NBS Source
I'm a manufacturer

"electric fires and room heaters"

5,802 results found

Sort by:

Showing 721-756 of 1716

Sponsored
Procheck A2 - Meridian One

Procheck A2 - Meridian One

A Proctor Group Ltd

Procheck A2, the high-performance fire-resistant vapour control layer system from the A. Proctor Group has been selected as part of a £6bn regeneration project that will create over 10,000 homes in Enfield, London, over the next 20 years.Leading regeneration specialist Vistry Partnerships has been appointed for the first phase of the Meridian Water scheme working in partnership with Enfield Council. Meridian One will see the development of 1,000 new homes with a mixed tenure of private sale, private rent (PRS) and 50% affordable housing spanning 13 blocks ranging in height from four to twelve storeys. In addition, the scheme incorporates 2,235m2 of employment space and over 2 hectares of green, parkland and open space.Sam Bennett, Commercial Director at SCL LONDON, a Structural Framing Systems and Drylining specialist, commented.“Procheck A2 was selected because it has a Class A2 performance and excellent vapour-controlling properties. In addition, the membrane comes with a high vapour resistance and is airtight, allowing its use as an AVCL.This means that Procheck A2 provides high levels of airtightness which ensures the thermal efficiency of the building.”“Procheck A2 has an A2-s1,d0 fire classification to BS EN 13501-1, is considered limited combustibility and minimal contribution to fire, and therefore, conforms with the requirements for high rise construction (18m).” The superior performance of Procheck A2 from the A. Proctor Group is the perfect solution, delivering significant benefits to the combination of in-factory manufacture and on- site housing construction.Procheck A2 comprises a unique design consisting of a glass fibre backing with a pure aluminium foil and clear lacquer coating. It is this clear surface which provides Procheck A2 with the added benefit of a low emissivity surface, which, when used with a service cavity, can enhance the overall thermal performance of the building fabric, as well as ensure a high fire protection performance, with an A2-s1,d0 fire classification. Procheck A2 is designed to protect the building fabric from the potential risks of condensation whilst providing the added benefit of serving as an effective airtight barrier.Sam Bennett added,“the technical team at the A. Proctor Group supported us throughout and provided comprehensive installation guides giving vital information for both operatives and clients and helping with sign-off at specific hold points throughout the project.” Based on years of investigation, research and development, the A. Proctor Group can offer a superior range of technically advanced membranes to address the safe design of fire solutions in building construction.The installation of Procheck A2 will ensure a high level of protection throughout the building’s lifespan.
Sponsored
FIREFLY Phoenix Picked To Protect Pharma Giant’s New Macclesfield Plant

FIREFLY Phoenix Picked To Protect Pharma Giant’s New Macclesfield Plant

FIREFLY™ TBA

A Manchester based passive fire protection specialist has utilised products from the range of FIREFLY – including the versatile Phoenix Smoke & Flame barriers – to achieve the compartmentation of concealed spaces within the new Macclesfield manufacturing facility of a world-leading pharmaceutical giant.Firetech UK Ltd. is a key sub-contractor to DES for the construction of the extensive new laboratories and production plant for AstraZeneca, part of the FTSE 100 company’s continuing investment at its East Cheshire site for the distribution of drugs to markets around the world. Firetech was established more than 25 years ago and makes extensive use of FIREFLY  flexible fire barriers for its work on both commercial and domestic contracts. In the case of the Macclesfield project, Firetech purchased the FIREFLY  products via national distributor, Encon.  The Contracts Manager for Firetech UK on the Macclesfield Project, Josh Dodds comments: “We work nationwide though predominantly in the North-West of the country and have been using FIREFLY  products for the past five years, including here on this very large new plant.  Early on in the contract we installed a large quantity of Titan Lite™ 120:60 fire barriers in the ‘Amenities Area’ of the building and then when we were tasked with installing a series of smoke and flame barriers in the ceiling voids over the laboratories, we proposed the Phoenix product as being the most cost-effective solution. The work consumed approximately 540 square metres of the Phoenix to create a series of vertical barriers valued at some £50K.  Although we were able to employ standard details for the installation of the Phoenix barriers  and the Collaroll which wraps some of the beams and other features, FIREFLY has been involved from the earliest stages, providing general guidance and carrying out inspections.  The project has gone very well.”FIREFLY Phoenix is a lightweight smoke and flame barrier which facilitates compartmentation within buildings to provide up to 120 minutes’ integrity under BS476 Parts 20 & 22.  Certified by IFCC, the flexible and straightforward to install material is suitable for both new-build and retrofit situations.  Manufactured from woven and non-woven glass, the FIREFLY range is designed to optimise resistance to flame and smoke as well as offer heat protection in a wide range of scenarios. The flexible barriers are easy to install horizontally or vertically using a full selection of ancillary products.  Used mainly in the construction industry across the UK and Europe, FIREFLY fire barriers help to contain fire, giving building occupants extra time to evacuate and the fire service to enter safely.Images shown are taken during installation and some sections of the installation might be incomplete.
Sponsored
CASE: Motorised and concealed roof roller blind and curtains

CASE: Motorised and concealed roof roller blind and curtains

Blindspace

From the earliest concept stages, this London architect wanted to be sure that his garden room extension could really be the family's main living room. They were not looking for the traditional French Pinoleum Blinds that usually go with Vale Garden Houses, but instead, a modern horizontal blind, to be fully concealed when not required.Complete in every detail, coving to hide the lighting, shadow gap to complement the Blindspace cover finished in matching paint material. The attention to detail, at the planning stages, has paid off well with this installation.When taking the photos, the homeowner expressed her complete satisfaction with the way the blind had brought the whole room together. They were concerned that the inclusion of the large lantern would spoil the homely feel and use they wanted in this living area. The blind has meant that they can be comfortable in the room, at all times. They feel the blind is a huge success.
Sponsored
Croft Gardens, Cambridge

Croft Gardens, Cambridge

Cellecta Ltd

Croft Gardens is a four building student accommodation at King’s College in Cambridge, achieving full Passivhaus Classic standards. With 12 rooms across three floors of three crescents and a villa, along with the Victorian Holmcroft building which provides a library, laundry room and common room area, Croft Gardens provides 84 homes for graduate students. Including graduate rooms, communal facilities, landscaping and external works, Croft Gardens will be carbon negative for the first 7-10 years of operation.Cellecta’s HEXATHERM XFLOOR 500 was specified by Feilden Clegg Bradley due to its high resistance to compression and closed cell structure that provides unrivalled resistance to water absorption, making them ideal for residential applications. These insulation boards are used under a concrete slab to comply with part L Building regulations.Gilbert-Ash was awarded this 650m² contract for this development at Barton Road.
Sponsored
SIGA Trestard Bridgewater Wharf Manchester

SIGA Trestard Bridgewater Wharf Manchester

SIGA Cover AG

Luxurious high-rises were built on the River Irwell in Manchester. The challenge for M3 Build: To find a robust window sealing system that complied with fire protection Class B or higher. 
Sponsored
Knowsley Heights, Liverpool

Knowsley Heights, Liverpool

Advanced

Following a significant programme of compartmentation works undertaken in 2018, the 11-storey Knowsley Heights buildings have benefitted from a refit that includes installation of Advanced's EvacGo system. This is compliant with the BS 8629 Code of Practice for the design, installation, commissioning, and maintenance of evacuation alert systems for use by fire and rescue services in England and Wales.Knowsley Heights is owned by Livv Housing Group, an independent housing association, with the two buildings partially managed by an onsite manager. ABM Fire and Security Ltd undertook the complete supply, installation and commissioning of the EvacGo systems. A 4-loop, 16-zone evacuation alert panel was installed in each building. Each EvacGo panel is housed inside a STS 205 security-rated enclosure with patented BS EN 1303-compliant lock and key mechanism for exclusive access by the fire and rescue service – ensuring minimal risk of unauthorised use and full compliance with BS 8629.Audible and visual devices and interfaces were installed in the hallways of each of the 128 flats to ensure all residents, including people who are deaf or have hearing loss, are kept safe and informed.
Sponsored
Tarka Leisure Centre

Tarka Leisure Centre

Lusso Systems Ltd

The £15million new Tarka Leisure Centre in Barnstaple, was designed to link with the existing Tarka Tennis Centre. There is now a natural flow between the existing and new part of the completed facility. Sport England invested £1.8m of National Lottery funding into the development of Tarka Leisure Centre to support the ‘get active’ initiative by making the facilities accessible and inclusive for the local community. The new centre, officially opened by British Winter Olympics hero Eddie ‘the Eagle’ Edwards, provides a much-needed swimming pool facility, an ‘endless’ indoor ski slope facility, a sports hall with four badminton courts, a large gym, two multi-purpose exercise studios, a spin studio, indoor soft play area, new reception area and café.With leisure centres having a high footfall and being a naturally noisy environment, it was paramount to consider the fire safety and acoustics of the building.  Lusso 105FR, a double-glazed fire-rated system, which provides acoustic performance of up to 54dB and fire performance of up to 60 minutes integrity and insulation was the ideal choice for this environment. Lusso Structural Glazing was installed where a higher specification level was required for edge protection.
Sponsored
Chelsea Creek

Chelsea Creek

SELO

Nestled in the heart of Central London, Chelsea Creek stands as an epitome of luxury, offering residents a uniquely European style of living along its canalside homes. The residential development boasts a stunning location characterized by tree-lined avenues and meandering waterways, providing an exquisite urban lifestyle.In our collaboration with Chelsea Creek, our focus was on enhancing both safety and aesthetics within the residential spaces. A key component of this project was the installation of metal riser doors tailored to meet the project’s exacting standards for both functionality and aesthetics. Designed to seamlessly integrate with the sophisticated surroundings, these fire-rated riser doors ensure compliance with safety standards while preserving the high-end residential atmosphere.The choice of metal riser doors not only aligns with the upscale environment of Chelsea Creek but also serves a crucial functional purpose. Ensuring fire safety without compromising on the luxurious aesthetics of the development, these doors exemplify our commitment to delivering solutions that prioritize both form and function. Crafted for both durability and visual appeal, these fire-rated doors not only ensure safety compliance but also contribute to the overall sophisticated aesthetic of Chelsea Creek.
Sponsored
Dormy House Hotel - The House Spa

Dormy House Hotel - The House Spa

Sauna360 Ltd

Sauna360 are pleased to announce the completion of the House Spa at the prestigious Dormy House development designed by award winning Spa designers Sparcstudio. With its rural charm accompanied by lashings of Luxury, this Spa experience offers Juniper Sauna, Steam Room, Rasul, Lavender Room and Ice feature.
Sponsored
Decking & Balustrade Install at Kensington Aldridge Academy, London

Decking & Balustrade Install at Kensington Aldridge Academy, London

AliDeck

D1 Decking Solutions recently completed the remediation of Kensington Aldridge Academy’s terrace deck and balustrades, using the AliDeck Senior Ridged Board and AliRail Plate Fix systems. The transformation has created a fire-safe and futureproof environment.Recent years have seen a stringent review of current building regulations led by drastic changes outlined in BS 8579:2020, a welcome step forward in improving the fire safety of thousands of buildings across the UK.After careful consideration, AliDeck aluminium decking and AliRail balustrades were specified to ensure project success was achieved. Our products offer complete Aluminium balcony, terrace, and walkway solutions.
Sponsored
Aluminium Solar Shading at Upton Gardens

Aluminium Solar Shading at Upton Gardens

Dales Fabrications Ltd - Aluminium Eaves Products

Location: Upton Park, Green Street, London E13 9AXProject type: ResidentialProducts: Rainscreen PanelsSolar shading/Brise SoleilFinish: RAL 7031 MattProducts: Weatherstruck Coping SystemFinish: RAL 7006 SatinSatin RAL 7030 SatinRAL 7031 Matt Products: Kwikfix Soffit PlanksFinish: RAL 7030 MattFire Rating: A2 s1, d0 Non-combustible (Reaction to Fire EN BS 13501-1:2018)Architect: Goddard Manton PartnershipMain Contractor: Barratt Developments PLC (East London) Sub contractor: G.K. Engineering & Design Ltd  Photography: a2n
Sponsored
Faceted Verge Raking Soffit at Bremont Watches HQ

Faceted Verge Raking Soffit at Bremont Watches HQ

Dales Fabrications Ltd - Aluminium Eaves Products

Project type: Commercial Location: Bremont Watches Headquarters, Sheephouse Farm, Oxfordshire, RG9 4JF Product: Highline Gutter Finish: Syntha Pulvin RAL 9006 Matt White Aluminium Product: Meridian Coping System Finish: Syntha Pulvin RAL 9006 Matt White Aluminium Product: Faceted Verge Raking Soffit Finish: Syntha Pulvin RAL 9006 Matt White Aluminium Fire Rating: A2 s1, d0 Non-combustible (Reaction to Fire EN BS 13501-1:2018) Client: Bremont Watches Architect: Spratley & Partners Contractor: A&H Construction Sub Contractor: Vertec Roofing & Cladding Ltd
Sponsored
Wood Wharf B2, Canary Wharf

Wood Wharf B2, Canary Wharf

OBEX Protection Ltd

Location: Canary Wharf, LondonMain Contractor: Canary Wharf Contractors LtdWood Wharf B2 is a modular construction project located on the edge of Blackwall Basin, Canary Wharf.All 279 serviced apartments were manufactured at their specialist construction site, fitted with kitchens and bathrooms and even furniture — before being transported to the site and craned into position.OBEX supplied fire-classified membranes that have been developed specifically for modular construction, including the 0400FR Class B Modular Roofing Membrane, as well as the 0223FR Class A2/W2 Breather Membrane.Storeys: 21Apartments: 279OBEX Fire-Rated products required: 4
Sponsored
Metal pipe boxing protects sprinkler pipework

Metal pipe boxing protects sprinkler pipework

Pendock

Metal pipe boxing from the Pendock Profiles range is being used at a London tower block to conceal and protect fire sprinkler pipework, cabling and other services as part of a fire safety upgrade and refurbishment programme.Bespoke manufactured to the exact dimensions and project requirements, the metal boxing is non-combustible, which makes it suitable for use in public areas, such as lift lobbies, landings and corridors, where no sprinkler heads are present.Finished in white PPC, the metal pipe boxing not only improves the overall aesthetics, but also provides durable protection for pipework and services, while the integrated hinged inspection panels allow easy access for routine checks and maintenance.
Sponsored
Steeldor: Net Services, Isle of Scalpay

Steeldor: Net Services, Isle of Scalpay

Strongdor Limited

April 2017 and the future looked bleak for a fire-engulfed net repair factory on the small island of Scalpay. Fire crews from Scalpay, Tarbert, Leverburgh and Stornaway rushed to the scene, as the massive blaze took hold of the facility and the roof looked in danger of collapse. They deployed high pressure hoses to douse the conflagration.Opened in 2008, the factory employed 14 staff and had been used to clean, repair and apply treatment to salmon farming nets. The Norwegian owned operators of the Net Services Scotland site faced an uphill struggle to get the site back up and running again. Hampered by the remote location of the Outer Hebrides and its distance from the mainland.
Sponsored
Nottingham E-Sports Competitors Protected By FIREFLY® Barriers

Nottingham E-Sports Competitors Protected By FIREFLY® Barriers

FIREFLY™ TBA

While concrete walls and Armco barriers are conventionally used to help protect drivers and spectators at motor racing circuits around the world, products from the range of FIREFLY have been specified to provide the necessary fire protection periods within an East Midlands venue which has become a focus for E-sports enthusiasts in the UK.The work at The Metronome in Nottingham is being carried out by one of FIREFLY’s approved installers on behalf of the venue’s operator, Confetti Media and is making extensive use of the manufacturer’s FIREFLY Zeus Lite 90:30 barrier, along with the Collaroll product to create compartmentation throughout a basement area, and as parts of The Metronome are also used by Nottingham Trent University and its students as a recording and production studio, Krasi Fire Protection Ltd.’s contract is in fact being phased – with work due to complete to work around the academic year. The Contract Manager for Krasi Fire Protection Limited, Daniel Oldacre, commented: “We began using the FIREFLY barriers a couple of years ago instead of mineral wool based systems and have been getting very good training, specification and on-site support from the company. In the case of the contact here for the company which operates The Metronome, we put forward the FIREFLY Zeus Lite 90:30 as the best product to create the necessary fire barriers as part of a major refurbishment and FIREFLY’s Technical Manager, Dave Allen, assisted in supplying the necessary compliant details.  He is also attending site regularly to carry out the required inspections. It is quite a large and complex contract during which we will be installing barrier across the soffits and walls as well as protecting services such as ductwork.  While some of the spaces are confined, FIREFLY is easy to cut and fix in place and saves us a lot of time compared to conventional systems and although we are not installing horizontally here, we did have all 10 of our operatives trained up on FIREFLY’s Horizontal systems as part of the annual update on installation of the systems.”  FIREFLY Zeus Lite is ideally suited to this type of application, comprising a flexible woven fabric fire barrier that has been specifically developed for the vertical separation and compartmentation  of extensive concealed spaces within buildings.By offering 90 minutes integrity and 30 minutes insulation, FIREFLY Zeus Lite 90:30 exceeds the minimum requirements regarding fire barriers under the Building Regulations’ Approved Document B (Fire Safety).  The specially treated glass fibre fabric is strong and resilient as well as flexible while, crucially, the system’s certification covers the inclusion of service penetrations which some products do not. Manufactured from woven and non-woven glass, the FIREFLY range is designed to optimise resistance to flame and smoke as well as offer heat protection in a wide range of scenarios.  The barriers are easy to install horizontally or vertically using a full selection of FIREFLY ancillary products to ensure a fully tested and certified installed system.Images shown are taken during installation and some sections of the installation might be incomplete.
Sponsored
N V Buildings, Salford

N V Buildings, Salford

K Systems Insulated Facades

NV Buildings is one of the most prestigious and iconic residential sites in Greater Manchester.The distinctive sail-shaped buildings are a major landmark in Salford Quays. The blocks have a curved main elevation providing a unique aesthetic on the skyline and are one of the most popular developments in the area.With a prominent location in Salford Quays, adjacent to the Lowry Theatre and Media City TV headquarters, the apartment blocks feature in many iconic photos of the area.The project itself was funded by the Building Safety Fund, the Government’s £4.5 billion fund to remove unsafe non-ACM cladding on residential and mixed-use properties that are 18 metres and over and do not meet building safety regulations.Our Approved Installer QFF Facades were contracted to complete the exterior wall insulation and rendering which upgraded the fire performance of the cladding, ensuring the safety of both the building and residents.Three 15 storey blocks were refurbished, with a safe and thermally efficient façade solution.Our ServiceWe worked in close partnership with QFF Facades throughout the duration of the project.Deliveries and install were strictly monitored and a very systematic approach was followed. A planned install programme was agreed to ensure minimal disruption to the residents of N V Buildings, who remained in their homes while the work was carried out on this prestigious site.We produced a bespoke specification which included various detailing such as soffits, balconies, and full height panels.A partnership approach was vital, as we worked with QFF Facades, Thomasons Consulting engineering, and the fire officer to agree upon and deliver specific detailing at abutments, openings, and for the drained cavity of the façade system.Particular attention to detail was afforded to the drained cavity fire-stops, including fire-stop details between floors, at party walls for each apartment and around openings.As part of our service commitment, our technical team were available to provide hands-on-guidance, offer support, technical guidance and ensure high levels of quality.Technical Project DetailsAfter testing, the existing cladding had been deemed a fire safety risk by experts and therefore needed to be removed and replaced with anon-combustible alternative.The project was a strip-and-refit of a drained cavity external wall insulation system, which included an expanded polystyrene insulation system.Our Approved Installer QFF Facades installed a K Systems Exicco M, Drained Cavity External Wall Insulation System for steel frame buildings, utilising Mineral Wool insulation. This high performing system provides high levels of fire resistance and non-combustibility.The fire classification of the façade for N V Buildings was upgraded to A2-s1, d0 and therefore complies with the latest building regulations, ensuring the safety of its residents.For the finish, high-performance thin coat silicone render (Silicone TC) was specified. Our Silicone TC render has a number of fantastic advantages including ease of application, and its hydrophobic properties make the render low maintenance. Available in a wide range of colours the topcoat finish used on NV Buildings is a light grey to match the original façade, meaning aesthetically the iconic buildings maintained their distinctive design.
Sponsored
AliDeck visit fantastic aluminium terrace decking installation at timber replacement project in London

AliDeck visit fantastic aluminium terrace decking installation at timber replacement project in London

AliDeck

Installed by AliDeck Approved Installer, Alu-Installations, this terrace decking project used our 30mm Senior Flat Board to deliver a slip and fire-resistant deck to replace the existing timber.
Sponsored
Future-proofing University of Bedfordshire’s Luton Campus

Future-proofing University of Bedfordshire’s Luton Campus

Rockpanel

The University of Bedfordshire’s Luton Campus has been completely re-dressed in a stunning mix of Rockpanel External facades, providing beautiful, fire-safe, future proof accommodation for thousands of students.
Sponsored
Newfoundland Tower, Canary Wharf - Alumasc Harmer SML & Wade Gullies & Linear

Newfoundland Tower, Canary Wharf - Alumasc Harmer SML & Wade Gullies & Linear

Alumasc Water Management Solutions

Two renowned Alumasc brands, Harmer and Wade, were recently specified and installed for a new striking residential development in London.Newfoundland Tower, also known as “The Diamond Tower”, due to its unique diamond shape and diagonal structure, is a build-to-rent development in Canary Wharf, London. Harmer SML Cast Iron above ground, and Wade gulliesand linear drainagewere installed to provide an effective water management solution.The Harmer SML lightweight cast iron pipework system is dry-jointed, BBA & Kitemark certified, and has a proven track record in above-ground drainage. With its comprehensive range of fittings and accessories, Harmer SML is the ideal soil and waste system for above and below-ground drainage, including rainwater installations, and is fully compatible with other Harmer and Wade drainage products.“Harmer was chosen primarily for its longevity,” said Gary Zumeris - Area Sales Manager – Harmer SML, South. “It’s also easy to install and has excellent acoustic qualities. It’s a very quiet system, which is especially good in apartments or other high-density housing as you can’t hear fluids flowing down the pipes.“The Harmer system was also chosen for its fire-resistant properties, which is an important aspect, due to current legislation. Cast iron is highly specified in London currently, where most buildings incorporate cast iron for increased fire safety.”Harmer SML has the highest product reaction to fire classification possible, which is A1 for BS EN 13501-1, as well as a system fire classification of A2 for BS EN 13823 Single Burning Item A2, s1-d0.
Sponsored
BP4, 25 CHURCHILL PLACE

BP4, 25 CHURCHILL PLACE

Baldwin Boxall Communications Ltd

25 Churchill Place is a 23 storey commercial office tower in Canary Wharf, London. The tower includes 20 floors of high quality (Grade A) office space and is one of the most energy efficient office buildings in the area. Environmental features include lifts that store energy that is re-used elsewhere in the building, and also a highly efficient air conditioning system.Standing at 130m tall, 25 Churchill Place has a VIGIL2 EVAS voice alarm system and an Omnicare EVC system installed.Initially the voice alarm system was installed to service the ‘shell and core’ of the building, with the system racks being designed and built to enable the fitting of ‘tenant’ functionality as and when required. This process is easily achieved due to the modular design of a VIGIL voice alarm system and is a frequently used benefit for ‘new builds’.For the disabled refuge and fire telephone system (EVC), the loop wired Omnicare system was chosen. Canary Wharf Contractors (landlord of BP4) opted for the dual coloured combined fire telephone (red)/disabled refuge (green) outstation which provides users with a choice of communication method.Both systems were designed and installed by Global Fire & Security Systems - one of our Gold Account achievers. Commenting on the installation, Stuart Beeley, Operations Director, Global Fire & Security Systems, said “We have worked closely with Canary Wharf Contractors and Baldwin Boxall on many great projects, and BP4 is another one to add to that list. We choose Baldwin Boxall systems, not only because we know them to be well built and reliable, but because of the support we receive from the company - at all levels.”
Sponsored
Dubai Metro Insulated Shutters

Dubai Metro Insulated Shutters

Hart Door Systems Ltd

AboutThe Dubai Metro Red Line, at 52.1 km (32.4 mi), is the world’s longest driverless single metro line. The planning of the metro was in response to a rapidly growing population and severe traffic congestion to relieve motor traffic and provide infrastructure for development.Project/doors200 Insulated Roller Shutters, both fire rated and non-fire ratedThe ChallengeThe Hart contract to manufacture over 200 industrial roller shutters to Dubai Metro, one of the most advanced urban rail systems in the world, was secured through the Al-Futtaim Group, who in turn were awarded by Chadwick Technology Group. Hart not only manufactured the doors but provided training to JT Metro JV, Dubai Metro Project.The SolutionManufacture over 200 Insulated Roller Shutters, both fire rated and non-fire rated for the Jebel Ali, Rashidiya and Al Qusais train depots. The shutters are designed to work in very sophisticated and complex systems including depot protection when driver-less trains are in operation.The SuccessThis was Harts largest export order to date and came on the back of large orders for Hart products for Heathrow’s T5 and the international railway terminal at St. Pancras. Once again Hart successfully delivered on a large scale project due to the engineering knowledge and project management experience.The ReviewYou have shown a high level of technical competence and professionalism in dealing firstly with the lengthy approval process, mainly due to the critical importance of the shutters for the automated operation of the Metro system, and secondly with the various site issues that invariably arrive on a project of this scale and fast track nature. Peter W. Mansell, Project Director, Chadwick SEC
Sponsored
Ray Dolby Centre for Cambridge University's Physics Department

Ray Dolby Centre for Cambridge University's Physics Department

Norwood Group Limited

PROJECT OVERVIEW Named after Ray Dolby, a PhD alumnus of Cambridge University, former fellow of Pembroke College, inventor and founder of Dolby, the a/v company, the new facility was designed in Revit by nbbj and is being delivered in BIM by Bouygues UK. Co-funded by Dolby, it will create a centre for innovation, bringing together the academic and research capabilities of the university’s physics department with private sector R&D projects.OUR SCOPE WORK Norwood is delivering a £1.9 million package that includes custom-design, manufacture and installation of the £200K, 2.85m high fire-rated glazed wall. The company’s remit also includes a 2500m2 walk-on ceiling with a 100kg/1200mm2 load capacity to enable ease of maintenance. Norwood is also responsible for design, manufacture and installation of a cleanroom partitioning system totalling 4080m2. For this element of the project, the Norwood team designed a bespoke version of the company’s standard 1000mm modular cleanroom partitioning system to meet the required 1200mm specification, and developed a bespoke T-bolt system to enable customisation of the cleanroom facilities for evolving occupier requirements throughout the lifecycle of the building.The fire-rated glazed wall was designed and manufactured by Norwood and independently tested by UKAS-accredited fire safety services specialist, Warringtonfire, to ensure 60-minute fire integrity and insulation . With each glazed panel weighing 200kg, the installation was meticulously orchestrated by Norwood. The installation will showcase the work being carried out in each of the cleanroom spaces as visitors enter the building via the atrium, with blackout blinds installed to enable any commercially sensitive projects to be hidden from view where required.
Sponsored
Haggerston Community Centre

Haggerston Community Centre

Anderson, GEC Ltd

The Haggerston West & Kingsland development is a residential housing scheme undertaken and operated by the renowned L&Q group. Several blocks of buildings were featured within the project. A community kitchen was included within Block B. Project architects, PRP specified the kitchen to be in stainless steel and GEC Anderson were awarded the task of supplying and installing the required units as well as the various electrical and gas appliances. The fully stainless steel kitchen was laid out in a symmetrical configuration and includes two sink areas, base cabinets, wall cabinets and drawer units. All units were lockable.Other areas of the project were also supplied by GEC Anderson, including the nursery and baby change facilities. 
Sponsored
Queen Elizabeth Hospital

Queen Elizabeth Hospital

Fixfast Ltd

On the roof at the famous Queen Elizabeth Hospital in Woolwich, London; is a very considerable amount of equipment for services such as air-conditioning, electricity, and gas. Specialist contractor Mid Kent Roofing were approached and asked by Vinci Facilities to provide a walkway solution to this need, and the DukMat walkway system was the only option. Supplying more than two kilometres of the walkway system, Fixfast worked closely with Mid Kent Roofing to provide the solution - easy to install and neatly packaged, the DukMat system is second to none."Deliveries were perfect and times adhered to which stopped any traffic flow problems with emergency services also using the same access points as the deliveries"Stave Cayford - Mid Kent Roofing
Sponsored
Car Charging While you Home Bargain; Rolec EV Rolls Out National Public and Fleet EV Charging for UK Retailer

Car Charging While you Home Bargain; Rolec EV Rolls Out National Public and Fleet EV Charging for UK Retailer

Rolec EV

Home Bargains, a leading UK retailer, sought to embrace sustainable infrastructure by introducing EV charging across their UK car park network. Partnering with Rolec EV, a pioneer in EV technology, they installed a mix of 25 AC fast and DC rapid chargepoints across 14 sites, with plans for further expansion. Tailored to meet the needs of both customers and fleet vehicles, the charging network offers bespoke branding and smart back-office management for seamless operation. This initiative not only optimizes fleet charging, reducing downtime, but also contributes to the advancement of the UK's public charging network, promoting the transition to electric vehicles.Click "view more" to read the full case study.
Sponsored
Glazed Roof Hatches -Downtown Doha

Glazed Roof Hatches -Downtown Doha

Surespan

Project:Downtown Doha is a multimillion-pound scheme to regenerate the Downtown Doha district. Surespan supplied a wide number of electrically operated glazed roof hatches along with solid top roof access hatches. Product:Sizes included a 3310 x 1120, 4320 x 1110, 3245 x 760, 1098 x 4330mm and the biggest size came in at 4462 x 6654mm. All the hatches were provided powder coated using the Interpon D series for enhanced durability. In addition, a variety of other products including wall & ceiling access panels were manufactured from Stainless steel. The largest panel was 2700 x 1600mm manufactured as a double door.
Sponsored
Securidor: Roosecote Battery Storage Facility

Securidor: Roosecote Battery Storage Facility

Strongdor Limited

One of the world’s largest battery storage facilities is taking shape on the site of the former power station at Roosecote, near Barrow in Cumbria. Commissioned by Centrica, as part of a £180m investment programme to develop new, flexible power plants across the country, the Roosecote battery storage facility is a state of the art project that will store energy harvested from the grid until needed.With work on the site expected to be completed by the end of 2018, when the facility comes online it will boast the capacity to generate a staggering 49MW. That’s enough electricity to power around 50,000 homes at a very nimble response time of less than a second. Containing approximately 100,000 battery cells, it marks a new era for the energy industry.
Sponsored
Harrison Thompson offer Yeoman Shield Services to Local Hospice

Harrison Thompson offer Yeoman Shield Services to Local Hospice

Yeoman Shield, trading name of Harrison Thompson & Co Ltd

Celebrating 50 years trading this year, as part of their celebrations and charitable activities, Harrison Thompson were pleased to offer their services to their local hospice.The Sue Ryder Wheatfields at Headingley Leeds is a charity run 18-bed hospice, offering the very highest care and services to patients with life-limiting conditions and their families, free of charge.“For our 50th anniversary, we wanted to focus our charity efforts on local organisations.” Explained Harrison Thompson Director, Graeme Brumwell.“Serious illness has touched a number of lives within the company and Wheatfields Hospice has been a facility close to our hearts helping families on these difficult occasions.“It seemed only fitting that we should offer something back for the care that Wheatfield has provided over the years.” Concluded Graeme.Yeoman Shield – the wall and door protection division of Harrison Thompson – got in contact with the Hospice to offer free material and installation for wall and door protection products to be fitted in an area of their choice which was gratefully accepted.2.0mm thick wall protection panels in Cream were fitted to the bedroom walls at the head of beds protecting from marking and damage which can occur from the movement of both the bed and medical equipment.In the corridors, Yeoman Shield’s Fire Rated Door Edge Protectors were fitted to the meeting edge of doors helping to protect from damage and helping to prolong the life of expensive to replace fire doors.The installation of Yeoman Shield will help Wheatfields to keep looking smart and inviting for all those who use the facilities whilst importantly helping to reduce their repair and redecoration cost over the years to come.Sue Waddington, Service Improvement Matron commented “I cannot commend high enough the service that we have received from Yeoman Shield’s contract department.“Due to the nature of our provision of specialist care and services, we had to call on Yeoman Shield at short notice to carry out the work when rooms were available. The installation was undertaken with great empathy and regard for the surroundings.“Now completed the Wall & Door protection looks great and dovetails into our existing décor lovely and gets the hospice well on the way to our forthcoming refurbishment plans for the inpatient unit” Concluded Sue.
Sponsored
Rockfon adds value at new BREEAM Lincoln University Medical School

Rockfon adds value at new BREEAM Lincoln University Medical School

Rockfon

Rockfon was given the opportunity to demonstrate the breadth of its specialist ranges to meet the specific needs of a wide range of spaces while contributing to the BREEAM ‘Excellent’ environmental status of this stunning project.This new five storey medical school enables students to experience real life situations encountered by those in the medical profession. It includes lecture theatres, laboratories, a clinical skills suite with mock consultation rooms to simulate hospital wards or a GP surgery, a pro-section anatomy suite and bio-medical and health sciences library. Professor Mary Stuart was University of Lincoln Vice Chancellor at the time, “It represents more than just a building – it is a commitment to current and future communities in Lincolnshire to develop sustainable healthcare for the region.” HLM were the client architects, ‘The scheme has been modelled to create the optimal sustainable environment through informed decisions on site layout, massing, orientation, building fabric, elevational treatment and Integrated renewable energy systems. To further enhance student mental health and wellbeing, the scheme uses biophilic design principles including natural lighting and ventilation, visual links to natural landscape features and natural materials.’Meeting and exceeding client aspirationsShradha Mishra was Project Manager for the Estates Department at University of Lincoln. At its completion she said, “The Lincoln Medical School… has had a strong focus on sustainability throughout the design and construction process. With this in mind, the strategy for the building required exposed ceilings and therefore it was important to review and manage the acoustic requirements of the spaces to ensure a suitable working and teaching environment. Following extensive design and consultation with acoustic engineers, Rockfon were recommended for installation across the project which included a variety of both suspended ceiling grid tiles and acoustic baffles in open plan areas to support the absorption of sound.”BAM were main contractors for the project with BAM Design leading architectural design. Brebur Limited were responsible for the installation of ceiling and wall systems at Lincoln. Operations Director Vinny Lilley had this to say, “We have an excellent relationship with Rockfon. Their wide range of specialist products always ensures the architectural vision is achieved. They are always on-hand to offer technical advice and commercial acumen, with around 2,500sqm of tile and grid components being supplied by regional distributors.Acoustics reducing stress and enhancing healthAcoustic Rockfon Eclipse® islands are utilised within open plan areas where they are suspended on wires from the soffit, giving the illusion that they float. They can be specified in a variety of shapes with unlimited custom colour matching. Eclipse islands are perfect for thermal mass installations and where a traditional suspended ceiling cannot be installed. At Lincoln they are also present as wall panels to further control sound.Improved acoustics can increase focus by 48% and reduce stress levels by 27%, which aids learning and wellbeing (independent research). The high light reflectance characteristics of Rockfon ceiling and wall systems also help reduce the need for artificial light, saving energy and enhancing health.Elsewhere within the school, Rockfon Blanka® is installed. Available in a wide range of sound control and durability performance characteristics, its non-directional, anti-static surface prolongs product life. The range embodies Class A sound absorption (aw 1.00), 87% light reflection, >99% light diffusion and room to room sound Insulation >26dB. Rockfon’s Chris Carr-Elliman, “All Rockfon ranges are made from inert volcanic rock (stone wool) which offers no sustenance to microorganisms and demonstrates outstanding reaction to fire. Most are available in a full range of formats including concealed, semi-concealed and visible grid options from our extensive Chicago Metallic grid systems.” Specialist ranges for every spaceHTM 60 compliant Rockfon Medicare was the perfect fit at Lincoln where it offers outstanding performance in terms of infection control. Simple cleaning and low particle emission (ISO Class 4) also mark it out as a first choice for healthcare specification, along with its Class A sound absorption and highest fire safety (Class A1). Also within the building, the superior moisture resistant properties and wipe clean surface of Rockfon® Koral™ were important considerations for its use. Affordable, Rockfon® Artic™ was also put to good use in several areas at the school. In common with other Rockfon ranges, both Koral and Artic offer excellent sound absorption and fire safety characteristics.Shradha Mishra continued, “Since completion of the building, we have had positive feedback from building users about both the aesthetic appearance of the Rockfon products along with the acoustic performance of them.” 
Sponsored
HOLIDAY INN FUNCTION SPACE TRANSFORMED WITH STYLE

HOLIDAY INN FUNCTION SPACE TRANSFORMED WITH STYLE

Style - Moveable Partition Specialists

As part of a £2.4m transformation, Style was contracted to deliver flexibility to the ground floor meeting rooms of the Corby Holiday Inn, enabling the space to be quickly adapted to accommodate different functions and therefore maximise revenues. Working with CBP Architects directly with Holiday Inn, Style’s partitioning solution divides a single open-plan space for larger gatherings into two or three separate meetings rooms, using two DORMA Variflex moveable walls. Finished in a stylish antique oak laminate, and providing impressive 52dB Rw acoustics, concurrent events can take place undisturbed and the room can be reconfigured with ease.
Sponsored
Healthcare | The Strand Medical Centre

Healthcare | The Strand Medical Centre

Venesta Washroom Systems Ltd

To make sanitation convenient for the busy doctors and nurses, our conveniently sized, pre-plumbed recessed and boxed-out units, from our Vepps healthcare range were placed in all consultation rooms. “The move into the new building was the biggest event in the Doctors’ Practice for a generation. The selection of Vepps units in the consulting and treatment rooms was an important part of delivering a modern Primary Care Centre, with modern, compliant, spacious, bright and colourful rooms, fit for delivering Primary Care Services for the next generation and beyond.” - David Golland, Project Manager for Strand Medical Centre, Goring-by-Sea, West Sussex
Sponsored
Dorma Variflex glass semi automatic Acoustic moveable wall combines with Dorma Variflex 100 semi-automatic moveable wall to create adaptable space in faith building

Dorma Variflex glass semi automatic Acoustic moveable wall combines with Dorma Variflex 100 semi-automatic moveable wall to create adaptable space in faith building

Style - Moveable Partition Specialists

Chinmaya Mission exists to provide individuals with the wisdom and practical means for personal growth and development, enabling them to become positive contributors to society.  At Chinmaya Kirti, their home in London, a major renovation project was designed as a vision for future generations, rather than just an improved building.Working with architects, KJC, and contractor, Home Republic, Style was specified to be part of that vision, installing moveable walls to enable one large space in the classroom/bookshop area to be easily converted into six multi-functional rooms based on daily requirements. A combination of multiple Dorma Hüppe Variflex Glass and Variflex solid semi-automatic moveable walls were agreed as the best solution, with the glass moveable walls providing a 52dB acoustic barrier and the solid wall 55dB.With a standard anodised aluminium frame finish to the glass walls, and a melamine finish to the solid walls, the final installation provided a light and calm feel to the room design.“This is a great example of how using a combination of glass and solid moveable walls can transform how space is used,” said Michael Porter, sales director for Style South.“The glass moveable walls can combine to create a temporary corridor while the solid moveable walls then segregate the space into smaller individual rooms. Or the Mission can choose a whole range of combinations – from using one glass wall to simply divide the room in two, or to use the walls to provide varying sizes of rooms to suit the requirements of the day.“Such is the quality of the acoustic integrity that multiple events can take place within the segregated rooms without disturbing one another, which was an important factor at the Mission.“By including pass doors also means the moveable walls can remain in place for extended periods and the rooms can be accessed and used with ease.”
Sponsored
Sauna & Steam Suite within a Home Gym

Sauna & Steam Suite within a Home Gym

Sauna360 Ltd

At Sauna360 we were honoured to be asked by a top London architect to co-operate in the installation of a sauna and steam room in a new gym and wellness suite at his Surrey home.The client had seen our design for a large sauna in a Mayfair mansion and the brief was to replicate this to more compact size to create an intimate family cabin.Sauna: The sauna was lined in special cut Blond Aspen contrasting delicate thin wall panelling, with close fitting bench boards and subtly angled furniture. The full width, low iron glass fascia gives a great feeling of space and excellent viewpoint of those still working out in the gym!Steam Room:The steam room was designed to be more discreet and twinned with a matching luxury bathroom. Our proposal was to decorate the room using beautiful Siminetti natural shell mosaic tiles throughout. These tiles with interesting random surface are nonetheless super thin and therefore perfect to suit the many contours usual in steam room design and are both durable and efficient.To complete, we included a matching door to the bathroom with back painted glass and door lock for discretion.The result: a stunning, statement installation in manageable size for regular home use!
Sponsored
Expo 2020 Dubai

Expo 2020 Dubai

Jewers Doors Ltd

Jewers Doors have just completed the installation of sixteen sets of Phoenix Swift bi-folding doors for the newly constructed Fire and Ambulance stations at the $15.5 billion EXPO 2020 Project in Dubai. 
Sponsored
INSTANTA GOES ABOVE AND BEYOND TO MEET LONDON NHS TRUST’S REQUIREMENTS - SUREFLOW TOUCH WALL MOUNTED

INSTANTA GOES ABOVE AND BEYOND TO MEET LONDON NHS TRUST’S REQUIREMENTS - SUREFLOW TOUCH WALL MOUNTED

Zip Water

Demonstrating flexibility and meeting requirements where other manufacturers weren’t able to has seen Instanta products specified at a hospital within the London NHS Trust.Inevitably, patient access to hot water needs careful consideration to ensure any risk of scalding is minimal. A decision was made to ensure water boilers within patient areas have a maximum dispensing temperature of 76°C - lower than the majority of standard water boilers.Not having used Instanta before, but needing a change from the existing supplier that couldn’t offer an adjustable temperature, the technical supervisor researched alternatives and was impressed with Instanta’s wide product range. “On reviewing our existing water boilers, we decided that we needed a product that could actually be modified so its maximum temperature is set at 76°C, an important safety measure for users,” commented the technical supervisor. “We were impressed with Instanta’s range. One of their wall-mounted products was just what we were after, however, its temperature was only adjustable to 80°C.The hospital’s enquiry led to further discussions with Instanta’s operations director and a feasibility study determined that it was indeed possible to modify an existing product; a 6 litre SureFlow Touch Wall Mounted Boiler (WMS6PB) to achieve the facility’s maximum temperature requirement of 76°C.“Instanta’s willingness to help and meet our requirements has been brilliant,” continued the technical supervisor. “As per our request, they made sure the maximum dispensing temperature was set at 76°C. Over the past year we have monitored this closely and we’re pleased to report that it has remained at this temperature, which affords us invaluable peace of mind.” In total, 20 wall-mounted boilers were purchased and placed in areas where patients have access to water heaters.

Showing 721-756 of 1716

Feedback