high levels of transparency. Michael Metcalfe, commercial sales manager at Pilkington UK, said: “The Pilkington Suncool™ 70/35 T coating selected by the design team offers high visible light transmittance, reduced solar transmittance and excellent low-emissivity all in one product.“This means the floor space will be brightly lit by sunlight but won’t suffer from overheating on warmer days.”Clear viewsThe coatings are not the only innovative part of the glazing used in the project, as the glass is held in place by the latest structurally bonded curtain wall system from manufacturer Schüco. Each unit contains a large pane of clear glass and a smaller pane of opaque, coloured spandrel glass, creating horizontal lines across the façade between each floor of the building.Michael Metcalfe continued: “The metal carrier frames in which the glass sits are extremely low profile, so the edges of the panes of glass are very close to one another. This removes the mullions normally associated with unit-based glazing systems, creating a flush glass surface with almost uninterrupted views.”The clarity of the glazing was further improved by the use of Pilkington Optiwhite™ true low-iron glazing throughout, which significantly reduces the slight green tint that is inherent in standard float glass.On the ground floor, Pilkington Optilam™ laminated glazing was used to provide protection against manual attack and increase the security of the building.Completed in December 2017, the nine-storey building also includes 155,000 sq ft of Grade A office space.Project: 122 Waterloo Street, GlasgowClient: HFD GroupArchitect: Micahel Laird ArchitectsCurtain walling supplier: SchücoInstaller: Charles Henshaw & Sons LtdImages courtesy of S G Photography
Sponsored
Alumet HQ

Alumet HQ

Knauf Insulation Ltd

CHALLENGEAs part of a full exterior refurbishment, building envelope contractor, Alumet, required a new façade system that would transform and modernise the exterior of the Jubilee House building, which was originally installed in the early 1970s. Coupled with this was the requirement to improve thermal and energy efficiencies.SOLUTIONKnauf Insulation supplied its Rocksilk® RainScreen Slab to ensure optimal fire, thermal and acoustic performance. The key to Knauf Insulation securing the project was the ability to provide in depth technical support, including complex 3D heat flow modelling calculations which took into account the specific system brackets, which act as a significant cold bridge within rainscreen cladding systems.Knauf Insulation’s Rocksilk® RainScreen Slab was installed on the brick facade of the existing building, which once complete, significantly improved the U-value thus reducing the heat loss through the wall.The insulation layer is a fundamental component of any successful rainscreen cladding system and mineral wool insulation delivers a number of advantages for this type of application. Rocksilk® RainScreen Slab is a Rock Mineral Wool slab containing a water repellent additive, designed for use on masonry wall constructions and as the outer insulation layer in steel frame projects.Quick and easy to install, the product is simple to cut and the slabs knit together to create a snug fit, with no need to tape the joints as may be required with rigid foam boards – ensuring maximum acoustic and thermal performance."We wanted to turn our headquarters into a thermally efficient building and to really project a modern ‘green’ image. The Schueco Façade system, along with Knauf Insulation’s products, helped us to achieve this as well as dramatically reducing our carbon output.We have received some fantastic feedback from local residents saying how good the new façade looks and coupled with the improved thermal efficiencies, we are very pleased."- Alumet Director, Dean Walton
Sponsored
The Castings

The Castings

illbruck – a brand of Tremco CPG UK Ltd

Project: The Castings, Piccadilly EastLocation: Heyrod Street, ManchesterVCL membrane system supplier: ADA FastfixSystem used: illbruck ME060 A2-Membrane Pro Air and Vapour Control Layer, illbruck TF448 High Performance Bonding Tape, ME322 Internal Tape 100illbruck, a part of CPG UK, have celebrated the successful installation of their new A2 fire classified vapour control layer within an exciting new residential development in the heart of Manchester.The projectThe Castings, Piccadilly East is on a 0.7-acre site in the Manchester Piccadilly regeneration area and includes four stepped building elements rising to 25-storeys high. The development will consist of 352 build-to-rent (BTR) apartments, including a mix of studio, 1, 2, and 3 bed units, alongside roof terrace gardens, retail and amenity space, and a public square. The project was designed with a focus on sustainability, to deliver low energy consumption with highly efficient building fabric.ADA Fastfix, a leading supplier into the construction industry, were approached to find an airtight vapour control membrane which would ensure high levels of thermal performance and energy efficiency in the building. As a ‘relevant building’ according to Building Regulations Approved Document B, the installed membrane needed to be a fire classified solution; an A2 fire classified solution was requested to provide enhanced fire safety for the building and its occupants.The solutionADA Fastfix selected illbruck ME060 A2-Membrane Pro Air and Vapour Control Layer due to its enhanced reaction to fire classification of A2-s1, d0 to EN 13501-1, excellent product performance, and the accompanying technical support from the illbruck team. illbruck ME060 A2-Membrane uses advanced technology to combine reinforced glass fibre with an aluminium and laminated coating, providing long lasting strength and durability. The special coating also improves thermal performance by reflecting up to 95% of heat.  Its airtight and vapour-tight properties, which can be used to comply with Passivhaus, helps improve energy efficiency whilst protecting the building fabric from moisture vapour and condensation.The applicationOver 6,000m2 of illbruck ME060 A2-Membrane Pro Air and Vapour Control Layer was attached to the Steel Frame Structure using TF448 50mm high performance tape. The lap joints and window details were then sealed with ME322 70mm tape. This system can be used on the internal structure of a timber frame or lightweight steel structure to manage air and moisture flow, as well as enhance the building’s thermal performance, energy efficiency, and fire safety. Alongside providing high performance products, the illbruck team also helped the client with detailed drawings, technical service and application guidance, and on-site support – to ensure a smooth installation process and great finished result.Project overviewScott Hurry, Area Sales Manager at CPG UK, said, “illbruck ME060 A2-Membrane was the ideal choice for this fabric first build due to its enhanced reaction to fire classification as well as helping to improve thermal performance in the building. This is the first major installation of our new ME060 A2 fire classified membrane - we’re delighted to work with ADA Fastfix to see our products installed in this development, where our membrane will be helping to protect the building and its residents for years to come.”
Sponsored
Klasse G-Board & C-Board | Trident Point, Harrow

Klasse G-Board & C-Board | Trident Point, Harrow

Klasse Group Ltd

A cladding replacement project, Klasse G-board and C-board have both been utilised due to their A1 fire-rated, fully non-combustible classification.
Sponsored
Queen Victoria Street, London

Queen Victoria Street, London

Buzon UK Ltd

The new corporate headquarters for Mellon Bank comprises offices and a trading floor, and is located on the site of the former Times Newspaper Headquarters in Queen Victoria Street. The site falls within one of the designated Strategic View Corridors, intended to protect long distance views of St Paul's Cathedral and the roof terrace provides the perfect place for employees to meet, relax and enjoy the great views.Buzon were specified to supply and install 20mm external porcelain tiles on BC-FR class B fire-rated adjustable pedestals on the roof terrace and access stairwell, along with fire-rated spacer tabs and shims.
Sponsored
Balcony Cladding at The Astley, Manchester

Balcony Cladding at The Astley, Manchester

Dales Fabrications Ltd - Aluminium Eaves Products

Location: Port Street, Northern Quarter Manchester M1 2EGProject Type: Housing (Private Rental Sector) Development Cost: £27m Products: Aluminium Soffit Cladding to Recessed Balconies, Weatherstruck Aluminium Wall Copings Finish: Interpon D1036 RAL 1036 Matt Pearl Gold Fire rating: A2 s1, d0 (Classification Reaction to Fire EN BS 13501-1:2018). Client: Mulbury City Architect: Tim Groome Architects Main Contractor: Bardsley Construction Ltd Facades Contractor: Longworth Building Services Ltd Sub Contractor: Stafford Rainwater Systems Ltd
Sponsored
Shadex 150 on Steelhouse Gateway at Teesworks

Shadex 150 on Steelhouse Gateway at Teesworks

Dales Fabrications Ltd - Aluminium Eaves Products

Project type: Freeport Location: Steelhouse Gateway, Teeside Project Cost: £2.5m Product: Shadex 150 (Drop-in Casette) Finish: Syntha Pulvin RAL 7022 Matt Umbra GreyProduct: Dales Sigma Fascia Finish: Syntha Pulvin RAL 7022 Matt Umbra Grey Product: Dales Lower FasciaFinish: Syntha Pulvin RAL 7030 Matt Stone Grey Fire Rating: A2 s1, d0 Non-combustible (Reaction to Fire EN BS 13501-1:2018) Client: Teesworks  Architect: POD Architects Contractor: Esh Group Sub Contractor: Entec Design Services Ltd
Sponsored
Olympic Cauldron, Abu Dhabi, 2019

Olympic Cauldron, Abu Dhabi, 2019

United Anodisers Ltd

The 2019 Special Olympics Cauldron Abu Dhabi was designed and fabricated in Yorkshire by Stage One Creative Services Ltd. It was then anodised using a selection of colours from our Anolok Bronze range. The anodised panels were then air freighted to Dubai where they were installed to create this magnificent cauldron prior to the opening ceremony. Each county did their own text which was applied underneath the logo using our UnAtex process. The main aim of this project was to ensure the material would be A1 fire rated due to flames being projected from inside the cauldron, hence making fire rating imperative.
Sponsored
Only a functioning smoke alarm can protect you

Only a functioning smoke alarm can protect you

Safety Technology International Ltd

Protecting detection systems is vital to fire safety with only a functioning smoke alarm able to protect you in an emergency.Landlord regulations and Government policesLandlords have responsibilities to keep tenants safe in their properties by providing functioning life safety equipment.Regulations introduced in 2015 require private sector landlords to ensure they ‘have at least one smoke alarm installed on every storey of their properties’ as a legal requirement.There is also a proposed change to this regulation, coming into effect later this year, which will mean social housing is also included, making it mandatory that all rented accommodation must have working smoke alarms fitted. It will also be compulsory for landlords to repair or replace any faulty alarms as soon as they are made aware of defects.Fines up to £5000To protect their tenant, it is the landlord’s responsibility to ensure detectors are fitted and working at the start of every new tenancy agreement. Failure to comply with The Smoke and Carbon Monoxide Alarm Regulations introduced in 2015 can result in a hefty fine of up to £5000.One exasperated landlord wrote online that in one of his properties “Two of the detector heads have been tampered with, presumably so that the tenants can smoke in their rooms”. Consequently, this had been causing false fire alarms and it is up to the landlord to repair or replace the alarm.In some extreme cases, landlords have discovered that smoke alarms have been removed all together from properties, due to disturbances when cooking, smoking, etc. It is then up to the landlord to replace the alarm, and so it is advisable to invest in measures to prevent the alarms removal; some recommendations have been made in government legislations such as BS 5839-6:2019.Ultimately, landlords should feel obligated to ensure regular testing of smoke alarms and the replacement of batteries in their properties to reduce the risk of void insurance or a remedial notice. Simply testing smoke alarms can also help to prevent any danger to tenants and damage to properties should a fire occur.BS 5839-6:2019The latest recommendations in BS 5839-6:2019 are primarily concerned with saving lives and reducing injuries caused by fire, but also covers reducing property damage, which can be extremely costly to landlords in the case of fires.The guidance in BS 5839-6:2019 suggests that in environments such as HMOs, where multiple occupants can be disturbed by false alarms, landlords could alter their smoke alarms systems to have delays before the signal is sent to all tenants for the occupier to investigate the cause. This can help to reduce complacency during false fire alarms or the temptation to dangerously compromise smoke alarms.The recommendation also states that landlords should seek alternative smoke alarms that can alert to intervention or disablement of the alarm in the event of tenants continually tampering.Tenants’ responsibilityAlthough it is the landlords legal duty to provide working smoke alarms in all properties, tenants must not tamper with smoke alarm, remove them, cover them up or in any other way damage or prevent them from operating in their intended manner. Failure to comply with this could result in the tenant facing a substantial fine, or termination of their tenancy agreement.It falls to the tenants to take their own safety into consideration and should contact landlords if there are any issues with smoke alarms, such as false fire alarms, so their landlord can test and replace the batteries, or alarms themselves if necessary. Preventing alarms from effectively detecting fires can result in fatal incidents and also fines for misconduct falling to the tenants.One student at Edinburgh University covered the smoke alarm in his room with bubble wrap whilst living in student accommodation. Preventing the smoke detector from working effectively proved a dangerous mistake when a fire started in his room and he had to be pulled to safety after being found struggling to escape the flames while the building was being evacuated. As a consequence for this reckless behaviour, he was fined and ordered to pay £1000 in compensation after being arrested and pleading guilty.Steel Web Stoppers®  Safety Technology International is a specialist manufacturer of a range of fire, safety and security products; their wire cages help to prevent tampering with essential life safety equipment, such as smoke alarms.STI’s Steel Web Stoppers®  are designed to protect against vandalism, misuse and damage to smoke and fire detectors. Constructed from plastic coated, heavy-duty galvanised steel rod, the Steel Web Stoppers can withstand the severest of abuse from vandalism or accidental damage. It also prevents tampering with the alarm, without hindering legitimate use, therefore still allowing the landlord to service the device and replace batteries when appropriate.
Sponsored
Awnings and Fit-Box roller blinds in Estudio B76 Headquarters

Awnings and Fit-Box roller blinds in Estudio B76 Headquarters

Bandalux Industrial SA

Estudio B76 designed its new headquarters in an industrial warehouse built in the 50s. They kept and revealed reinforced concrete trusses and the perimetral walls made of bricks. The design focuses on using glass and steel to maintain the industrial atmosphere.Thanks to active and passive sustainable measures, such as photovoltaic panels, aerothermal energy, and efficient shading solutions, the project achieves high sustainability.From Bandalux, we proposed a combination of systems suitable for both the working and residential parts of this mixed project:, but Veranda Plus is particularly convenient as it completes without denaturing the former structure of the building.
Sponsored
St Margarets Head Railway Tunnel

St Margarets Head Railway Tunnel

Cordek Ltd

The now disused St Margaret’s Head Tunnel was a structure originally formed as part of the Dunfermline to North Queensferry railway line, providing a link to the ferry service until the opening of the Forth Bridge in 1890 and remaining in limited use for freight until 1954. The vaulted roof and brick lined tunnel is located 15 metres below the A900 trunk road and the B981, adjacent to the northern approach to the Forth Road Bridge. Cordek were asked to supply a structural fill solution, encapsulated within a protective membrane to fill the entire cavity of the tunnel.
Sponsored
Optima Casement Windows were a central part of a £1.3 million renovation project at Woldgate School and Sixth Form College in Pocklington near York

Optima Casement Windows were a central part of a £1.3 million renovation project at Woldgate School and Sixth Form College in Pocklington near York

Epwin Window Systems

Woldgate School secured £1.3 million for improvements to its buildings from the Department for Education. The funds were to cover work including the removal and replacement of external walls not of brick construction, as well as windows and doors, many of which were the originals from when the school was first built. Profile 22 Approved Window Contractor Kingfisher Windows was appointed principal contractor for the works. The company undertook the design, manufacture and installation of the window element of the project and worked closely with trusted sub-contractors to deliver other aspects to the high standards the project demanded.
Sponsored
Switch House, Tate Modern Extension, London

Switch House, Tate Modern Extension, London

Leviat

The latest architectural wonder to rise from the banks of the Thames is Switch House, the highly anticipated extension to Tate Modern, which opened in June 2016. Ancon’s contribution to this landmark project was the fabrication of 12,000 special stainless steel corbels and over 600,000 stainless steel pins which now support and restrain the stunning brick façade, helping to turn this unusual design concept into a reality. With construction now complete, Ancon’s critical structural components are completely hidden from view, leaving onlookers to simply marvel at the overall effect and the ingenuity at work.
Sponsored
Naylor and the Olympic Legacy Part 1

Naylor and the Olympic Legacy Part 1

Naylor Concrete Products Ltd

Designed by EDF and NORD Architecture, the first building completed on the Olympic site was the Substation that powered the whole Olympic site. The Legacy plans also meant that it would remain for the post-Olympic development as well, to power future developments for the Stratford City Development. Construction started in 2007, was completed in time for the 'Power On' date of June 2009 and was built by Winchmore Brickwork, using Ibstock Himley bricks and including Naylor Concrete Lintels supplied by Civils and Lintels, Erith. The building won several awards including the prestigious 'Best Brickwork in Britain' award in 2010.

Showing 721-756 of 944

Feedback