NBS Source
I'm a manufacturer

"mains gas fittings"

3,111 results found

Sort by:

Showing 613-648 of 1080

Sponsored
PATTRESS PLUS makes PATTRESS installation faster and safer at Queensferry High

PATTRESS PLUS makes PATTRESS installation faster and safer at Queensferry High

MEDITE SMARTPLY

A newly built Queensferry High School in Edinburgh, replacing the one currently in use, has had its internal fit-out completed ahead of schedule after the project was speeded up through the use of SMARTPLY PATTRESS PLUS.
Sponsored
McDonald's Tiling Refit for UK Restaurants

McDonald's Tiling Refit for UK Restaurants

Ardex UK Ltd – High Performance Flooring, Tiling, Screeding and Building Products

A huge tiling re-fit of all UK restaurants over a 5 year program. The successful partnership approach produced the ideal  tile fixing recommendation, which is now being rolled out to McDonald’s branches around the world.
Sponsored
Soundis Dry Screed Acoustic Flooring with Wood Fibre Resilient Layer at McMillan House, Cheam Common Road, Worcester

Soundis Dry Screed Acoustic Flooring with Wood Fibre Resilient Layer at McMillan House, Cheam Common Road, Worcester

Soundis

McMillan House is a first class development providing luxury rental apartments to young professions in the local area of KT4. Built in 1950 it had been used as an office building for over 50 years. Now delicately restored, McMillan House will provide 46 luxury 1, 2 and 3 bedroom rental apartments upgraded to the highest standards.After the main contractor won the project, we were requested to propose an acoustic solution that would comply with Building Regulations. As part of this 2,115m2 luxury conversion, the Soundis dryscreed board with a resilient layer of wood fibre was selected, this is a high quality, interlocking dry floor screed system using gypsum fibreboard technology.This system, was selected due to its high thermal conductivity allowing for the use of the proposed underfloor heating systems throughout the flats, but also for its main purpose of Meeting Regulations, where it’s incorporated Wood Fibre Resilient Layer effectively reduces impact sound transmission from footfall. As traffic can be taken immediately once the glue had hardened, on the low installation thickness acoustic board.
Sponsored
The Anchorage Gateway, Salford Quays

The Anchorage Gateway, Salford Quays

URSA UK LTD

The Anchorage Gateway in Salford Quays is a new multi-storey building in the centre of Salford. The main wing is 29 storeys high whilst the lower tower tops out at 19 storeys. The ground floor contains almost 400m2 of commercial space and the upper floors contain 290 residential units and 800m2 of amenity space.The building is reputed to be one of the highest brick clad buildings in Europe, Kinlan Brickwork being specialist sub-contractor.Domis Construction is the main contractor on this scheme. URSA UK Ltd was chosen as the preferred insulation manufacturer. We supplied over 11,500m2 of 100mm URSAPAN BLACK - a unique glass mineral wool rainscreen cladding insulation slab;·      Euroclass A1 fire rating (non-combustible).·      Thermal conductivity of 0.035 W/mK.·      BBA Certified. Kate Fox, Area Sales Manager for the Midlands stated, ‘Following the success of this initial partnership URSA are now the preferred supplier of rainscreen insulation and our products have been used on Fifty5ive Queen Street in Salford with others in the pipeline including Derwent Street’.
Sponsored
Oasis-Academy

Oasis-Academy

VELUX Commercial

The VELUX Daylight Visualizer enlightens a new-build school academyA new school building project was commissioned with a clear design vision—deliver an exceptional learning facility to best serve pupils and the community.The school design is a steel-framed superblock with a compacted floorplate and accommodating spaces spread over four floors. In the main building, classrooms benefit from daylight provided through vertical glazing. Larger communal spaces such as the main hall, internal corridors, a dining room, and drama studio can be found in the heart of the building. Daylight in these communal spaces is provided through the roof.  Activity spaces such as the sports hall, a gym and library required specific daylight levels to comply with the Department for Education (DfE) output specification requirements. Deep-plan, central locations also required a calculated daylight design, prompting Pozzoni Architects to invite VELUX Commercial to collaborate on the project and assist with the evaluation of daylight provision.To read more about this case study and how understanding daylight analysis simplifies complex design goals, visit our website.
Sponsored
Orbis OS211 Glass Balustrades for Birkenhead Community Fire Station

Orbis OS211 Glass Balustrades for Birkenhead Community Fire Station

Delta Balustrades Ltd

Orbis OS211 Glass Infill Top FixThe Birkenhead Community Fire Station was completed in 2013, as part of the North West Fire PFI scheme, a framework of 16 fire stations across North West England. The client’s main objectives were to provide a safe and healthy environment with improved facilities for firefighters and other personnel.Following demolition of the existing fire station, the design and construction of this multi-appliance station, led by Balfour Beatty Construction, included community orientated facilities, training facilities, rest rooms, additional office space and two communal staircases. At early design stages, Delta Balustrades worked closely with Balfour Beatty to meet the client’s objectives of creating well designed facilities to a high architectural standard. The Orbis system was chosen as a cost-effective, high-quality tubular balustrade solution for both staircases.The main stair boasted a brushed stainless steel finish with unique Banjo glass fixings. Savings were made on the rear stairs by selecting powder coated uprights and D type glass fixings.
Sponsored
New Scotland Yard

New Scotland Yard

Acoustic Products Ltd

This Laudescher LINEA Bespoke 2.4.3 acoustic slatted panels with the purpose of managing the reflective nature of the walls within the main entrance area. The extremely specific design of the ceiling panels here where each slat cut from a glulam block so as to achieve a curve that is not stressed. The same product is used inside and outside so as to achieve a seamless finish through the glass.
Sponsored
Seven Sisters Country Park Case Study

Seven Sisters Country Park Case Study

Astor Bannerman

In July 2021 the South Downs National Park Authority became owners of Seven Sisters Country Park. One of their main focuses was creating better experiences for visitors. As part of that process the visitor centre was recently redeveloped, ensuring it was more accessible, with same level access and new toilets. To improve accessibility yet further, the team decided to install a Changing Places Toilet.
Sponsored
St Barts, Ward Kitchen

St Barts, Ward Kitchen

Anderson, GEC Ltd

A full stainless steel ward kitchen was provided by GEC Anderson in the Royal London Hospital, part of the Barts NHS Trust.Working with main contractor, John Sisk & Son, GEC Anderson supplied the entire kitchen, comprising sinks and worktops, stainless steel legs and supports, base cabinets and wall cabinets. Some of the units were mobile (on castors) to facilitate cleaning.
Sponsored
Oxford Biochemistry – Phase Two

Oxford Biochemistry – Phase Two

Sika Limited

With an acclaimed biochemistry building constructed in 2008, the University of Oxford appointed main contractor, Laing O’Rourke, to build the £73m phase two expansion of the facility.The institution required extra space for the faculty and the new building would house very specialised equipment.With respect to a partnership agreement with the University of Oxford spanning 20 years, it was important for Laing O’Rourke to select the right partner for the project.
Sponsored
Conninbrook Lakes

Conninbrook Lakes

RCM - Roofing and Cladding Materials Ltd

A major development has seen the creation of some 300 contemporary new homes in the heart of a country park in Kent. The Conningbrook Lakes scheme was built by the Chartway group, a leading Kent based developer, with GDM Architects responsible for the main design. RCM were asked to supply their Supertech Weatherboard for the exterior of the different types of houses, ensuring an individual finish for the different house types.
Sponsored
Offices & Retail Space, Birmingham

Offices & Retail Space, Birmingham

Nullifire – a brand of Tremco CPG UK Ltd

Using products like FB750 (Intubatt) and FS702 (Intumastic) – the striking new development allowed for GRJ Contracting to use the complete passive fire protection offering from Nullifire. A representative at GRJ Contracting commented, “All products and services provide by Nullifire during this project were brilliant and allowed us to provide the highest standard of fire protection required by the main contractor.”
Sponsored
INTU car park living walls and green infrastructure, Milton Keynes

INTU car park living walls and green infrastructure, Milton Keynes

Biotecture Limited

INTU worked with Makers Construction on a full car park refurbishment for the main car park at their Milton Keynes location. As well as improving traffic flow through the car park, creating larger spaces and better way finding, intu was keen to install several areas of living wall and car park green infrastructure to provide a stunning visual welcome to all visitors.
Sponsored
Tower Wharf Liverpool - solar shading

Tower Wharf Liverpool - solar shading

Duco Ventilation & Sun Control NV

One of the main aims of the project was to future proof and increase the functionality of the building, with high sustainability standards including onPatient comfort was understandably a key part of the design, Contrasol installed the DucoSun Cubic 300 louvres to provide the solar shading required to achieve a comfortable internal environment. The added benefit of the projecting system is that it allows clear views of the surrounding grounds and across the Firth of Forth.
Sponsored
Playtime at the Ronald McDonald House

Playtime at the Ronald McDonald House

Formica Group

The Ronald McDonald House charity provides free 'home away from home' accommodation to families while their child is in hospital and often offers places for the children to play with custom made play areas. In 2018, the Leiden house opened the new play area next to the LUMC hospital, which features furniture fabricated using Formica Laminate from the main collection.
Sponsored
Pencoedtre High School

Pencoedtre High School

Gerflor Flooring UK Limited

Pencoedtre High School is a large new build high school in Barry, Wales. When this busy school required a brand-new world class flooring surface for its main indoor sports hall, they simply wanted only the best! HLM Architects would specify 700m2 of Taraflex® vinyl sports flooring in ‘Maple’, from international flooring specialists Gerflor.
Sponsored
Amson Solutions Install AliDeck Aluminium Decking & AliClad Soffit Solutions at Southsea Development, in Partnership with Cox Design

Amson Solutions Install AliDeck Aluminium Decking & AliClad Soffit Solutions at Southsea Development, in Partnership with Cox Design

AliDeck

The balconies at the Southsea development were targeted for an extensive overhaul, incorporating AliDeck’s Senior Board in Textured Silver Grey alongside the AliClad Flow soffit cladding system, complete with an Extended Gutter. Leading the project as the main contractor, McCarthy & Stone launched a significant six-phase renovation, with Amson Solutions delivering the installation across Phase 1 for our client, Cox Design.
Sponsored
Coverys

Coverys

Optima

At Coverys new headquarters, a stunning array of design elements make this fit-out an undeniable success. Employees work in peace and quiet whenever needed due to the acoustic laminated glass in the Revolution 54 Plus partitions and Edge Affinity doors.
Sponsored
Withersworldwide

Withersworldwide

Optima

We were happy to work with KKS and ISG on the design and creation of these new spaces. A range of glass partitions for agile working achieved a stunning interior, fit for purpose. Also the design created a BREEAM excellent rating proving it’s sustainability credentials.
Sponsored
New Teaching Lab Sinks Make The Grade

New Teaching Lab Sinks Make The Grade

Anderson, GEC Ltd

A large number of Decimetric modular stainless steel sinks, from GEC Anderson, were specified for the Environmental Science Laboratory at The University of Liverpools new Central Teaching Laboratories (CTL) for the Faculty of Science and Engineering. The specification called for a high performance and durable solution that was easy to maintain.Decimetric sinks provide a flexible and versatile framework of sizes in 100mm x 100mm increments so as to enable versatility and easy specification. This particular project required large double sink bowls (400 x 400 x 250m deep) set in 1400 x 600mm tops. Each sink was fitted with GEC Anderson V220 Sand Traps to collect solids and to prevent blockages.The bulk of the sinktops were installed on the first floor Environmental Science Laboratory situated in the East Wing. They run the full length of the windowed wall and provide washing facilities for 170 individual work stations.The client demanded high specification of internal fittings and a high concentration of laboratory fittings which would endure heavy usage during their life time. Hard wearing and highly functional, the professional grade brushed satin stainless steel tops provide a long life with very low maintenance. Torsten Bauszus from ADP LLP Architects said, GECA were chosen for their ability to provide modular, professional grade stainless steel tops with no joints at the sink which will make them very easy to clean and maintain.
Sponsored
New Traditional Windows and Doors in South West London

New Traditional Windows and Doors in South West London

The Sash Window Workshop

At The Sash Window Workshop we have been replacing and renovating timber windows and doors for various properties across London and the South for over 25 years.We were approached by an interior contracting company who were looking to replace the timber windows and doors for a property in South West London.The company requested new windows and doors which fitted the following specification:New traditional windows to match the existing style and be period appropriate;The highest possible thermal and acoustic performance;The maximum amount of light transmission possible through the glass;Bespoke window ironmongery;Painted internally to meet the customer’s specific paint colour requirements.Upon receiving the request for a quotation, one of our trained surveyors met with the architect for the project to discuss their requirements and advise how we could help. In total they required over 20 new sash windows and timber casement windows, and 4 new external wooden doors.As all of the new windows and doors that we manufacture are bespoke, we were able to ensure that their replacement windows and doors exactly matched the original designs, meaning that they fitted in with the surrounding properties and retained the aesthetic look and feel of the property.Due to the location of the property, all the new windows had to be carried up through the property by our experienced installers to be fitted.Both the customer and contractors were very happy with the work carried out, which helped transform the property into a beautiful home.
Sponsored
A complete KEUCO bathroom in a designer hotel

A complete KEUCO bathroom in a designer hotel

KEUCO

The custom-made KEUCO washbasin board with truffle-coloured glass has a cleaning-friendly finish and offers ample space for setting things down. With their slender exteriors, the EDITION 400 two-handle fittings look like sculptures soaring over the ceramic washbasins. The continuous LED lighting of the matching light mirror extends over the complete wash area, brightening the room. And for a closer look, the illuminated iLook_move LED cosmetic mirror offers the guest five-fold magnification. The flexible swiveling arm means the mirror can be adjusted to any position.Linearly arranged KEUCO accessories can be found around the WC that perfectly match the symmetry of the room. The toilet paper is found under the cover of the COLLECTION MOLL toilet paper holder. The matching chrome-plated brush set with its easily removable insert is extremely easy to maintain.Awaiting the guests in the showers are the minimalist IXMO fittings from KEUCO. The suites and rooms feature combinations of shower head and hand shower or the innovative IXMO SOLO shower fitting, which combines single-lever mixer and hose connection in only one module. With its motto "less can do more", IXMO from KEUCO combines multiple functions in the smallest of spaces, and features a designer look. All in all an enticing choice of interiors, which makes a stay at Le Méridien Munich an unforgettable experience.
Sponsored
Nottingham Trent University, Health and Allied Professions Centre

Nottingham Trent University, Health and Allied Professions Centre

Senior Architectural Systems Ltd

The new purpose-built Health & Allied Professions (HAP) Centre forms part of Nottingham Trent University’s vibrant Clifton Campus and features an array of innovative resources and amenities, including mock hospital wards, specialist equipment and creative teaching spaces, to assist students in their study of nursing, paramedicine and healthcare.The impressive building has been designed by architects Pick Everard and incorporates a number of sustainable features to achieve an ‘excellent’ BREEAM rating. Senior’s fenestration systems, which offer cradle-to-cradle recyclability, were the ideal choice and the building’s striking main façade features both Senior’s thermally-enhanced SF52 aluminium curtain wall system and integrated SPW600 aluminium windows. Senior’s products were fabricated and installed by supply chain partner Logic Aluminium Systems for main contractor Henry Brothers Ltd.As well as a creating a welcoming gateway to the University’s Clifton Campus, the new two-storey building has been designed to provide both visual interest and maximise the use of daylighting. The use of Senior’s slimline SF52 aluminium curtain wall systems floods the main atrium with natural light and provides each of the rooms with extensive views of the campus and surrounding areas. Ventilation is provided by Senior’s robust SPW600 aluminium windows which have been seamlessly incorporated into the curtain wall.The interior features of the new HAP Centre are just as impressive, with flexible teaching and study areas interspersed with state-of-the-art facilities including a virtual reality wall, which enables students to practice emergency medical responses in ‘real life’ settings, and mock hospital wards and domestic flat settings which feature robotically controlled mannequins that allow a range of patient symptoms, illnesses, and scenarios to be simulated and studied.
Sponsored
WAGWORKS, FULHAM, LONDON

WAGWORKS, FULHAM, LONDON

Stratum Resin Flooring Limited

 Case StudyWAGWORKS, FULHAM, LONDON Architect: Simpson StudioConstruction Company: Fileturn LimitedProject Installation Dates: 2022Flooring Systems Installed: Bolidtop 525 Deco with textureless anti-slip (54720)Colour:  S 4030-G50Y with flake 2/52-3 Stratum were specified to install a hygienic, safe, easy to clean, scratch resistant floor to the first of this brand new up market chain of doggy day care centres in Fulham. Stratum provided the trendy space with an attractive floor to match the other natural materials and colours in the scheme. The resin needed to be installed over a metal panel raised access floor in the main circulation areas. Challenge-      The resin needed to be installed over a metal panel raised access floor in the main circulation areas.-      To select a colour and finish that would sit alongside and compliment a range of different materials chosen for the interior spaces.-      To carefully programme in the work and co-ordinate with the other trades on the project.-      To provide a floor soft enough for doggy paws, yet hardwearing and anti-slip whilst maintaining ease of cleaning.-      To arrange for products to be delivered to a busy street in London with only front access  Solution-      Bolidtop 525 Deco was selected with flake system and textureless anti-slip coating in a shade of green with black flakes. -      Cement boards were laid on top of steel raised access floor.-      To work closely with Fileturn Limited to ensure timing of delivery and programme goes to plan.   Benefits/Installation-      The Stratum system is the most visible floor finish in the main space. It covers a well used pathway, providing a soft flexible floor, with a smooth slip resistant finish.Result-      A perfect floor for heavy footfall (and pawfall) that is easy to clean and ties in beautifully with the modern, natural scheme.
Sponsored
True Student Accommodation

True Student Accommodation

Senior Architectural Systems Ltd

At 13 storeys high and with a central location that puts the development within easy reach of Glasgow’s main universities, the True Glasgow student accommodation scheme has been designed by KKA Architects. Comprising 315 apartments for both shared and single occupancy, the new True Glasgow scheme on New City Road has been designed to offer inspirational student accommodation. With each apartment offering light and spacious living and study areas, the development also includes an array of exciting communal facilities including a gym and cinema. To balance the scheme’s city centre location, access to greenspaces has been incorporated through the creation of a rooftop garden and a walled courtyard garden at ground level.Specified to provide daylighting and give far-reaching views of the city, Senior’s thermally-efficient SPW600e tilt and turn aluminium windows were installed to the individual apartments. The main façade also benefits from the slim sightlines of Senior’s SF52 aluminium curtain walling, which has been fabricated in a combination of different capping options to create a unique façade design. As a vertical capped option, the slimline curtain wall features a specially designed toggle system which is used horizontally to create externally frameless transoms and to complement the height of the building structure. The SF52 system has also been installed as a completely frameless silicone glazed solution, with additional ventilation achieved via the incorporation of Senior’s frameless SFF aluminium window vents.To complete the fenestration package, Senior’s robust SPW600 aluminium commercial doors have been used to provide safe and secure access.Senior’s supply chain partner and specialist contractor Scottech has fabricated and installed Senior’s aluminium windows, doors and curtain wall solutions for main contractor Ogilvie.
Sponsored
Solving echoing sound issues within Scouts centre, Cheshire

Solving echoing sound issues within Scouts centre, Cheshire

Hush Acoustics

When the 35th South West Cheshire Scouts moved into their brand new £285,000 state of the art Scout Centre, they immediately noticed that a problem with extreme echoes in the main hall.The hall is used by over 120 Beavers, Cubs and Scouts weekly, plus wider community use, so it was imperative that the acoustic issues were resolved as quickly as possible.The building itself was purpose built and is a conventional brick construction lined with Thermalite blocks. The main activity area measures 11 x 11 metres and around this are toilets, a kitchen, large equipment store and a small meeting room. The store area remains with the painted Thermalite blocks, but the remainder of the building has been rendered and skimmed with plasterboard. The decision was made by the Scout leaders that it was inappropriate to use plasterboard in the main activity hall fearing it would not stand up to the rigorous activities of the scouts and would soon get damaged, therefore opting for render and plaster. The ceiling was skimmed plasterboard.After immediate recognition of the acoustic problems within the building, the organisation approached Hush for advice and guidance. Our technical manager carried out tests, calculating the overall existing reverberation time to be 3.9 seconds with a peak at 500 Hz of 5.39 seconds. Subjectively the reverberation time seemed longer, around 6-8 seconds, which was surprising in a hall of these dimensions and construction.After carrying out the tests on the centre, Hush recommended a solution to treat the hall (aiming for a reverberation time of 1.5 seconds over the wider frequency spectrum) using 40x Hush Absorber 50 panels.The transformation was instantaneous, with immediate feedback that they could hear the room recovering. John Bennett, Group Scout Leader, said“The result has exceeded our hopes, it is now possible to have a quiet conversation whilst 20+ six to eight year olds are having fun! Not only that, it looks good as well.
Sponsored
GEC ANDERSON SELECTED TO CATER FOR SUSTAINABLE LAMBETH COMMUNITY PROJECT

GEC ANDERSON SELECTED TO CATER FOR SUSTAINABLE LAMBETH COMMUNITY PROJECT

Anderson, GEC Ltd

A highly sustainable Education & Visitor Centre is nearing completion alongside a historic landmark in a south London park, with the fit out including the installation of stainless steel sinks, work-surfaces and shelving units, supplied and installed by sector specialist, GEC Anderson. 
Sponsored
New Tipperary Museum of Hidden History protects its exhibits with MEDITE CLEAR

New Tipperary Museum of Hidden History protects its exhibits with MEDITE CLEAR

MEDITE SMARTPLY

The newly refurbished Tipperary Museum of Hidden History has put the wellbeing of both its artefacts and guests first by extensively using MEDITE CLEAR in its brand-new interior fit-out, an MDF panel manufactured with zero-added formaldehyde.
Sponsored
Heathrow Park maintenance walkway - plank gratings

Heathrow Park maintenance walkway - plank gratings

Elefant Gratings T/A PcP Gratings Ltd

Heathrow Park is an industrial estate situated close to Heathrow Airport, UK. The construction project involved different collaboration partners – a UK steelwork and installation company and a main contractor, both operating as key stakeholders in the Heathrow Park project. The steelwork company contacted PcP on behalf of the main contractor, looking for a cost-efficient steel maintenance roof walkway to access roof equipment.Project criteria and proposalOn behalf of the main contractor, a steelwork contractor approached PcP to quote for a suitable product for 3,260 square metres of steel flooring for a maintenance walkway. Normally, twisted bar grating is specified for projects of this kind, but PcP CUBE® gratings were suggested to match the customer’s criteria regarding delivery time.The main contractor required grating for a steel flooring platform which had to be supplied by a very tight deadline and at a competitive price but with a high-quality finish. Once the customer accepted the initial proposal for the CUBE® gratings, PcP ensured that the quotation met the all the criteria specified by the client for the planning application. We provided Static load calculations and samples in order to obtain final approval.The solution CUBE® grating – an alternative to twisted bar gratingPcP proposed the new B-CUBE® grating for Heathrow Park flooring as it could be made to suit the spans required at a competitive price. However, and more importantly, the B-CUBE® grating proved a viable proposition to the client due to the low weight of the product compared to other gratings. The delivery time also met the strict site requirements. For the project, the B-CUBE® grating was manufactured over a six-week period using robotic welding on both day and night shifts in order to meet the project schedule.PcP experts delivered tailor-made CUBE® gratings for the steel flooring, and the work included paying special attention to details, accurate technical drawings, and providing all the necessary product certification and datasheets.Customer support, technical expertise and calculationsIn order to address any queries, PcP provided full support from its technical department and customer service team. The following elements were relevant for meeting the strict requirements to both product and delivery:PcP in-house calculation software and expertise was used to provide the know-how required to produce specifications and data sheets in line with British Standards and to meet customer requirements.PcP’s experienced in-house drawing team provided full panel drawings for client approval prior to manufacture.
Sponsored
GERA Building, Nottingham University - PASSIV HAUS CERTIFIED

GERA Building, Nottingham University - PASSIV HAUS CERTIFIED

Aluprof UK

The new 2,500m2 research facility for the University of Nottingham provides laboratory, office and support accommodation for the UK Government Energy Acceleration Research Initiative alongside the university. Using Passiv Haus certified Aluprof MB-TT50 curtain walling and MB-104 Passive windows and door systems, the building achieved Passiv Haus accreditation. Architect: Lewis & Hickey Main Contractor: Robert Woodhead Construction
Sponsored
Red Hill Business Park, Staffordshire

Red Hill Business Park, Staffordshire

Nullifire – a brand of Tremco CPG UK Ltd

Contractors building new offices and warehouses in Staffordshire have used Nullifire’s SC902 to complete the passive fire protection of the exposed steel frames successfully despite harsh winter conditions. Main contractor, McLaren Construction, is building the new Redhill Business Park in Stafford for Staffordshire County Council. The 40-acre greenfield site comprises seven plots earmarked for industrial, manufacturing and warehousing development.
Sponsored
Edgbaston Stadium

Edgbaston Stadium

Viritopia Limited

The main intent of this project was biophilia, and to enhance the well-being along with the overall experience of the spectators. It was a bit challenging as it is both an interior and exterior wall - it is protected from the rain and outside weather, yet still open to it and gets most of the natural daylight that it would get outside. However, with the ANS soil-based living wall system we were able to tailor the plant palette to suit this exposure.
Sponsored
8 Bishopsgate Part 2: Plantrooms and Floors

8 Bishopsgate Part 2: Plantrooms and Floors

FLOCONTROL LTD

A single source for the entire valve package for the plantrooms, branches and public health applications, supplied on short lead times on call-off, working with main as well as the sub-contractors. Features our range of Isolation and Check Valves, Strainers, Pressure Reducing Valves, Thermostatic Mixing Valves and Thermal Balancing Valves, in sizes from 15-300mm, with pressure ratings PN16, PN25 and PN40.
Sponsored
Colchester Academy

Colchester Academy

Gerflor Flooring UK Limited

When Colchester Academy in Essex required a new sports floor for their main hall and their dance studio, they turned to international flooring specialist Gerflor for an Olympic pedigree solution. For this prestigious education establishment, Gerflor would supply a total of 552m2 of their world class Taraflex® Performance vinyl sports flooring for the sports hall, and 258m2 of their Taraflex® Combi 85 System in Evolution for their dance studio.
Sponsored
A New Angle in Entrance Matting Design at Landmark, Manchester

A New Angle in Entrance Matting Design at Landmark, Manchester

INTRAsystems

To complement the atrium’s strong linear aesthetic the architect specified INTRAform DM Low Profile entrance matting in silver finish. In a striking design statement, the entrance mat is rotated from square, creating an angular extension of matting towards the reception desk. This unique positioning helps to both guide visitors towards reception whilst simultaneously orientating itself towards the main traffic flow of the building.
Sponsored
Falco Provides Cycle Parking Infrastructure to Winslow Station as it Re-Joins the Railway Network After 55 Years

Falco Provides Cycle Parking Infrastructure to Winslow Station as it Re-Joins the Railway Network After 55 Years

Falco UK Ltd

Winslow’s brand new railway station has received a huge cycling boost after Falco manufactured and installed a series of 68 cycle parking spaces with associated cycle canopies this month.The new station is located on the western outskirts of the town, at the junction of Buckingham Road and is being built for Winslow as part of the East West Rail project, which is to re-establish the route between Oxford and Cambridge.As part of the new development, Falco installed a series of 68 spaces of the UK’s best-selling two-tier cycle rack, combined with 15m of the open and spacious FalcoRail cycle canopy, providing cycle-rail users with everything they might need as part of their daily commute.Two key products of the scheme are the tried and tested FalcoLevel-Premium+ two-tier cycle parking system and the EN 1090 FalcoRail cycle canopy, which have been used throughout the railway network to give cyclists using the railway the same experience across the region’s stations. When combined together, the Falco facilities create the ultimate cycle park - providing cyclists with high levels of cycle security in a spacious contemporary canopy design.The FalcoLevel Premium+ two tier cycle racks incorporate an integral gas strut to enable easier lifting of heavier bikes as well as additional locking points so that cyclists have multiple security points for their bikes.Once up and running, Winslow Station will become a stop on the new East West Rail line between Oxford, Milton Keynes and Cambridge.In addition, Winslow is only one of hundreds of key UK-wide stations to receive Falco cycle parking in recent months, with major installations also including flagship cycle parking infrastructure for Manchester Piccadilly Station, a bespoke cycle hub for Kenley Station, cycle shelters for Uttoxeter, Boston and Long Eaton Stations and a flagship cycle hub at Walkden Station.For more information about the cycle parking installation at Winslow Station, please contact our helpful sales team on 01538 380080.

Showing 613-648 of 1080

Feedback