NBS Source
I'm a manufacturer

"lifts"

1,227 results found

Sort by:

Showing 37-72 of 283

Sponsored
Peabody Nods for Stannah Passenger Lifts in St John’s Hill Social Housing Regeneration

Peabody Nods for Stannah Passenger Lifts in St John’s Hill Social Housing Regeneration

Stannah Lifts

Five Xtralifts and two sets of Xtralift duplexes will support access-for-all to 153 apartments ranged over five and seven floors, in two distinct blocks. To match the heavy duty demand of this environment, the nine 8-person lifts are fitted with higher-grade stainless steel lift cars and Dewhurst push-button controls. Eight are traction, without motor rooms, and one is hydraulic, with a motor room. All the lifts have been installed with a range of options, with a mix of vandal-resistant categories 1 and 2. Two models are equipped as firefighter lifts.
Sponsored
Stannah lift products star in spectacular new entrance to Leeds Station

Stannah lift products star in spectacular new entrance to Leeds Station

Stannah Lifts

Opened on 3rd January 2016, the new southern entrance to Leeds Station features four Stannah escalators and two passenger lifts. Following multiple escalator and lift installations at the Midlands hub of Birmingham New Street and Grand Central for Network Rail and Mace, Stannah were again the chosen supplier and installer of all vertical transport within the southern entrance building (known as the LSSE scheme.), this time working with main contractor Carillion to fulfil the brief. The work was completed by the Stannah Escalator & Moving Walkway Department and Stannah Major Projects team in just twelve weeks.
Sponsored
Castle on the Hill Use Gartec Lift for Access to New Exhibition

Castle on the Hill Use Gartec Lift for Access to New Exhibition

Gartec Platform Lifts

Framlingham Castle, an 11th century listed fort nestled in the countryside of Suffolk, has been undergoing key renovations to create a new mezzanine exhibition. The listed building required an access solution, but any works had to protect the building structure. Minimal fixing points and child-friendly key locking made a Gartec 7000 platform lift the perfect solution, and the frosting and logo they added helped to blend it in. “The small size of the Gartec lift and the finishes, including the frosted glass coating we have added, have made it a subtle but modern addition” (Joseph James, Project Manager)
Sponsored
How a Stannah Midilift SL platform lift brings freedom to a designer home

How a Stannah Midilift SL platform lift brings freedom to a designer home

Stannah Lifts

A Stannah Midilift SL vertical platform lift has secured comfortable access throughout a 2-storey, 5-bedroom, detached designer house in leafy Tunbridge Wells in Kent. Bringing easy movement between the ground-floor living area and the lower-ground-floor bedrooms, the Midilift SL is the ideal domestic lift and maintains a discreet, complementary presence in this spacious, two-level designer home, nestling in landscaped grounds.
Sponsored
A Stannah Goods Lift Solves Bike/Bin Storage in City Office Refurb

A Stannah Goods Lift Solves Bike/Bin Storage in City Office Refurb

Stannah Lifts

Where do bikes and bins go in slick commercial buildings in space-strapped cities? A big question answered by a Stannah Goodsmaster 1000 CD Plus goods attendant lift in the revamped Kings House office building in central London. The 1000kg through-car lift moves bicycles and a 1100 litre wheelie bin between the ground floor and the basement storage facility in this extensively reconfigured and refurbished building located on King Street.
Sponsored
END Clothing - Manchester

END Clothing - Manchester

Sheridan Lifts

Glass Lift in luxury fashion retail store in Manchester
Sponsored
Emergency Evacuation Passenger Lift Rebuilds Access in Restoration of the Chapel, Royal Victoria Country Park

Emergency Evacuation Passenger Lift Rebuilds Access in Restoration of the Chapel, Royal Victoria Country Park

Stannah Lifts

Situated in an existing stairwell, the lift had to be installed within Historic England guidelines: the guide brackets could not be fitted to the Chapel’s historic walls, so the lift was supplied and fitted within Stannah’s FX structure—a cost-efficient, shaft-within-a-shaft solution that overcomes such obstacles. This BS 9999-compliant evacuation lift plays a vital role in an evacuation strategy by a designated warden for t
Sponsored
Pendock Linea Range - Lift Reveals

Pendock Linea Range - Lift Reveals

Pendock

Durable and decorative lift reveals, manufactured from stainless steel, aluminium and laminated plywood, provide a practical and aesthetic enhancement to lift installation and refurbishment projects, as well as lift lobby upgrades.Every lift reveal is designed and manufactured by us to meet the exact specifications of each individual project with great attention to the detail, fit and finish of every component.All linings are manufactured to comply with the relevant safety legislation, incorporating safe edges and corner radius detail.
Sponsored
Space-saving Passenger Lift Ups Access in New School Extension

Space-saving Passenger Lift Ups Access in New School Extension

Stannah Lifts

To supply and install a space-saving passenger lift in a new extension to St John The Baptist Primary School in Penistone, a market town and civil parish in South Yorkshire. Completed in 2019, the new building houses supplementary classroom facilities vital for this thriving, voluntary aided C of E school with 548 pupils in the 3-11 age bracket.
Sponsored
Stannah Weaves Tailored Lift Access in UK’s Oldest Silk Mill

Stannah Weaves Tailored Lift Access in UK’s Oldest Silk Mill

Stannah Lifts

A Stannah Platform Lift is weaving tailored access throughout Whitchurch Silk Mill, a Grade II*-listed Georgian working watermill undergoing a £2.1m regeneration into a fully accessible, industrial heritage attraction. Built in 1815 and sited on the River Test near Winchester, Hampshire, this historic mill weaves silk fabrics using 19th-century machinery. One of just four working silk mills in the country, it is the only one open to visitors. As such, accessibility is key to the mill’s ongoing Preserving the Fabric project, a Heritage Lottery Fund scheme focused on the mill’s sustainable future.
Sponsored
Loading bay lift

Loading bay lift

TRANSLYFT UK LIMITED

Loading bay lift for distribution centre
Sponsored
Hornsey Town Hall Redevelopment

Hornsey Town Hall Redevelopment

Sheridan Lifts

9 New Lifts on a Multi-Purpose Conversion Site
Sponsored
Stannah passenger/goods lifts remaster access and goods movement in massive regeneration of EMI’s The Old Vinyl Factory

Stannah passenger/goods lifts remaster access and goods movement in massive regeneration of EMI’s The Old Vinyl Factory

Stannah Lifts

A triplex of customised Stannah lifts are delivering vital office access and goods movement in the Record Store, an Art Deco, former record-pressing factory and part of the £250m regeneration of The Old Vinyl Factory, erstwhile home of record label EMI, in West London. The triplex operates in wall-mounted shafts in the spacious lift lobby, an integral part of the compact, central core. Their design supports an efficient blueprint, also minimising the structural impact on the building. This core also doubles as a fire-fighting shaft, comprising a firefighting stair, mechanically ventilated firefighting lobby and a firefighting lift.
Sponsored
Stannah at Leeds Station Southern Entrance

Stannah at Leeds Station Southern Entrance

Stannah Lifts

The southern entrance to Leeds Station features four Stannah escalators and two passenger lifts. The four escalators provide continuous vertical transportation for ambulant people. Those travellers with heavy luggage, child buggies or wheelchair-users are well provided for with two bespoke 13-person traction passenger lifts located just inside the entrance.
Sponsored
Stannah Passenger Lifts Up Access in Multi Award-winning Listed Conversion

Stannah Passenger Lifts Up Access in Multi Award-winning Listed Conversion

Stannah Lifts

A trio of Stannah Maxilift motor room-less passenger lifts has delivered residential access for all at King Edward VII Estate, West Sussex. Completed in 1906, this Grade II* listed former sanatorium has been renovated and converted into 162 sumptuous apartments, duplexes and communal facilities set within eight acres of Registered Gardens in the South Downs National Park, with full resident access to the 165-acre estate. Original features have been restored, conserved and further enhanced with über-modern updates to include the three Stannah 8-person, motor room-less (MRLi) Maxilifts supplementing stair access over three and five floors.
Sponsored
Stannah future-proofs new homes in the Garden of England

Stannah future-proofs new homes in the Garden of England

Stannah Lifts

Stannah Lifts has supplied and installed (and will maintain) 38 lift products in Imperial Green, a high-specification development of 75, two-, three- and four-bedroom townhouses and apartments in Hythe, a peaceful, coastal market town on the fringe of Romney Marsh. To facilitate luxurious living, and, where applicable, to enable homeowners to stay in their homes for as long as possible, a total of 38 Stannah lift products were supplied and installed: a traction passenger lift, 11 hydraulic platform passenger lifts (home lifts) and 26 dumbwaiters (service lifts). This future-proofing capability helped to secure the contract for Stannah.
Sponsored
Stannah Levelmaster low-rise platform goods lift – solving stock flow in a split-level storeroom

Stannah Levelmaster low-rise platform goods lift – solving stock flow in a split-level storeroom

Stannah Lifts

A Stannah Levelmaster low-rise platform goods lift proved the best solution for shifting boxes in the split-level storeroom of the Bromley outlet of Tiger Stores, a leading Danish retail chain offering a wide range of affordable homeware, toys, stationery, toiletries and accessories.
Sponsored
Hinxton Hall Conference Centre at Wellcome Genome Campus enhances accessibility with Stannah inclined platform lift

Hinxton Hall Conference Centre at Wellcome Genome Campus enhances accessibility with Stannah inclined platform lift

Stannah Lifts

Hinxton Hall Conference Centre is located within the grounds of the Wellcome Genome Campus in Cambridge. Accessibility requirements are constantly being reviewed with a view to enhancing the experience of anyone using the Conference Centre spaces. The latest of these involved the installation of a Stannah CR inclined platform lift in the Francis Crick Auditorium. 
Sponsored
Playing pack horse in top toy store

Playing pack horse in top toy store

Stannah Lifts

It seems that The Entertainer – the biggest independent toy retailer in the UK – cannot get enough of Stannah’s Goodsmaster range of goods lifts. Muscling up all over the UK, Goodsmaster goods lifts have gone into multiple branches of The Entertainer, from Didcot, Lancaster and Newport (Isle of Wight) to Rugby, Cardiff, Chester, Sunderland and Bexleyheath – with another to come in 2013 in Witney, Oxfordshire. The bespoke, hydraulic-drive Goodsmaster 500kg goods lift recently installed in the Bexleyheath outlet demonstrates Stannah’s design flexibility.
Sponsored
Supporting Animal Care in a Yorkshire Vet Practice

Supporting Animal Care in a Yorkshire Vet Practice

Stannah Lifts

The Stannah Midilift SL platform lift was specified by Phil Walker, client agent for Wicstun Veterinary Group: “The new-build practice in Market Weighton needed supplementary access to bring it into line with current access-for-all legislation. Stannah was our first-choice lift company as they are local, which supports our build policy of sourcing local suppliers wherever possible. They are also an established UK company with a lengthy track record—just the reassurance needed that we would get the best lift solution for the job!”
Sponsored
Triton watertight concrete waterproofs lift shafts

Triton watertight concrete waterproofs lift shafts

Triton Systems

Triton Systems approved contractor, British Damp Proofing, installed products supplied by Triton Systems to waterproof two lift shafts in a development of 25 dwellings. Triton Bentonite Membrane was used to waterproof the lift slab base and kicker, which were poured using concrete made waterproof with Triton TT Admix. Triton's Adcor waterbar was then installed on to the kicker.
Sponsored
SLP model D as X-ray platform lift

SLP model D as X-ray platform lift

Guldmann Limited

A version of SLP model D has been developed especially for hospitals, including for use in X-ray departments. This version, called an X-ray platform lift, is built into the floor and can lift the patient up to the correct height for the X-ray machine when, for example, knees or ankles need to be X-rayed. The X-Ray platform lift has support rails that make it safe for the patient to stand on the platform. It has a low built-in height, making it easy to install even with different floor levels. The Hospital of South West Jutland in Denmark has installed the X-ray platform lift in its Department of Radiology, where the head radiographer describes what this has meant for the department in its day-to-day work: “The X-ray platform lift makes for a much better work environment. Previously, we had to use portable stairs. The stairs take up a lot of space and patients have difficulty climbing the high steps. It’s also heavy and carries a risk of work-related injuries. With the X-ray platform lift, you can use a remote control to lift the patient up to the correct height to maintain good contact with the patient. In addition to the above the X-ray platform lift is also time-saving, as it’s always ready for use. This is significant given the fact that around 20 patients go through each X-ray room daily
Sponsored
JD Sports, Liverpool One

JD Sports, Liverpool One

Stannah Lifts

On the strength of the successful installation of a Stannah A2S down-escalator in the Slough branch of JD Sports, Stannah were once again approached to quote for their three-storey Liverpudlian store. As a result, two Stannah A2S escalators (one up, one down), an exclusive 8-person Maxilift MXL passenger lift and four 50kg Microlifts, for the transport of smaller merchandise between stock rooms and fitting floors, now provide all people- and goods-moving requirements within this thriving outlet.
Sponsored
Twyford HQ Taken to the Next Level with Gartec

Twyford HQ Taken to the Next Level with Gartec

Gartec Platform Lifts

The high traffic HQ for Interserve required a lift in an awkward stairwell space, to match the contemporary style of the building. A Gartec 7000 passenger platform lift was installed in just 3 days with no building works, with a fully glass shaft. Gartec worked around the glass stairwell, removing panels where required. The small footprint, low cost and simple maintenance made the lift ideal for the location. Sheena, the Office Manager, commented "the install team worked quickly and efficiently... now completed it looks like it has always been there".
Sponsored
Lifting the lid on sensory design

Lifting the lid on sensory design

Geberit Sales Ltd

Awareness of mental and physical wellbeing has never been greater, yet many of us are spending more time than ever online – and it’s taking its toll. Here, Sophie Weston, channel marketing manager at Geberit, lifts the lid on the role that the bathroom has to play in helping us escape from our ‘always-on’ world and examines the importance of considering each of our senses in creating the perfect sanctuary.
Sponsored
Successful Installation of a Home Lift in a Private Home in Johannesburg

Successful Installation of a Home Lift in a Private Home in Johannesburg

Vimec SRL

Vimec, partnered with a trusted local home lift installation specialist to successfully install a home lift with 2 stops in a private home located in Johannesburg, South Africa. The project involved the integration of a white steel structure and a cabin with two glass walls, resulting in a seamless and elegant addition to the homeowner’s residence. This case study highlights how Vimec’s partner effectively addressed the client’s needs and exceeded expectations.
Sponsored
Three reliable heavy goods lifts supporting an experienced transportation company

Three reliable heavy goods lifts supporting an experienced transportation company

Lödige Industries

Resilient, flexible and reliable lift solutions enable logistics services in ZurichIn 2018, Welti-Furrer approached Lödige Industries to install three OLYMPUS heavy goods lifts at their newly build logistics facility in Dielsdorf near Zurich. Logistics service providers and transportation companies are two important service providers across the globe. They ensure that all goods are always reliably and safely in the right place at the right time. Welti-Furrer has been on the road since 1838. As one of the oldest transport companies, Welti-Furrer relies on over 180 years of experience and is therefore very familiar with the central challenges and requirements of lift solutions.Long-term advantages with resilient lift solutionsForklift drivers in logistics centres work highly efficient and at a fast pace. Therefore, it is not possible to completely avoid damage to the facility equipment. However, a large part of the damage can be avoided through intelligent planning of the lift solution. One of the main reasons why Welti-Furrer decided for lift solutions from Lödige Industries is the generic strong resilience of the OLYMPUS heavy goods lift.In addition, other aspects of the lift design were optimised in order to further increase the robustness of the lifts. The wall soffits in the prefabricated concrete shafts were intentionally built smaller than the clear cabin width, thus protecting the whole cabin floor from damage. The outer trays are offset inwards so that they are protected from damage by forklift trucks or similar.Flexible use thanks to integrated card reading systemNext to the resilience of the installed heavy goods lifts, the local service team from Lödige Industries ensures high reliability at any time.Furthermore, in order to maintain the highest flexibility standards, the installed OLYMPUS heavy goods lifts were equipped with an internal card reading system. This functionality allows Welti-Furrer to define individual access rights for their employees.SolutionWelti-Furrer decided for lift solutions from Lödige Industries because of the generic strong resilience of the OLYMPUS heavy goods lift.Several aspects of the lift design, such as the wall soffits and outer trays were optimised in order to further increase the robustness of the lifts.The local service team from Lödige Industries ensures high reliability at any time.The integrated card reading system allows Welti Furrer to define flexibly use the goods lifts.
Sponsored
Stannah - supporting luxurious service in top London events venue

Stannah - supporting luxurious service in top London events venue

Stannah Lifts

A Stannah Maxilift MRLi motor room-less passenger lift and Goodsmaster CD chain drive goods lift are the moving solutions of choice for Meridian Grand, a luxury banqueting, conference and events venue in Edmonton, North London. Both Stannah lifts help Meridian Grand deliver a first class service, whether this is for small, intimate gatherings or large, corporate occasions – from weddings to big-number fund raisers – all in opulent surroundings that are the hallmark of this family run business.
Sponsored
Revving up accessibility in York

Revving up accessibility in York

CIBES Lift UK

Disabled access was the driving force behind a leading motorcycle company’s decision to ramp up facilities at its new showroom. It’s been a year of success for Barrie Robson Motorcycles, a well-known prestige motorcycle dealer and BMW franchise in York. But with a newly-built premises the company needed to ensure that it gave disabled customers and staff top quality access by installing a Cibes UK lift. Kevin Fairburn is manager and joint owner at the dealership that opened its new headquarters a year ago after 30 years in business.
Sponsored
Taking accessibility to the next level at a broadband HQ

Taking accessibility to the next level at a broadband HQ

CIBES Lift UK

Broadband experts have taken accessibility at their Hull HQ to the next level. Cibes Lift UK has installed an A5000 platform lift at KCOM’s head office to allow for disabled access. Lauren Haysom, regional property coordinator at KCOM, says she wouldn’t hesitate to recommend Cibes to those looking to improve accessibility for staff and visitors. She said: “As a company we know it is vitally important that we meet all our employees’ access needs as well as fully complying with regulations surrounding disabled access and Cibes has enabled us to meet those requirements."
Sponsored
A £multi-million revamp at Birmingham New Street

A £multi-million revamp at Birmingham New Street

Stannah Lifts

To help meet the people and goods movement needs throughout the station and the integral Grand Central Birmingham Shopping Centre (formerly the Pallasades), Stannah Escalators & Moving Walkways joined forces with Stannah Major Projects to supply, install and commission 41 lift and escalator products, including bespoke models, to ensure step-free Access for All (AfA) throughout – whilst keeping the station fully operational.
Sponsored
“Oyez! Stannah brings modern access to historic town hall!”

“Oyez! Stannah brings modern access to historic town hall!”

Stannah Lifts

Once again, Stannah has plenty to shout about when it comes to updating access in heritage buildings – with the installation of a Maxilift 2.0 MRL (motor room-less) passenger lift in the historic town hall in King’s Lynn, Norfolk. By bringing access for people of all mobilities to facilities ranged over two floors, this hydraulic, 8-person lift helps the town hall maintain its 800-year history at the heart of civic life.
Sponsored
Lift enables wheelchair users to access Osnabrück registry office

Lift enables wheelchair users to access Osnabrück registry office

Guldmann Limited

The city of Osnabrück has made the entrance to the Weigh House on the market square accessible. The heavy wooden doors now open automatically, and with the help of a platform lift, wheelchair users are now also able to access the room used for wedding ceremonies in the historic building with ease.Remodelling the historic building cost 90,000 euro and took three months to complete. The building (constructed in 1532), which is used by the registry office, is now completely accessible – just in time for wedding season. Over 600 wedding ceremonies are held in the Weigh House each year.“A project close to the heart”A platform lift has been installed, which is not only easy to operate, but also looks elegant. The platform lift can be completely lowered into the floor. A touch of a button is all that’s required to access the foyer via the stairs. The Lord Mayor Wolfgang Griesert describes it as “elegant and discreet”.
Sponsored
Easy installation of goods lift making transport more comfortable for German Wholesaler

Easy installation of goods lift making transport more comfortable for German Wholesaler

Lödige Industries

Lödige installed ESCORTA goods lift in Bad Hersfeld, GermanyAt the end of 2015 a passenger and goods lift was installed for Libri. The customer needed a lift which would enable the transportation of goods and passengers up to 9.5 m with 4 stops. Furthermore, it was required to find a solution to easily install within an existing warehouse. ESCORTA from Lödige was the perfect answer for the customer’s needs and structural requirements. The lift is delivered as a free-standing structure and does not require any pit. Therefore the installation was quick and easy. Additionally thanks to its new certification (European Machinery Directive 2006/42/EG und DIN EN 81-41) multiple persons can now simply ride in the lift with their goods to the desired floor. This increases the level of comfort, making transporting goods between levels much easier and more pleasant.ChallengesA solution was searched to transport goods and passengers at once.A compact solution was needed which did not require a lot of space and could be easily integrated into the existing warehouse.The lift had to meet individual needs of customers referring to the structural conditions in the warehouse.Solution and benefitsESCORTA goods only lift from Lödige does not require any pit and is delivered as a free-standing lift structure, thus it was easily installed into the already existing warehouse.The lift was offered as a tailored made product – exactly meeting the requirements of the customer.In the ESCORTA goods lift multiple persons can ride with their goods to the desired floor level.
Sponsored
Stannah – taking the legwork out of shopping in Sainsbury’s

Stannah – taking the legwork out of shopping in Sainsbury’s

Stannah Lifts

Apair of Stannah moving walkways has taken the legwork out of shopping in the brand new branch of Sainsbury’s in Leigh, Lancashire. The moving walkways operate between the ground-floor entrance area and food hall and first-floor clothing, café, pharmacy and click and collect. They deliver secure, efficient movement for shoppers and their trolleys over a vertical rise of 4250mm at a 10o angle, and at rated speed of 0.5ms. For those unable to use the walkways, store access is further complemented by a passenger lift.
Sponsored
Concrete Reception Desk at Lift 109, Battersea

Concrete Reception Desk at Lift 109, Battersea

LIVING CONCRETE LTD

The Lift 109 viewpoint designed by Ralph Appelbaum Associates has opened within the rebuilt chimney of Battersea Power Station in London. We manufactured and installed a concrete reception desk for the Lift 109 Experience reception area which is located in the Power Station’s magnificent Art Deco Turbine Hall A.Living Concrete team used an innovative concrete application technique to create custom-built reception desk for our client Beck Interiors. MicroConcrete fluted tiles in Willow Green colour were cladded onto MDF frame, seamlessly achieving a very complex and detailed design. Hand cast and hand polished oval shape concrete worktops in Ivory were assembled onsite. By using the best of modern technology, we have created a modern and robust design that demonstrates how concrete can be both good looking and functional.

Showing 37-72 of 283

Feedback