NBS Source
I'm a manufacturer

"formica"

88 results found

Sort by:

Showing 37-38 of 38

Sponsored
Absorb-R WoodTec Wall Slats at Newcastle University

Absorb-R WoodTec Wall Slats at Newcastle University

Soundis

Flagship of the University’s Science Central site...The building is a living laboratory dedicated to the aim of making urban centres more sustainable for future generations.We were contracted to supply & install various major acoustic elements required on this project. From the get go, our client and architect loved Soundis Absorb-R WoodTec range due to their versatility, and the fact we were able to manufacture the products exactly to the project specific specification. One of the Soundis products from the range were the Absorb-R Micro Perforated Timber Panels which were located and installed on the curved rear wall of the auditorium. The timber core panels were faced with Micro Perforated Formica and the client decided upon the colour red which contrasted the other products within the auditorium tremendously. Another major element of our acoustic package were the Absorb-R WoodTec Grooved Timber Panels which were installed within the main classrooms and smaller teaching spaces to provide excellent working spaces for the students by reducing reverberation times and enhancing the quality of Soundis within the areas. The panels in these areas were RAL painted to the colour chosen by the architect to provide the envisaged aesthetic look and feel of the spaces. Finally Soundis Absorb-R WoodTec Timber slats were installed not only on the walls of the corridors and staircases from ground level all the way to the third floor but they were also used as freestanding dividers in large open atrium and circulation spaces throughout the Learning and Teaching Centre. These timber slats were manufactured the exact specification of what the architect wanted to create a modern but sophisticated look within the newly constructed building. All installation carried out by our installation partner UK Acoustics.
Sponsored
Great Ormond Street Hospital: PAMHS Department

Great Ormond Street Hospital: PAMHS Department

Medspace Solutions

Medspace Solutions was delighted to be awarded the package to redesign and refurbish the Psychological and Mental Health Services (PAMHS) Department on Level 6 of Great Ormond Street Hospital. Great Ormond Street Hospital is a children’s hospital in London and a part of Great Ormond Street Hospital for Children NHS Foundation Trust. The project was installed on behalf of Logan Construction and contained a large amount of bespoke furniture, HTM63 and HTM71 cabinetry and Reception Desks.The Medspace team carried out the design work in March and April of 2023, collaborating closely with Day Architectural and artist Giles Round to ensure the successful integration of design elements. The aim was to create functional, aesthetically pleasing, and therapeutic spaces for mental health services.Patient safety was a primary consideration on this project, with many fixtures incorporating anti-ligature handles and fittings. The installation needed a balance of strength and safety whilst retaining a welcoming and calming environment.A lot of thought had been put into creating the department, geometric shapes and bold colours were particularly important on this project and all play their role to relax and reassure patients. To achieve the artistic vision for this unique project Medspace worked closely with trusted supplier Formica® using their flagship Younique® product. Younique® has allowed Medspace to incorporate patterns directly onto the laminate panels used in the construction of the furniture. This creates a long-lasting hard-wearing surface, resistant to vandalism and colour fade.Another interesting design feature is the backlit cloud panel. Giles Round’s cloud design is featured throughout the department and Medspace incorporated this by fabricating it using translucent Corian® solid surface material. This was then backlit using LED’s creating a soft and relaxing feature in each of the 8 bedroom areas.Installation took place between August and October 2023, and our Furniture, Fixtures and Equipment Package included supplying a functional and stylish reception desk and furnishing and designing the laundry room, kitchen, activity room, bedroom, lounge, study, washroom, dirty utility, teen zone and a quiet space.During the installation, two things were paramount – maintaining cleanliness in a hospital environment and ensuring no patients or their families were disturbed by the work. Our team worked closely with the hospital to ensure there were no issues during the installation period, and we kept disruption to an absolute minimum for everyone, including the staff.The finished design is a massive improvement for the department, and it is now a much more modern department that is fit for purpose and more pleasant for treating the patients who come in.

Showing 37-38 of 38

Feedback