Limerick Institute of Technology (LIT)

Limerick Institute of Technology (LIT)

Tobermore

Limerick Institute of Technology’s Coonagh Campus is the first engineering-focused higher education campus in the Mid-West of Ireland.The new 7,000m2 engineering campus provides an additional 542 places on LIT’s engineering courses, an expansion which is considered essential to support industry demand in the region.Designed to provide agility of use, the campus will go beyond what is traditionally expected from an educational institution. It will provide facilities that encourage education and research to co-exist, facilitate industry leaders to meet and share ideas, and allow companies to use the various diverse spaces for training courses and seminars.Tobermore is proud to have provided granite-look paving and kerbs on this landmark Irish project.
Sponsored
Kite & Kestrel, West Wittering

Kite & Kestrel, West Wittering

Tobermore

The ChallengeAttractive permeable paving was required for two luxurious rural properties  Kite and Kestrel have been designed to create an agricultural character with a modern appearance. The two luxury homes located a short walk from West Wittering beach, have been carefully designed to remain connected with the locality.  The properties required a complementary paving solution that was functional yet aesthetically pleasing. Paving was required for the two driveways alongside the shared access courtyard. The developer wanted the areas to be clearly differentiated to give each property its own space.  Laying patterns were a useful way to subtly break up the area and give individuality to the properties. Whilst kerbing was required functionally, continuity with the overall modern design needed to be considered.  The developer encountered some difficulties when obtaining planning permission due to the properties high profile and sensitive location. The council’s strong desire to protect the environment of the rural location contributed to the request for a permeable paving solution. The Solution Tobermore’s Hydropave permeable paving was the perfect SuDS solution.   Tobermore provided hard landscape products for the courtyard and driveways to achieve the ‘modern, yet rural’ design brief. Manufactured to create a rustic, aged appearance, Tobermore’s Hydropave Tegula permeable paving brings elegance and charm to the luxury homes. With its ability to function as a SuDS system, choosing to use Hydropave increased the chances for planning permission approval, whilst aligning with the environmental factors considered when designing the properties.  Junnell Homes wanted to subtly separate the driveway area from the courtyard, while maintaining the aesthetic appeal. Hydropave Tegula was chosen for both locations, but with different laying patterns and unit sizes.  A herringbone laying pattern was used for the courtyard, offering an aesthetic appeal and increased trafficability. To ensure continuity of the style, the driveways were also laid with permeable block paving but using duo sizes in a stretcher bond laying pattern, helping to break up the space.  Fusion Kerb offered Junnell Homes a cost-effective, premium kerb with the striking aesthetics of a granite kerb.
Sponsored
Seamus Heaney Homeplace, Bellaghy

Seamus Heaney Homeplace, Bellaghy

Tobermore

When W & M Given Architects was assigned the prestigious task of designing a new arts and literary centre in Bellaghy that celebrates the life and literature of the late Nobel laureate Seamus Heaney, the architect was determined to create a striking tribute that would do the memory of Seamus Heaney justice.The external works were just as important as the interior design and having worked with Tobermore on numerous projects over the years, W & M Given was confident that Tobermore would have an appropriate hard landscaping solution that would achieve the desired result. Tobermore did not disappoint and provided the architect with a combination of fabulous Fusion and sparkling Sienna Setts block paving with modern Mayfair Flags to create a striking, contemporary landscape design
Sponsored
Copthorne Place - Persimmon Homes

Copthorne Place - Persimmon Homes

Tobermore

Tobermore supplied Kingston facing brick in the vibrant blended tones of Moorland and Cottage Red for the construction of the homes at this Persimmon Homes site in the charming market town of Epsom in Surrey.
Sponsored
Rockfon Makes Sound Sense For New Phoenix Academy

Rockfon Makes Sound Sense For New Phoenix Academy

Rockfon

ROCKFON has successfully worked together with Global Contract Interiors, Kier Construction and Architects Seymour Harris, to establish a fully compliant range of acoustic solutions that meet the required performance specifications at the new Phoenix Academy in Telford; built as part of the council’s Building Schools for the Future programme. Around 2,000m² of ROCKFON products: Rockfon Scholar and Samson wall panels; Rockfon Contour suspended baffles; and Rockfon Alaska suspended raft islands, were installed throughout the school to improve acoustic sound absorption – particularly in areas where the school design meant that traditional suspended ceilings were unable to be installed.
Sponsored
Emseal BEJS used to seal Parapet & wing wall joints on the new Dodmoor Bridge A45, Daventry Link Road   in Northamptonshire

Emseal BEJS used to seal Parapet & wing wall joints on the new Dodmoor Bridge A45, Daventry Link Road in Northamptonshire

NCC – Emseal Movement Joints

Client: Highways Agency, England, with Northampton CC Main Contractor: Balfour Beatty Main Products Used: Emseal BEJSEmseal BEJS used to seal Parapet & Wing wall joints on the new A45 Dodsmoor Bridge in Northamptonshire:This new bridge forms part of the A45 Daventry Link Road at Dodmoor in Northampton, where the wing-wall joints and the parapet joints with the precast elements provided a challenge for the engineers. These joints had to be able to accommodate the anticipated high levels of movement, but the site measured widths of the joints varied from around 25-30mm up to around 100mm. The potential movement, including movement in different planes, their variable form and dimensions, were too much for any ‘normal’ preformed joints, or extruded, gun-applied, so-called ‘mastic’ joint sealants to be used. This is clearly evidenced in the inset picture, where the specified extruded sealant was already seen to be failing under this loading. Additionally, the wing-wall joints were to be back-filled with a watertight seal. Following previous experience with difficult and complex movement jointing requirements, the Balfour Beatty engineers discussed the situation with NCC and the Emseal BEJS System was identified as an ideal solution. Emseal BEJS is available in different widths that can also be precompressed further for ease of installation, it is fast and easy to install, plus importantly requires no invasive mechanical fixings.
Sponsored
COVID-19 - Nightingale hospital, schools, leisure centres

COVID-19 - Nightingale hospital, schools, leisure centres

Be-Plas Hygienic Walls & Ceilings Ltd

Whilst following government guidelines, Beplas have supplied a huge amount of material for a number of key businesses and projects during the Covid-19 crisis. We have supplied materials for hygienic environments in Nightingale temporary hospitals, a huge number of smaller temporary installations at schools and leisure centres around the country.
Sponsored
Acoustics in the New Court House of Amsterdam is controlled by a seamless acoustic ceiling and wall system.

Acoustics in the New Court House of Amsterdam is controlled by a seamless acoustic ceiling and wall system.

Rockfon

Acoustics in this spectacular courthouse is controlled using Rockfon Mono Acoustic.
Sponsored
Yeoman Shield Quick to Install During Half Term at South Queensferry School

Yeoman Shield Quick to Install During Half Term at South Queensferry School

Yeoman Shield, trading name of Harrison Thompson & Co Ltd

South Queensferry School received an express service from Yeoman Shield to complete staircase wall refurbishment works during the February half term holiday period.With the requirement to protect 3 staircases and stairwells, Yeoman Shield were able to facilitate the supply and installation of 375 metres of FalmouthEx wall protection panels to suit the 4-day window allowed for the work to be carried out.Fitted to 1250 mm high along these areas, in 3 different colours to identify different departments, Yeoman Shield experienced installers were able to accommodate faultlessly the rake angle of the staircase walls, as well as removing and then reinstalling the original handrail when the panelling had been completed.South Queens Ferry School’s Business Manager commented “Yeoman Shield’s team of installers made an excellent, professional job of the wall protection project and we are very pleased with the results.”The implementation of wall protection to school interiors prevents impact damage caused by the movement of pupils, staff, bags and equipment. Stopping scratching and marking will result in reduced maintenance and redecoration costs in the future whilst serving to extend the lifecycle of interior walls.The easy to clean, inherently hygienic properties of the rigid PVCu wall panels ensures a high standard is maintained around the school enhancing the interior design and the welfare of pupils and staff.For more information on how Yeoman Shield can help schools reduce costs on re-painting and repair costs go to www.yeomanshield.com or call 0113 279 5854.
Sponsored
Limehouse Basin,

Limehouse Basin,

K Systems Insulated Facades

Located in East London, on a water gateway between the River Thames and over 2,000 miles of navigable canals, the six-building Limehouse Basin development comprised of a white EPS insulation board that was fixed to horizontal PVC rails that created a drained cavity between the insulated façade system and the substrate.Due to strict regulations introduced in December 2018 following the Grenfell tragedy, which states any building exceeding 18 metres in height must have walls comprised of non-combustible materials, this building was deemed non-compliant, unsafe, and not fit-for-purpose.Development owners Beckford, supported by the Building Safety Fund (BSF), required an expert team to execute the removal of the existing EWI and replace it with an appropriate alternative, without disrupting the unique aesthetic of the building.The combination of K Systems and Retrofit UK, two companies renowned for their expertise, quality of service, and superiority in the market, was an obvious choice for Beckfords.We have a good portfolio of BSF projects to date, and Limehouse Basin is another great example of how our team along with one of our approved installers can help make a building fit for purpose, whilst overcoming numerous challenges along the way. Unrivalled expertise and professional delivery are apparent in every groove and corner of this refurbishment.Our ServiceTogether with Approved Installer Retrofit UK, K Systems continued works despite Covid restrictions (adhering to Government guidelines) to deliver the Limehouse Basin project within the agreed timeframe and with minimal disruption to residents as requested by the client.Removal of the existing EWI system took place in rotation with the installation of the new system, and a robust programme was put into place by the contractor to ensure the building was not exposed to the elements for long periods of time, ensuring the residents were kept as comfortable as possible especially during the winter months. Decanting of the residents did not take place, so we worked alongside all parties to ensure the health, safety and welfare of the residents were prioritised during the works.Due to the nature of this project, technical monitoring from the K Systems team was increased, and weekly visits were planned along with a reactive approach to any on-site issues that arose from a technical perspective. Our technical teams actioned regular quality assessments and maintained open communication with all stakeholders.The result – an industry-leading insulated façade solution that fulfilled Beckfords’ criteria and delivered an outstanding architectural design and structure, fully compliant with fire regulations and boasting a better U-value which translates to better living conditions for the residents.Technical Project DetailsThe key objective for the Limehouse Basin project was to remove the non-compliant EWI system and replace it with a non-combustible system to meet current building regulations.Our team insist on being involved from the very concept of any BSF project to ensure an accurate specification could be developed and allow any initial underlying issues to be identified and rectified swiftly. Therefore, our Technical Team witnessed the removal of the existing system and inspected the substrate thoroughly.After extensive scoping, the K Systems M, mineral wool insulation, system with a silicone render finish was chosen as the preferred option, meeting the demands and needs of the client and current building regulations. This system provides high levels of fire resistance and non-combustibility (an A2-s1, d0) bringing it in line with mandatory Government requirements for buildings over 18m tall.With superb acoustic qualities and excellent environmental properties, the M System didn’t just tick the fire resistance box. The thermal performance of the building was significantly enhanced, with a U-value of 0.30W/m².k being achieved.The shape of the buildings were complex, with numerous curved areas of various facades. This meant the finish required an expert eye and a skilled hand to deliver seamlessly. Both K Systems and Retrofit are renowned for their expertise and superiority in the market, and therefore such challenges were overcome, and high standards of workmanship delivered.Another very challenging aspect of the build was the replication of the rainscreen cladding to the front of the buildings. This detail was successfully created by using tape joints, stop beads, and black silicone mastic to create a shadow gap – further testament to the expert capabilities of our team. This particular finish not only delivered the desired aesthetic but delivered an additional benefit of cost savings for the client.We worked closely with Retrofit UK throughout the duration of the refurb and as a result the Limehouse Basin buildings have a contemporary finish and attractive aesthetic worthy of the projects postcode, and one we are confident existing residents welcomed and potential residents appreciated.
Sponsored
Castle Hill Hospital Fortified by Yeoman Shield

Castle Hill Hospital Fortified by Yeoman Shield

Yeoman Shield, trading name of Harrison Thompson & Co Ltd

Castle Hill Hospital, at Cottingham near Hull, is defending busy areas of the hospital interiors from impact damage with the help of Yeoman Shield protection products.Serving the population of Hull and the East Riding of Yorkshire, the hospital has approximately 370 beds and caters for the majority of the trusts elective activity as well as housing the award- winning Queen’s Centre for Oncology and Haematology.The refurbishment of the Plastic Surgery Outpatients ground floor corridors and First floor I.C.U. corridors saw Yeoman Shield 200mm protection rail installed. The rails are fitted on a 60mm PVC “stand-off” spacers allowing them to be utilised as a handrail for those requiring it.A strengthening solid inner core ensures the rail is capable of taking the heaviest of blows from motorised or wheeled trolleys and equipment saving the wall from structural damage and marking.The vulnerable corners and terminating ends of the rail are equally protected from impact with the addition of Yeoman Shield’s new rubber, hardwearing and durable stop ends and wall return accessories.The busy catering department and corridors were also suffering from impact damage caused by the movement of the catering trolleys, food warmers and equipment. To combat costly damage to the décor Yeoman Shield 200mm protection rail has again been installed this time “flat-back” to the wall.For a hygienic yet protective finish to the walls Yeoman Shield smooth food grade wall panels were installed from floor to ceiling with extra defence in the form of the 200mm protection rail.All Yeoman Shield products were installed by directly employed Yeoman Shield fixing operatives ensuring an efficient and accurate first time fit.“The work carried out to corridors and catering department was undertaken with due consideration of each busy section of the hospital and to suit their working arrangements, including any out of hours working. All went very well and each department commented on how well the work went and how good the improvement is” Alan Parry, Estates Officer (Building).
Sponsored
Free Standing JAKOB Webnet Green Wall - St Dominic's College, Harrow.

Free Standing JAKOB Webnet Green Wall - St Dominic's College, Harrow.

MMA Architectural Systems Ltd

We supplied and installed over 500m² of Jakob Webnet for the new build sports hall at St Dominic’s College in Harrow. The Webnet, now clad with climbing plants has created a free-standing green wall which provides shade to the building and effectively disguises it, allowing it to blend in to the surrounding grounds.
Sponsored
Oaklands Rise, London

Oaklands Rise, London

Senior Architectural Systems Ltd

Senior Architectural Systems has taken its aluminium fenestration solutions to new heights after being specified on the new Oaklands Rise mixed-use residential development in London, which is not only one of the UK’s largest regeneration projects but also one of Senior’s largest contracts to date.Designed by CZWG Architects and constructed by the Vistry Partnership, the £175m scheme comprises three major tower blocks which vary in height from ten to 27 storeys. Senior’s slim profile SF52 aluminium curtain wall system has been used to create the striking faceted curved elevation, with the smooth rounded corners of the balconies and corner apartments further accentuating the design. Senior’s robust SPW500 aluminium commercial doors were used externally and installed to the fire exits and main entrance, with SPW600 aluminium doors fitted internally throughout communal areas.With the need to increase energy efficiency and reduce the carbon footprint of the scheme, Senior’s patented low U-value PURe® aluminium windows and PURe® SLIDE patio doors were also chosen for the scheme. As well as contributing to lower energy bills for the residents, the slim sightlines of the PURe® aluminium windows and doors perfectly frame the development’s far-reaching views over London and the attractive green streetscape below. The stylish PURe® SLIDE aluminium sliding doors also provide select apartments with access to individual roof terraces, creating a seamless link between the interior and exterior spaces.
Sponsored
St Edwards & Tollbrae Primary

St Edwards & Tollbrae Primary

Senior Architectural Systems Ltd

This new shared campus for two North Lanarkshire primary schools has been designed by leading architects Halliday Fraser Munro to reflect the individual identities of the two schools whilst uniting them in one single building.The layout of the new school building reflects the dual-nature of the campus, with two separate two-storey teaching wings set around a central courtyard. This open space and the surrounding linked buildings provide shared facilities including a gymnasium and dining hall. Constructed by main contractor and established supply chain partner, Morgan Sindall, the new modern school building benefits from several aluminium fenestration solutions from across Senior’s extensive range.The eye-catching main façade features Senior’s thermally-enhanced SF52 aluminium curtain wall system with integrated SPW501 aluminium commercial doors which provide safe and secure access. Throughout the building, Senior’s patented low U-value PURe® aluminium casement windows have been specified to help reduce heat loss and boost the overall energy-efficiency of the scheme. Senior’s fenestration systems were fabricated and installed by specialist contractor Linn-Tech.
Sponsored
BISF Housing, Motherwell

BISF Housing, Motherwell

K Systems Insulated Facades

BackgroundThe BISF (British Iron and Steel Federation) constructed the Newarthill properties in the 1940’s, utilising steel-framed walls that were initially coated in cement render and vertical steel panels.In previous renovations overseen by the Local Authority, the upper level of the building was clad in PVC weatherboard, while the lowest floor had its exterior re-rendered. The building is characterised by its non-traditional construction style.The houses had extremely poor thermal performance and the flats were difficult and expensive to heat, especially with the rising fuel prices and current cost of living crisis, meaning some residents were in a state of fuel poverty.North Lanarkshire Council required an EWI solution that would achieve the following three key objectives:- Improve the thermal performance of the property portfolio- Specify a system that would achieve a U-value of 0.17 W/m²K and would involve as little technical detailing around the property as possible- Ensure the properties had a modern and aesthetically pleasing look as the current exterior was tired and datedUnderstanding and appreciating K System’s expertise in this sector and innate ability to deliver best-in-class refurbishments, North Lanarkshire Council appointed the partnership of K Systems and Ailsa Building Contractors to tackle the low rise refurbishment project.Our ServiceAs the Newarthill development was already occupied, a key element of this project was to deliver the refurbishment with minimal disruption to current residents and / or neighbouring houses.This is one of K Systems strengths, ensuring jobs are delivered in a timely fashion, without delay, without disruption, and with full disclosure of each phase given to residents throughout the project to build rapport, trust, and confidence.On this particular low rise refurbishment, which had limited access points for all traffic in and out surrounding its immediate vicinity, K Systems had to work closely with the contractor, main contractor, and local authority to ensure they were working in harmony to negate any unnecessary commotion.K Systems’ technical team also carried out regular site visits to make sure the system was installed to the highest standard, in line with specification, and to ensure all involved parties were delivering to time and budget.The refurbishment of the properties is a great example of K Systems’ unparalleled ability to deliver constructional excellence that not only meets but exceeds the expectations of its customers.Technical Project DetailsOn initial scope, the K Systems team identified that a major challenge for this project was going to be the technical detailing between the timber frame sheeted ply at the top storey and precast concrete slab at the bottom. Several U-value calculations were completed by the experienced K Systems team to support the Council’s request of minimal detailing around the property and the target U-value.To meet these requirements, the K Systems P EWI system was specified, which utilises phenolic foam insulation boards. This insulation is lightweight and has a high thermal performance, allowing for thinner sections of insulation to achieve optimal thermal efficiency - perfect for this project, achieving the target U-value of 0.17 W/m²K , up from 0.32 W/m²K.It is a suitable solution for buildings that are restricted in expanding their footprint due to pavements or nearby properties, and can be easily installed on masonry structures, as well as non-traditional structures - an ideal solution for the Newarthill properties.Addressing the request for a modernised aesthetic, a dash render finish was specified. This render is extremely robust, hard-wearing, and low maintenance, ensuring the properties’ refreshed exterior would remain for years to come. The dash render was also complementary to the existing local property portfolio which was something the Council wanted to achieve.This refurb completely transformed cold, weathered, distressed housing in a Scotland suburb into warm, comfortable, aesthetically pleasing homes that met the exact requirements of North Lanarkshire Council and reduced the energy bills for residents due to improved thermal performance.
Sponsored
Middlebeck Primary School, Newark

Middlebeck Primary School, Newark

Senior Architectural Systems Ltd

Located to the south of Newark, Middlebeck is a 694-acre urban extension which will provide new housing, access to local amenities and a new purpose built primary school. The Christ Church C of E Primary School has been constructed to serve the local community and boasts an attractive design by Gollifer Langston Architects, with the L shape plan of the new school forming two sides of a courtyard.Constructed by the Lindum Group, the attractive and contemporary design of the new school building embraces the use of natural daylighting and the extensive use of glazing helps to strengthen the connection between interior and exterior spaces. Senior’s slimline SF52 aluminium curtain wall system has created a light and welcoming entrance, with Senior’s versatile SPW600 aluminium windows and secure SPW501 aluminium commercial doors used throughout.Robust and fully recyclable, Senior’s aluminium fenestration systems were powder-coated to further enhance durability and to complement the white brise-soleil installed to the south side of the building to help control solar gain. Additional solar shading protection from the overhanging roof, in addition to the use of natural ventilation, photovoltaic roof panels and underfloor heating also contribute to the overall sustainable design of the school building.Senior worked closely with supply chain partner Alusec to deliver the fenestration package.
Sponsored
Tesco Store, Musselburgh - Manson Architects

Tesco Store, Musselburgh - Manson Architects

Tobermore

A permeable product was required for the hard landscape at this Tesco branch in Musselburgh and Tobermore’s Hydropave 240 provided an effective SuDS solution as well as offering attractive aesthetics to enhance the grounds.
Sponsored
The Grange Setting standards for affordable housing

The Grange Setting standards for affordable housing

Tobermore

The Grange was the first Barratt Homes scheme to feature Tobermore’s smooth, vibrant Kingston facing brick. The project was listed on 24housing’s ‘Top 50 Housing Projects’ in 2015 which ranks the schemes driving affordable housing provision across England, Scotland and Wales.
Sponsored
Solihull Hospital - Wall Mounted Canopy

Solihull Hospital - Wall Mounted Canopy

Able Canopies Ltd

Solihull Hospital in Solihull, West Midlands, required a canopy to cover their outside ramp area that houses their waste bins, laundry bins and recycling compacters. They were in need of a structure that would be fixed to the building with a water tight seal and that would block the rain from entering the area, keeping their staff dry whilst also preventing ice from building up on the ramp which currently creates a slip hazard.
Sponsored
Rosther Hill Developments, Beswick Green

Rosther Hill Developments, Beswick Green

Tobermore

Developed by Rosther Hill Developments, Beswick Green is a period-themed development in Staffordshire. Lord and Lady Stafford of Swynnerton selected Tobermore’s Tegula Trio block paving and Kerbstone kerbing for the hard landscaping element of the site due to the products aged, antique aesthetics that complemented the traditional surroundings beautifully.
Sponsored
Lidl, High Street Mall, Portadown

Lidl, High Street Mall, Portadown

Tobermore

The Challenge Modern paving was required for the entrance plaza of a shopping destination High Street Mall has been transformed into Portadown’s leading retail and parking hub. The £6m regeneration project required a new shopping centre layout, enhanced parking, greater town centre access and a new pedestrianised central plaza with modern landscaping. Over 2000m2 of modern paving material was required for the entrance to the retail hub. Due to the expansive nature of the area, laying patterns would need to be used to ‘zone’ and break up areas into smaller pockets of space. The plaza needed to be designed in a way that people could use it as a place to gather and socialise. The client wanted the retail project to have a public realm feel to it that the community could enjoy. The Solution Tobermore’s Fusion block paving created a plaza with a striking, modern look.  Fusion block paving in Silver, Mid Grey, Sandstone and Noir was chosen for the 2000m2 plaza which created a striking, modern look. The entrance to the new 25,000ft2 Lidl store features a new pedestrianised square complete with seating and planters. Anchor tenants, Lidl, opted for 600m2 of Fusion paving to be laid outside their premises in keeping with the rest of the retail park. The client fully embraced the complimentary hard landscape proposal which was provided by Tobermore. Unique laying patterns were used to ‘zone’ and break up space in the expansively paved area. The paving design provided by Tobermore featured ‘pockets of space’ where coffee docks and pop-up markets could be situated. Fusion in Sandstone and a small proportion of Mid Grey was used to zone ‘public’ areas like the courtyard. The walkways feature Fusion in Silver and Mid Grey with a low percentage of Sandstone in the blend. These design choices were made to distinguish each area while still giving subtle reference to each other. Bands of Fusion in Noir were used as buffer strips to create a clear distinction of where people can walk into and out of the Lidl store.  The retail project certainly has a public realm feel to it as it is fully pedestrianised. The plaza was designed in a way that the local community could use it as a place to gather and socialise. There are seated areas with soft landscaping that creates a calming atmosphere for people to relax.  
Sponsored
The Sarah Swift Building, University of Lincoln

The Sarah Swift Building, University of Lincoln

Tobermore

Re-form Landscape Architecture were tasked with sourcing sustainable hard landscaping for The Sarah Swift Building, University of Lincoln.The public realm setting of the building links Brayford Wharf through to the historic Wigford Yard. Ultimately the space extends through to Lincolns’ High Street – thus uniting the University campus with the city centre. As such, a paving solution was required that would adequately define the areas and complement the modern facade of the University building.Tobermore’s Fusion block paving in Silver and Graphite was chosen as the hard landscaping of choice, complemented by the addition of Fusion Kerb.
Sponsored
Analog Devices Building, University of Limerick

Analog Devices Building, University of Limerick

Tobermore

The Analog Devices Building at the University of Limerick was constructed as part of the ground-breaking Bernal Project and was since awarded the Irish Building Project of the Year at the Irish Building and Design Awards 2016 in Dublin. Irish architect, Brady Shipman Martin, was appointed to design the external landscape and Tobermore helped make their job easier with the provision of an attractive paving solution that complemented the distinctive new building whilst providing continuity with the other areas on campus.
Sponsored
Aldermans Green Community Primary School

Aldermans Green Community Primary School

Tobermore

The warm, vibrant tones of Tobermore’s Tegula Trio block paving in Heather created a beautiful finish for the external areas at Aldermans Green Community Primary School in Coventry.
Sponsored
Aberavon Leisure Centre & Fitness Centre

Aberavon Leisure Centre & Fitness Centre

Tobermore

An attractive and functional hard landscaping method was required for the entrance area and car parking spaces at Aberavon Leisure & Fitness Centre in Port Talbot. The aged aesthetics of Tobermore’s Tegula and permeable capabilities of Hydropave Tegula Duo provided the ideal solution.
Sponsored
Peel Park Quarter, University of Salford

Peel Park Quarter, University of Salford

Tobermore

Peel Park Quarter is a new, state of the art student accommodation complex at the University of Salford. The £81 million project was managed by Graham Construction who aimed to achieve long-term sustainability for the new student village. Tobermore helped the contractor accomplish this goal with the provision of an attractive SuDS solution for the expansive landscape.
Sponsored
Ickenham Clinic - wall mounted canopy

Ickenham Clinic - wall mounted canopy

Able Canopies Ltd

In February 2020, we were approached by GD Construction who we have worked with in the past; they were working on a project at Ickenham Clinic in Uxbridge, London for Central and North West London NHS Foundation Trust. The clinic had an existing canopy which was supplied by a different supplier, yet it had received extensive wind damage and they were therefore looking to replace it.Central and North West London NHS Foundation Trust were keen to replace the canopy promptly, so we needed to supply the estimated costs swiftly.
Sponsored
Harrison View - Social housing with a difference

Harrison View - Social housing with a difference

Tobermore

Tobermore provided Lansdowne facing brick as a timeless and elegant external building solution for the homes at Harrison View. The project was highly commended in the ‘Best Social & Affordable Housing Development’ category at the 2015 North and East Yorkshire Building Excellence Awards.
Sponsored
Lidl Supermarket - Wall Mounted Canopy

Lidl Supermarket - Wall Mounted Canopy

Able Canopies Ltd

In September 2011 the Lidl store in Waterlooville, Hampshire underwent a refurbishment to their entrance area. However, since the refurbishment was completed, experienced a number of incidents of customers slipping over due to rain water entering the building and making the floor wet and slippery. This made the entrance area a high hazard that needed to be rectified.
Sponsored
West End Gate, London

West End Gate, London

AluK (GB) Ltd

The 110m, 29-storey curved on plan Westmark Tower is the tallest residential tower to have been completed in central London in 2021. Part of Berkeley Homes Central London’s prestigious West End Gate development in Marylebone, it features more than 14,000m2 of unitised curtain wall designed and supplied by aluminium fenestration specialists AluK and installed by envelope contractors Martifer. What makes this project really stand out is the collaborative approach that was demonstrated by AluK and the other consultants involved from the outset. With Berkeley at the centre of the process, the technical and commercial elements of the façade were successfully de-risked at pre-tender stage because AluK were able to work directly with lead architect Squire & Partners, delivery architect Design Delivery Unit (DDU), façade consultants Cladtech Associates and structural engineers WSP on a RIBA 4 system design for the unitised envelope. The challenge for AluK was to work with DDU to deliver a design that was true to the architect’s original intent whilst addressing the technical issues of a curved on plan façade from the second to 29th floor. All the unitised cells needed to be dead loaded back to a post tensioned concrete frame with a 3-dimensional floor bracket, whilst catering for the varying facets of the façade.The final unitised solution features more than 2200 unitised cells of three principal configurations. Each floor comprises: a vision cell, typically housing AluK’s concealed vent and full height glass panes, a panel cell, specifically designed to house specialist internal framework to carry articulated GRC (Glass Reinforced Concrete) feature piers and spandrels, and a recessed balcony cell with an integrated floating glass balustrade.With 36 different angles to overcome in a faceted design ranging from 0° to 15°, AluK developed a series of common aluminium extrusions to close the joints and reduce the number of profiles required. The horizontal stack joint uses an aluminium profile to carry the gasket and avoid the incidence of crimping as the cells are stacked around the building structure. What is also significant is that every cell connection provides four lines of system seal to ensure that the façade meets the stringent Cladtech performance specification and the CWCT Sequence B test.AluK’s system, extruded from 6063 T6 alloy, extracted benefits from both a mitred corner and a square cut system by creating a hybrid to suit both the client’s aesthetic desire for a mitred joint to the corners and Martifer’s manufacturing requirements of a square cut for economy.AluK also extruded tailored aluminium bracketry from a structural 6082 T6 alloy which was capable of supporting the system weight and allowing for 3-dimensional adjustment for precise installation.From the onset of the project, the Berkeley director team set out a time and design model of early engagement, specialist designers and fabricators all within a clear programme. This also included a series of productive workshops sharing client expectations and considerations. AluK not only facilitated these meetings but also bought into the collaborative ethos and contributed to a highly successful project for Berkeley.AluK’s designers are all from a fabrication/installation background and, as such, they design a value engineered solution from the outset. Part of this was using 14,000m2 of AluK’s AW86 unitised curtain walling system with minimal bespoke profiles and gaskets, yet it meets every challenge the project presented whilst offering a significant cost reduction in metal and accessories compared to the original specification in a competitor’s system. As part of the project team, AluK worked collaboratively alongside consultants Squire & Partners (concept architect), Buro Happold (thermal and acoustics), WSP (structures), Design Delivery Unit (delivery architect) and Cladtech (façade consultant). The façade design meets the thermal efficiency requirements of the building at 0.95W/m2K, as a weighted average. Using a 43dB Rw(+Ctr) acoustic glass, it also meets the sound reduction targets. Because AluK was involved at such an early stage in the project, the complete RIBA Stage 4 system design enabled façade contractors Martifer to realise significant cost savings for their tender and several months of time saving against their usual post-tender design and iteration phase. This also offered cost certainty for Berkeley and significantly de-risked the post tender delivery of the façade.Alongside the unitised curtain walling, the finished Westmark Tower will feature 241 AluK SC156 lift and slide doors, 750 concealed vents and 58 swing doors.West End Gate is Berkeley Homes’ latest luxury development being built on a 2.66-acre site. Described as a modern interpretation of classic London, it will feature a series of contemporary mansion blocks alongside the 29-storey curved stone tower. Work began on the first phase of West End Gate in the Spring of 2018 and was completed in Spring 2021, with internal fit out nearing the end.
Sponsored
Rockfon brings acoustic Tech to stunning TECA – The Event Complex Aberdeen

Rockfon brings acoustic Tech to stunning TECA – The Event Complex Aberdeen

Rockfon

Technical Manager Tim Spencer “The initial need was for an elegant high-performance ceiling grid that could span 2500mm and support the ceiling infill. The answer was a bespoke version of our Rockfon® System MaxiSpan™ grid. We were then briefed to find an acoustic solution to resolve the acoustic challenges for the spaces which would host a variety of music concerts. We worked in partnership with ROCKWOOL and the solution was bespoke 100mm thick Rockfon Color-all® black ceiling tiles in combination with 100mm ROCKWOOL FLEXI® overlay and 40mm thick Color-all panels together with 100mm or 160mm FLEXI for the walls.”
Sponsored
Bishop Auckland, Durham

Bishop Auckland, Durham

K Systems Insulated Facades

The Bishop Auckland refurbishment project, is a stellar example of K Systems ability to harness years of expertise with forward-thinking innovation to meet the needs of its clients.Durham Homes commissioned K Systems to refurbish its residential development of 120 terraced houses. The primary aim of this project was to improve the thermal performance rating of each home. The challenge for K Systems was to provide a suitable EWI solution whilst retaining the character of the homes by replicating the existing brick and stone walls.Due to this unique mix of required finishes, we were presented with an extremely complex project that required careful attention of several aesthetic and design considerations.Having a good reputation for matching systems with finishes to deliver clients’ visions, we worked in collaboration with our approved installer Westdale Group, to scope out the project and specification in fine detail, with particular focus on insulating properties and aesthetic.These poorly insulated brick and stone terraced houses were given a thermal upgrade to enhance occupier comfort. An attractive brick render finish was used over insulation to provide an aesthetic finish that is in keeping with the current street scene.This satisfied the client’s requirements whilst providing a total revamp for the properties, which has resulted in energy efficient and aesthetically pleasing homes for the client and residents.Our ServiceWe worked in collaboration with Durham Homes and approved installer Westdale Group to upgrade these poorly insulated brick and stone terraced houses and deliver a total revamp of the properties, resulting in thermally efficient homes.The project was completed with minimal disruption to existing residents, and due to forward planning and regular site visits by an experienced K Systems project manager, where processes and progress were monitored and evaluated, the project was completed within the agreed timescale.Our Application Specialists visited the site regularly throughout the project working in collaboration with the approved contractor to ensure correct installation and detailing.As a result, we delivered an excellently designed and expertly executed refurbishment, that exceeded the expectations and requirements of the client, Durham Homes, and the residents of the newly improved homes.Joe Rogers at Westdale Group, said:“To deliver such a large project (120 houses), it requires multiple teams to work seamlessly together and have absolute trust in the other’s skill, vision, and judgement. That’s exactly what we had with K Systems on this Bishop Auckland project. The team’s innate understanding of pairing systems with finishes for optimal performance is second to none and together we delivered a best-in-class refurbishment which was an absolute pleasure.”Technical Project DetailsEffective demand planning and technical detailing ensured that the Durham Homes project was completed on time in March 2022.Having comprehensively assessed the project requirements, taking into consideration thermal u-value target, aesthetics and cost, our K Systems E BrickRend EWI system was specified. This high-performing system is lightweight utilising expanded polystyrene (EPS) panels that are enhanced with graphite to further enhance thermal performance.The E BrickRend system has a fire performance rating of B2-s1,d0. It’s low moisture absorption and resistance to mould growth ensures a high level of durability.The system was specifically tailored to meet the thermal performance criteria of the project. Utilising 90mm EPS panels, the target U-value of 0.30W/m2K was achieved, delivering the benefits of improved thermal comfort and lower heating costs for residents, whilst helping the local authority achieve it’s environmental carbon reduction targets.Several finish options were considered to meet the client’s requirement of replicating the existing brick/stone appearance of the properties whilst remaining within the project budget.K Systems specified BrickRend, a bespoke, specially formulated polymer render which was colour-matched to the existing masonry. It was then down to the skill of our approved installer to apply pigments to tint and shade the render surface and simulate the appearance of real stonework. The surface is then sealed to provide a long-term durability. A dash render finish was applied to the rear of the Bishop Auckland properties.This particular finish didn’t just ‘fit the bill’ at the time of delivery, but is an economic, durable, lightweight solution, easily applied, with an increased bond strength compared to sand and cement, which will protect the insulation and structural fabric of the homes from environmental deterioration in years to come.This customised finish and attention to detail is a perfect example of how K Systems works with all clients to fulfil any specific design criteria and go above and beyond the standard requirements to deliver superior quality.
Sponsored
Open mesh grating facade to create green wall at New Covent Garden

Open mesh grating facade to create green wall at New Covent Garden

Lang+Fulton

The refurbishment of the car park was one of the first steps in the regeneration of New Covent Garden Market; a project which is projected to take 10 years at a cost of £2 billion.Appropriately for a flower and fruit market, BDP designed a green wall facade. Lang+Fulton’s Stereo-3 panels were chosen to clad three elevations of the 7-storey car park, sections of which will become covered in ivy.The design incorporated an aluminium box section framework and feature panels as well as open spaces to create added interest. In total Lang+Fulton supplied 422 grating panels in various sizes up to 2510mm high to cover an area of 1296m2. The grating panels were framed at the top and bottom with bent over lugs for fixing to the aluminium uprights. 
Sponsored
STEREO-KINETIC® wall cladding transforms refurbished car park at Festival Square, Basingstoke

STEREO-KINETIC® wall cladding transforms refurbished car park at Festival Square, Basingstoke

Lang+Fulton

Investment in the infrastructure at Festival Place shopping centre in Basingstoke has included the refurbishment and extension of the 3,000 space car park. Lang+Fulton worked with Bell Associates to design a new façade using their STEREO-KINETIC® Wall cladding. The gradation of the stainless steel tiles was designed to allow for ventilation whilst transforming the appearance of the original car park and linking it to the new extension with one seamless frontage. The panels were mounted on to an independent steel frame which was bolted back to new structural steelwork.
Sponsored
Skyfold vertically rising acoustic folding walls used with new hotel in central Birmingham offering ease of operation and excellent sound performance

Skyfold vertically rising acoustic folding walls used with new hotel in central Birmingham offering ease of operation and excellent sound performance

Style - Moveable Partition Specialists

Skyfold rises vertically within the ceilng offering valuable floor space saving and operation by simply turning a key.
Sponsored
Marineside, Bracklesham Bay

Marineside, Bracklesham Bay

K Systems Insulated Facades

BackgroundWith stunning southerly views across to the Isle of Wight and also westerley along the Solent to Hayling Island, Portsmouth and the Millenium Tower, Marineside, a development of three-storey properties at Bracklesham Bay, is a dream location for anyone to live.However, whilst a prominent beachfront location comes with spectacular sunsets and unrivalled tranquillity, it does leave buildings highly exposed and prone to weather damage.This was the case with the Marineside development which showed signs of high coastal corrosion and were in severe need of regeneration both aesthetically and internally to address thermal underperformance.K Systems teamed with CBG, Envirorend SE, and Harrington Design to complete the low-rise refurbishment project, with three main objectives:- Remediate problematic substrate- Improve thermal performance for the benefit of residents- Revitalise a tired and unattractive exteriorAs with all projects, K Systems began a detailed scope and specification process with full involvement from all parties, including deploying digital technology to provide an inspirational viewpoint for the client to understand what the refurbishment would look like at completion.Our ServiceFollowing extensive planning, K Systems brought the client’s vision to life and created a beautiful collection of revitalised waterside homes on the banks of Bracklesham Bay.The refurbishment of Marineside wasn’t a straightforward project and required comprehensive scoping to ensure optimal delivery and 100% satisfaction levels amongst current residents.Therefore, it is a notable triumph for K Systems to have delivered a successful project, within budget, without delay or compromise on quality, that not only met but exceeded the requirements and expectations of the client.Each structurally sound, aesthetically pleasing dwelling boasted excellent thermal performance properties, achieving a U-value of 0.30W/m²K, allowing residents to benefit from more thermally efficient homes and experience a reduction in energy consumption.K Systems in collaboration with CBG, Envirorend SE and Harrington Design delivered beautiful, clean, crisp, aesthetically attractive properties, each with a protective exterior finish which will provide resistance to the elements for years to come.Technical Project DetailsOnce the existing façade was removed it was clear that the block substrate had high level corrosion due to the harsh coastal environment it had endured since being built in the 1940s.Multiple areas of the three buildings had to be completely removed and replaced using a medium density block that achieved superior pull-out test results. This was a recommendation by K Systems which enforced confidence with not just the client but the homeowners too as the best way to ensure longevity of the buildings.The removal also revealed that the substrate was uneven and unsafe. K Systems identified that extensive dubbing out was also needed with these buildings. Dubbing out meant the insulation boards were installed line and level giving a crisp and professional finish.The Marineside buildings were solid block construction making them extremely inefficient and presented an expense to the homeowners during winter months due to insufficient thermal performance.Utilising its years of unparalleled expertise, K Systems specified the industry-proven Mineral Wool insulation system for the project to address the aged façade and significantly boost the thermal performance of the building.K Systems Mineral Wool insulation (a mat of rock fibres which prevents the movement of air) has an industry-leading ability to generate exceptional thermal performance. That made it the perfect choice for the Marineside refurbishment as it would combat the heating issues faced by residents whilst retaining the solid foundations of the existing building.Other technical benefits which made the K Systems 110mm Mineral Wool system the ideal specification for this refurbishment include:- its level of fire resistance and non-combustibility, ensuring the building met all safety regulations required for residential buildings in England- its excellent acoustic properties, ensuring coastal noise absorption further enhancing the peaceful and tranquillity of the area- its environmentally friendly composition as it is free from gases with ODP (ozone depletion properties) or GWP (global warming potential)Due to the coastal location and exposure to the elements, it was vital that this refurbishment guaranteed total water tightness. K Systems worked closely with the roof installers ensuring that the parapet details were correctly detailed making the system as a whole watertight.The exterior finish was just as important as the internal construction and detailing. The Bracklesham Bay area has a level of prestige and the aesthetics needed to reflect that. K Systems finished the Marineside complexes with a silicone thin coat render, which is extremely breathable and resistant to the elements, in shades Limestone White and Granite. This completely transformed the aesthetic of the residential blocks making them much more appealing to potential dwellers.Envirorend SE commented:“ We secured the refurbishment works at Marineside , for a good client and works started in January 2022. The scope of works was to make the 3 blocks more energy efficient. Situated directly on the beach, the location made the install very challenging as the weather was not very forgiving at that time of year. The existing substrate was all over the place so a lot of effort was put in to get the walls looking line and level while staying within the remit of the specification. Works were completed in July 2022 and to a very high standard for all to see. “