NBS Source
I'm a manufacturer

"arts craft framing etc"

5,584 results found

Sort by:

Showing 505-533 of 533

Sponsored
Imperial College, London. Featuring Deceuninck 2500 Series. Delivered a customer saving over aluminium of 30%

Imperial College, London. Featuring Deceuninck 2500 Series. Delivered a customer saving over aluminium of 30%

Deceuninck Ltd

This £590,000 project on behalf of Imperial College, London was delivered for Berkeley Group with specialist commercial fabricator Dempsey Dyer. The project features: 1100 frames Deceuninck 2500 Series Tilt and Turn Decoroc 4 sided colour Iron Grey RAL 7011 Acoustics RW38db U Value 1.5
Sponsored
Rainscreen Cladding for new houses

Rainscreen Cladding for new houses

Sto Ltd

Located in Fort William in the Scottish Highlands, Blar Mor comprises 117 one-to-four-bedroom affordable homes, which have been built by TSL Contractors. The main contractor partnered with AFS (Scotland) to deliver a durable cladding system for timber frame homes, removing the requirement for traditional construction.
Sponsored
Rosebury Road, Garage Conversion

Rosebury Road, Garage Conversion

ROCKWOOL Ltd

Homeowner and self-builder Marianne was able to draw on the right help, expertise, and best products – including ROCKWOOL insulation – to realise her dream.ROCKWOOL Timber Frame Slab used for this project is a durable non-combustible stone wool slab that provides thermal, non-combustible insulation for walls and roofs. 
Sponsored
EcoCampus

EcoCampus

Kingspan Data & Flooring

Kingspan RMG600 Raised Access Floor panels are being utilised across multiple state-of-the-art teaching and learning facilities including specialist laboratory spaces.The flooring solution provides the facility management team with a great deal of flexibility – rapid access to the void, enabling reconfiguration, fault-finding or simply maintaining the many metres of cables and pipework that are required to service such a leading-edge education building.
Sponsored
Deutsche Bank Berlin (Germany)

Deutsche Bank Berlin (Germany)

Record U.K. Limited

The Berlin headquarters of Deutsche Bank are located in the Charlottenstrasse, which is also home to the Bank’s Kunsthalle or art gallery, and record products are well represented here. The sandstone building, built in the nineteen twenties, features three door systems abreast, giving the entrance a new and attractive face. This look creates an aesthetic tension between the use of modern materials on the one hand, and the historical aspects of the building on the other.
Sponsored
Duoflex hot melt structural waterproofing system for new hospital

Duoflex hot melt structural waterproofing system for new hospital

Soprema UK

A brand new hospital in Middlesex will deliver efficient and much improved care to it’s patients. The hospital includes new wards, an extension on one of its existing wings as well as the relocation of its existing energy centre. With so much investment in the new hospital including state-of-the-art equipment, the roof design needed to be robust, provide security and require minimal maintenance throughout its lifetime.
Sponsored
HODGSON SEALANTS BRINGS MANCHESTER TOWN HALL WINDOWS TO LIFE

HODGSON SEALANTS BRINGS MANCHESTER TOWN HALL WINDOWS TO LIFE

Hodgson Sealants

As part of the multi-million-pound restoration of Grade I listed Manchester Town Hall, window restoration specialist Shepley Engineers is restoring, refurbishing, repairing and replacing hundreds of historic leaded and metal casement windows throughout the site using Hodgson Sealants Metal Casement Putty and Leaded Lite Cement. Each piece of glass from the iron-framed leaded lite windows from the state rooms has been removed, cleaned, repaired – or replaced by new fabrications if necessary – and reinstated using Hodgson’s Leaded Lite Cement in Shepley’s on-site restoration studio. The metal casement windows on the lower floors have been removed to Sheffield for restoration using Hodgson’s Metal Casement Putty, a high quality, hand-applied glazing compound that is formulated or bedding and external fronting of single glass into primed steel, timber frames, sealed hardwood and concrete. It is designed to be overpainted as in this project.
Sponsored
Mast Architects, Glasgow - Airtightness Project

Mast Architects, Glasgow - Airtightness Project

BPD Building Product Design Ltd

The proposed developments followed traditional timber kit design, consisting of an outer brick skin 50mm cavity, with an internal 140mm stud frame, and using mineral wool insulation minimum 20mm service void, finished with a plasterboard lining. The brief was to achieve air permeability less than 6m3/h/m².
Sponsored
Oakgrove Housing, Milton Keynes. Featuring Deceuninck 5000 Series

Oakgrove Housing, Milton Keynes. Featuring Deceuninck 5000 Series

Deceuninck Ltd

The £1.5 million fenestration for this new housing development on behalf of Crest Nicholson Regeneration was delivered in conjunction with specialist commercial fabricator Dempsey Dyer. It features: 5,000 frames Deceuninck 5000 series Tilt and Turn 7015 Anthracite on White 0.9 U Value - triple glazing casements with special thermal reinforcement
Sponsored
CorTen Planters for Clockwork Building

CorTen Planters for Clockwork Building

EverEdge

The Clockwork Building was a complete refurb of a 1960/70’s office building, project managed by Thirdway and landscaping done by Belsize Gardens. We became involved in the early stages when Belsize Gardens and the client wanted 4 large Corten planters at the front of the building to give the entrance a more vibrant natural look.All 20 planters were made in total from 3 mm Corten steel with a folded base and a double folded top to give extra strength. In the large planters we also added 4 mm stainless steel bracing wire due to the very large amounts of soil being added to each planter. This stops possible panel movement when the soil is being tipped inside.There were four larger planters all at 60 cm high, two at 11.2 x 3.8 M and two others at 4.5 x 3.2 M. Lighting was designed into all four planters, a bench incorporated into one of the 4.5 M planters as well as a 6 bicycle stand on the most southern planter. The material had to be Corten steel and needed to be pre-rusted which was done in our EverEdge yard in Staffordshire. The supports were our standard buttress design, all at 500 mm centres. Because the back wall of the planters adjacent to the building followed the contours of the building (windows etc) there were no continuous straight lines, but a series of 90°corners. All these fitted neatly on site and resulted on minimum construction time.In addition to the main entrance planters, there were 12 more planters in the car park area, infilled between the building windows all 250 x 55 cm and 88 cm high. These planters, being smaller, were incorporated with our steel brace system.Lastly 4 large planters for the roof garden were also constructed, 150 x 110 cms and 880 cm high as well as one “trough” planter, 250 X 40 cm.
Sponsored
Anson House Residential Apartments in Westminster Receives Falco Cycle Hub

Anson House Residential Apartments in Westminster Receives Falco Cycle Hub

Falco UK Ltd

Falco recently took to the design, manufacture, supply and installation of a bespoke cycle hub based on the traditional FalcoLok-500 design. Installed at Anson House, south Westminster, in view of the River Thames, the new cycle hub has been coupled with the FalcoVert-Pro cycle rack to provide secure accommodate for up to 24 bikes.Installed on behalf of Westminster City Council, the new cycle hub features electrogalvanised perforated sheet cladding, powder coated in a Jet Black RAL colour, along with a secure access system.The whole shelter is a bespoke contemporary design of the classic FalcoLok-500 shelter, which features clean lines through the glass cladding and supported by stainless steel glass clamps. The steelwork is hot dip galvanised to BS EN ISO 1461 and also meets UK structural design laws with EN 1090 accreditation. Rainwater is collected via innovative integral gutters as part of the roof system and a bespoke bund ensure that the cycle hub is weather proof!The cycle hub was commisioned to help reduce congestion and provide greater cycling accessibility for residents of Anson House.The FalcoVert-Pro as shown here at Anson House, is a space saving cycle rack design ideal for highly popular densities such as stations, cycle hubs, shopping centres, high streets and car parks etc. Bicycles are parked semi vertically with both front and rear wheels located in a custom designed trough.Falco cycle hubs can also incorporate a world of features including; smart LED lighting, green sedum roofs, CCTV and Help Point facilities as well as numerous other cost-effective features for the cyclist such as lock holders, helmet lockers, seating and bike repair facilities. For more information about the FalcoHub cycle store, a demonstration of the FalcoSmart app-based lock, the FalcoPod bike hangar or any other Falco product, then please speak to one of our friendly customer service staff on (01538) 380080.
Sponsored
Duke Court

Duke Court

Forterra Building Products

Duke Court is a development of 37 affordable homes for rent, built on the site of Fred Styles House, formerly a sheltered housing block, providing 42 bedsits, that had been empty since 2013. The development is part of Royal Borough of Greenwich’s commitment to delivering new high-quality homes and sustainable communities.The new development of 29 houses, 7 flats and 1 maisonette creates a pretty neighbourhood of terraced houses running along Charlton Church Lane, and a series of mews streets which run perpendicular connecting into the urban fabric behind the site. Glazed screens lead into a generous open plan kitchen dining room. Stairs lead up to bedrooms and to a light and airy open plan living room with fully glazed screens leading out onto a secluded sun trap roof terrace.The buildings along Charlton Church Lane alternate in height between two, and three storeys. The houses are built from a beautiful soft and rustic brick that helps ensure that the new homes feel embedded and ‘worn in’ to the surrounding area. The brick selected was Forterra’s Ecostock Belgravia Gault Blend. Its varied tone is important for ensuring the new homes do not feel too monolithic adding visual interest, factors that were integral to reassuring planners that the brick would be sensitive to its surrounding context.Low cost, robust but high quality brick detailing is integral to the project. Traditionally built brick arches front a number of the homes and help create a semi-private space where people can put out pots and plants, wellies and umbrellas etc. Snapped headers create tightly curved external walls where the site requires thinner accommodation. Other brick details include projecting brick surrounds to pop-up windows, arched window heads, soldier and header courses, articulated parapets and beautiful angled window reveals on prominent corners.
Sponsored
A14 Integrated Delivery Team, A14/M11, Cambridge to Huntingdon.

A14 Integrated Delivery Team, A14/M11, Cambridge to Huntingdon.

Hahn Plastics Ltd

The ChallengeIn 2015 a joint venture of Balfour Beatty, Costain, and Skanksa (A14 integrated delivery team) was awarded £1.5bn by Highways England to improve the A14. These improvements included a new major 12-mile bypass, the widening of the A1 and the existing A14, improving the junctions on the A14, and building new access roads.The A14 carries around 85,000 vehicles per day; 26% of this is HGV traffic. It is frequently congested and traffic is often disrupted by breakdowns, accidents, and roadworks.As part of the A14 major scheme, a new retaining wall was needed to be constructed as new road works were encroaching on the pre-existing embankments. A durable, long-lasting, and low-maintenance wall solution with a Highway Authorities Product Approval Scheme and British Board of Agreement (BBA) certificate was required.The SolutionA vast number of EcoCrib mass gravity retaining walls are now constructed to support the embankments along the A14. The EcoCrib Mass Gravity Retaining Wall began its erection on 24th July and was completed on 10th October 2019. With a design life of over 120 years, EcoCrib is durable, and the most highly sustainable retaining solution. Designed, supplied, and installed by PC Construction, certified by the BBA and HAPAS in 2012.EcoCrib profiles are manufactured entirely from recycled UK plastic (bottle tops, car bumpers, etc) with any wastage or surplus material re-processed to form new EcoCrib profiles. Developed from timber crib technology, the 50mm x 125mm EcoCrib profiles are considerably more durable than treated timber but hold many environmental benefits.EcoCrib can be recycled when it reaches the end of its useful life.When considering solutions for developments of all kinds, the lifetime cost means EcoCrib is the more efficient choice.1838 SQM of EcoCrib was used in the scheme, equivalent to 212 tonnes of plastic waste diverted from landfill.
Sponsored
Hinkley Point, Somerset. Featuring Deceuninck 2500 Series, full EPDM and MMC

Hinkley Point, Somerset. Featuring Deceuninck 2500 Series, full EPDM and MMC

Deceuninck Ltd

This £1.4 million project delivered with specialist commercial fabricator Dempsey Dyer, is part of the Hinkley Point project and will form worker accommodation, Working with Caledonian Modular and starting Spring 2017, the project features: 1400 frames Deceuninck 2500 Chamfered Series Tilt and Turn Anthracite Grey RAL 7016 Full EPDM
Sponsored
Lawrence House

Lawrence House

Dunhams Washroom Systems

Dunhams were tasked with designing upscale, premium washrooms to complement the newly refurbished office spaceFull Height Vista flush front cubicle systemFull height IPS duct panels to conceal plumbingBespoke Solid Surface washtroughs in Corian Glacier WhiteBespoke matching HPL mirror frames
Sponsored
Food Chain and Salsa Mexican Grill

Food Chain and Salsa Mexican Grill

Rubio Monocoat UK

It was critical to specify the correct colours for Food Chain and Salsa Mexican Grill, to ensure the brand identity was standardized throughout, with no variance. Both the Rubio Monocoat Oil Plus 2C, and Hybrid Wood Protector range was applied to counters, wall cladding, bulkheads, table tops, counter fronts, chairs, benches and door frames.
Sponsored
70 St Mary Axe, London

70 St Mary Axe, London

Siderise Group

The distinctive, semi-elliptical shape of the new 90m high glass and steel office building at 70 St Mary Axe in London required proven passive fire protection and acoustic solutions that could fit with the unique curved frame. Leading manufacturer of fire, acoustic and thermal insulation products, Siderise, met the challenge.
Sponsored
Grace Farms

Grace Farms

United Anodisers Ltd

Descending into a valley at Grace Farms in New Canaan Connecticut, The River consists of five volumes linked together by a single curving roof. SANAA designed the project with Handel Architects serving as the executive architect. The new building provides a sanctuary, library, court, commons, and pavilion, all under an aluminium roof by Zahner.Previous collaborations with SANAA Ltd include the facade on the museum of contemporary Art in New York.
Sponsored
Shopping Mall - The Avenues - Kuwait

Shopping Mall - The Avenues - Kuwait

Barrisol

This "Mall", the largest in Kuwait, was thought of as a work of art, everything is cared for, and so are the ceilings. If you do not pay attention to details you might think it's concrete, but no, it's indeed Barrisol stretch ceilings that cover most of the center. Barrisol membranes offers as always a lot of advantages: The work time has been reduced The weight of the structure has been lowered Aesthetics is neat A feat only possible thanks to Barrisol.
Sponsored
FalcoBloc Picnic Table - Manchester City Football Club

FalcoBloc Picnic Table - Manchester City Football Club

Falco UK Ltd

Back in 2010, the picnic tables formed part of the club’s new development for a City Square entertainment zone, a vibrant and state-of-the-art fan experience which was a new concept in British football, located on Joe Mercer Way outside the City store. Thirty nine FalcoBloc benches were supplied along with another 20 robust FalcoSwing tables to form a seating and ‘perch’ arrangement at the Blue Moon Café. 
Sponsored
Institute of Oncology and Radiology

Institute of Oncology and Radiology

Knauf Ceiling Solutions Limited

Pushing Forward WellbeingThe Belgrade-based Institute of Oncology and Radiology symbolises hope in the fight against cancer. It sets a new standard with state-of-the-art equipment and a room concept designed for patients first, pushing forward wellbeing as a constitutive element of patients' recovery.With the support of our ceiling experts in Serbia, Knauf Ceiling Solutions provided 1,200sqm of acoustic solutions for the clinic building with a strong focus on hygiene requirements.
Sponsored
Leicester City Football Club Training Ground

Leicester City Football Club Training Ground

Siniat

Siniat delivers high-performance, full system for landmark training facility  Siniat played a significant role in supporting the construction of one of the most modern, state-of-the-art training facilities in Europe. Built from the ground up on the site of a former golf course, Leicester City’s new training ground was designed to be an iconic landmark building, providing a platform for success, growth and development for the next generation of sportspeople.  
Sponsored
Cineworld, Bracknell

Cineworld, Bracknell

Siniat

12-screen Cineworld multiplex is a state-of-the-art immersive cinema with a 4DX screen that stimulates all five senses with special effects such as wind, water and smell. Siniat worked closely with project architects Chapman Taylor, main contractors Mace and drylining contractor Fireclad to develop a high-performance drylining system for this high-tech facility, providing expert advice throughout the eighteen-month build period.
Sponsored
City Centre Campus, The Manchester College

City Centre Campus, The Manchester College

Taylor Maxwell

In the heart of Manchester, a new 5-storey campus has been completed to provide additional facilities for higher and further education students in the Creative and Performing Arts sectors at The Manchester College. We were delighted to work alongside SimpsonHaugh, Bond Bryan Architects, Willmott Dixon and Longworth Building Services on this significant project, supplying several thousand square meters of Corium brick cladding to complete the contemporary facade.
Sponsored
Erasmus Brussels University

Erasmus Brussels University

Soundtect

The new campus of the Erasmus Brussels University of Applied Sciences and Arts is located only a few steps away from the Dansaertstraat. This iconic design is a treat for lovers of minimal design with exposed concrete and very monochrome colour palette. The new campus of the Erasmus Brussels University of Applied Sciences and Arts is located only a few steps away from the Dansaertstraat designed by Architects B-Architecten, B-bis Architecten and B-city.The new campus hosts more than 1000 students. The 2 auditoriums, 40 subject classrooms, the teachers’ rooms, a study landscape, a library, a cafeteria and several sitting corners and terraces are now located in a trendy and lively city district.The building is a prominent and transparent construction with a heavy-set finishing touch. On the ground floor, the openness is transposed by a sunken and covered recreation ground. This big interior space is connected to the square in front of the building. Most public areas such as the students’ cafeteria, the library, the students’ administration office and several meeting areas border the recreation ground. The building opens up towards the square and the entire neighbourhood thanks to a full glass façade.
Sponsored
Park Hill Estate, Sheffield

Park Hill Estate, Sheffield

Keim Mineral Paints Ltd

The Park Hill Estate in Sheffield was built as a council estate between 1957 and 1961. It was designed by Jack Lynn and Ivor Smith in a brutalist architectural style and has always divided opinions.Described as revolutionary for its time, the concept was `Streets in the Sky` with wide deck areas and distinctive concrete frame.  Whilst demolition of the site was being considered, in 1998 the estate was listed by English Heritage and given Grade II* status which was considered very controversial and attracted much criticism.  It is the largest listed building in Europe and, with its protected status, it was decided to renovate and redevelop the site as a joint venture between Urban Splash and English Heritage.The future of the scheme was to develop the site into desirable upmarket apartments, business units and social housing and the success has been widely publicised, including features in almost all architectural and concrete magazines, with a shortlisting for the 2013 RIBA Stirling Prize & 2023 RIBA Yorkshire awards, as well as winners of the AJ Retrofit Awards 2023.The key involvement for KEIM Mineral Paints was renovation of the extensive concrete frame. The discoloured concrete gave a drab and dirty look to the building – not the desirable, upmarket effect that the designers were looking for. The first consideration was to paint the frame in its entirety but this would have led to the loss of what is considered to be the most iconic feature of the building. So the challenge was to renovate the frame, improve the colour and finish without creating a painted effect.The answer was to use KEIM Concretal Lasur. This innovative paint system is a colourwash or stain which is applied onto concrete to cover blemishes and enhance the appearance, whilst, most importantly, keeping the look of natural concrete. KEIM Concretal Lasur has all of the features integral to KEIM Mineral Paints such as a permanent and highly protective chemical bond, complete UV stability and resistance to mould and fungal growth.KEIM Concretal Lasur is diluted with a complementary product using differing ratios and opacities to achieve the required colour and coverage, whilst still enabling surfaces to look like unpainted concrete. The system can also be employed to minimise any unsightly repairs to concrete. The versatility of the system allows almost complete coverage of repairs, or slight coverage, if preferred, which enhances the natural look of the concrete but gives the effect of a more visually appealing finish.
Sponsored
UltraCrete repairs troublesome chamber on busy London road

UltraCrete repairs troublesome chamber on busy London road

Instarmac Group plc

Road users in Kensington Church Street in Bayswater, are now enjoying a peaceful commute after Openreach and Centercomms Ltd replaced a long-standing failed access cover using UltraCrete’s market-leading access cover reinstatement materials.BackgroundClient Openreach, and contractors Centercomms Ltd, were once again required to repair a failed ironwork chamber on a busy central London street – the longest standing failed unit on their work stack.The ChallengeThe troublesome unit was located on Kensington Church Street in Bayswater – an extremely difficult and busy area in Central London. Working in London can be challenging as traffic management permits can be difficult to obtain and, due to heavy traffic, all work must be completed within 9.30am – 3.30pm.As well as a tight turnaround, upon arrival it became clear very quickly that chamber was damaged and the brickwork needed to be excavated.The SolutionWith this in mind, contractors Centercomms Ltd, working for, and on behalf of, Telent, chose to use UltraCrete’s market-leading maintenance solutions to replace the failed unit. UltraCrete has a reputation of providing the industry with expert and approved materials that reach required compressive strengths very quickly, helping operatives to complete installations before the 3.30pm deadline.To begin, the damaged brickwork was removed and timber shuttering installed using UltraCrete QC10 F. This fast, strong and easy to use flowable concrete provides an extremely robust repair in just 20 minutes.Using the SG Pam Install Plus frame installation system, Centercomms Ltd carefully placed the frame and used a string line to ensure it was level with the existing road surface.Once in position, Envirobed® CD534 Red high performance bedding mortar was applied to the inner face and chamber top and the timber shuttering was then placed 50mm beyond the flange.After Envirobed® CD534 Red had fully cured, Envirobed® CD534 Flowable Red was mixed and poured to fully bed and encapsulate the frame to a minimum depth of 35mm.To complete the installation, operatives returned the lid into position, applied SCJ seal and tack coat spray to the vertical edges of the existing road surface and frame ahead of the asphalt reinstatement.ResultsThe entire installation took just two and a quarter hours to complete, much to the delight of the client, contractors and road users.
Sponsored
South East Water Reservoir - Kent

South East Water Reservoir - Kent

SMR PROJECTS LIMITED

The reservoir had an estimated 180 metres of cracks that needed repair, as well as the main element of the concrete that required coating to waterproof and add durability to the concrete structure. The Reservoir was taken out of commission but it needed to be returned to service as soon as possible. To do this, we looked at the order of the processes to ensure the tight time frames could be met.  
Sponsored
LivePicture living plants artistry brings fresh air and well-being to Bristol office

LivePicture living plants artistry brings fresh air and well-being to Bristol office

Mobilane

A contemporary office environment demands a number of important considerations; functionality, aesthetics, space, accessibility and wellbeing.  Ticking all of these boxes are the multiple LivePicture installations at the headquarters of Ultraleap, a technology company in Bristol. A framed piece of artwork with living plants, LivePicture has brought foliage, freshness and visual impact to the offices, thanks to installers Inleaf.

Showing 505-533 of 533

Feedback