NBS Source
I'm a manufacturer

"ductwork fire dampers and ancillaries"

4,080 results found

Sort by:

Showing 469-504 of 509

Sponsored
MOL campus - Floor and more G40 and NORTEC

MOL campus - Floor and more G40 and NORTEC

Lindner Group

The Lindner Group took on a key role in the construction of the MOL Campus. Around 33,000 m² of the FLOOR and more® G40 hollow floor was installed in the high-rise building. The entire system complies with the REI 60 fire protection requirements and can therefore withstand a potential fire for a full 60 minutes, which makes a huge difference in an emergency. In addition, Lindner installed around 1,200 m² of NORTEC control room systems for the server rooms. The implementation of the project required extremely precise coordination on site, especially in close cooperation with electricians and other trades. In addition, there was a particularly tight schedule: At times, up to 2,500 m² of floor were delivered per week. However, with excellent teamwork, these challenges were quickly overcome and the project was completed within a very short time.
Sponsored
Whitechapel Station - The Elizabeth Line - The Full Story

Whitechapel Station - The Elizabeth Line - The Full Story

Teckentrup UK Ltd

Doors in underground stations not only have to meet fire protection, security and safety requirements, but in particular they have to be able to handle pressure. This was also one of the key requirements for the doors of the new Crossrail stations in London. Here, security doors were required that had to be fire, sound and pressure resistant. Teckentrup was able to offer appropriate door solutions with corresponding conformity, which also complied with the revised, stricter version of LPS 1175 for proof of product certification. In addition, all required values for soft impact tests, structural strength data, „U“ values, cycle tests and life cycles could be met. This tipped the scales in favour of the German manufacturer when the project was awarded and, with the stations Whitechapel and Liverpool Street marked the start of a successful collaboration.
Sponsored
Royal Papworth Hospital

Royal Papworth Hospital

SuperFoil Insulation

The unique and stunning curved blue glass cladding specified for the new hospital posed several design challenges. The insulation used needed to provide high thermal performance, be able to conform the curved surface and be completely non-combustible since the building is in excess of 18m. SuperFOIL Insulation was approached to provide replacement insulation that would meet all fire safety standards and which could be applied without requiring changes to the exterior or interior design of the building. After careful consideration as to what would be the most suitable solution, we supplied 5,500m² of our non-combustible SFNC insulation. SuperFOIL SFNC is the only insulation of its kind to be certified by the Building Research Establishment (BRE) as European Class A1 Non-Combustible, which is the highest possible rating of fire safety.
Sponsored
ROYAL PAPWORTH HOSPITAL

ROYAL PAPWORTH HOSPITAL

SuperFoil Insulation

The unique and stunning curved blue glass cladding specified for the new hospital posed several design challenges. The insulation used needed to provide high thermal performance, be able to conform the curved surface and be completely non-combustible since the building is in excess of 18m. SuperFOIL Insulation was approached to provide replacement insulation that would meet all fire safety standards and which could be applied without requiring changes to the exterior or interior design of the building. After careful consideration as to what would be the most suitable solution, we supplied 5,500m² of our non-combustible SFNC insulation. SuperFOIL SFNC is the only insulation of its kind to be certified by the Building Research Establishment (BRE) as European Class A1 Non-Combustible, which is the highest possible rating of fire safety.
Sponsored
An innovative design for Great Ormond Street Hospital, London

An innovative design for Great Ormond Street Hospital, London

Dortek Ltd

The children’s hospital is the largest centre for child heart surgery in the UK and one of the largest centres for heart transplantation in the world. The hospital is constructing a new building which will contain an Intraoperative Magnetic Resonance suite as well as physiotherapy and rehabilitation facilities. The suite will enable surgical teams to check whether complex procedures have worked, before patients wake up.Dortek supplied our specialist hybrid doors which are hygienic, lead-lined, fire-rated, automated and hermetically sealing. Our doors are specifically constructed for high hygiene areas and are completely free from timber or other organic materials which can harbour bacteria. The doors play an essential role in preventing cross-contamination as well as providing certified fire and x-ray protection and ensuring safe and efficient access for patients and staff.
Sponsored
Little John's Farm

Little John's Farm

Eternit

Eternit has supplied fibre cement sheeting in Sherwood to a new livery stable in Reading, Berkshire. The previous stable had burnt down during a ferocious fire, which was fuelled by bitumen based roofing materials used on the original building.
Sponsored
Llwnderw School

Llwnderw School

Marley Ltd

Western Red Cedar Shingles with FRT Exterior® Fire Retardant Treatment (AA Rating) provided the Welsh Primary School in Swansea with feature cladding to the curved external walls, in order to create what the architect described as a ‘cedar shell’.
Sponsored
The Landmark

The Landmark

SE Controls

An iconic and popular residential development in the West Midlands, The Landmark at Brierley Hill, is using smoke control systems from SE Controls to ensure escape routes are kept free of smoke in the event of a fire, allowing residents to exit the building safely.
Sponsored
Nakheel Mall

Nakheel Mall

SE Controls

Nakheel Mall, Dubai’s 435,000 sq.metre retail and lifestyle centre located in the unique Palm Jumeirah development, is using control solutions and 192 actuators from SE Controls as part of the fire safety and smoke control system at the new complex.
Sponsored
Dunfermline home makes the switch from oil to a heat pump

Dunfermline home makes the switch from oil to a heat pump

Grant Engineering (UK) Ltd

A Grant Aerona³ air source heat pump has been installed at a cottage in Fife, transforming the home’s heating from an oil-fired system to a renewable alternative. The homeowners are now enjoying a warm home while also lowering their carbon footprint.
Sponsored
Hampton School

Hampton School

SE Controls

A new sixth form study and careers centre at Hampton School in South West London is using a combined ventilation and smoke clearance system from SE Controls to help provide a comfortable learning environment with enhanced fire safety for students and staff.
Sponsored
Emaar Address Residence Skyview Terraces

Emaar Address Residence Skyview Terraces

Lorient

Emaar Address Residences Skyview Terraces is a striking hotel, residence and serviced apartment twin-tower complex offering 360-degree vistas of Downtown Dubai.Lorient supplied its intumescent protection kits, fire seals and LAS4001 threshold plates.
Sponsored
Shakespeare's Globe Theatre

Shakespeare's Globe Theatre

Lorient

Shakespeare's Globe is a reconstruction of the Globe Theatre, an Elizabethan playhouse for which William Shakespeare wrote his plays, in the London Borough of Southwark, on the south bank of the River Thames.Lorient supplied a range of fire and smoke resistant sealing systems to this historical venue.
Sponsored
Romanian National Library, Bucharest

Romanian National Library, Bucharest

Advanced

The priceless collections of the new National Library of Romania, a landmark building in the heart of Bucharest, is protected by ExGo suppression control panels from Advanced.The new library building, which contains more than 13 million individual items, was started in the 1980s but work was halted after the 1989 revolution, only starting again in 2009. Completed and opened in 2012, the building has now been fully equipped with the latest technology, including the ExGo system.ExGo, Advanced’s ultra-dependable extinguishant release system, was configured and installed in the National Library building by Helinick, a key player in the Romanian fire and safety market. The suppression control system comprises 47 inter-linked ExGo panels with LCD displays, LED indicators and manual release buttons.The ExGo panel integrates with the Library’s fire system, which includes over 600 optical smoke detectors, 100 sounders and 200 call points. The ExGo panels monitor and control the valves that release up to 20 tonnes of NOVEC 1230 fire protection fluid. The ExGo range from Advanced has been developed specifically for sensitive and strategic assets such as server rooms, historic and cultural attractions and control rooms. The patented ExGo Extraction Software also allows users to download system status information and event logs, providing a quick and customisable data solution.
Sponsored
Stronelairg Wind Farm Case Study - Promat, Duratseel

Stronelairg Wind Farm Case Study - Promat, Duratseel

Promat UK

As a leading provider of renewable energy across the UK, SSE Energy Services aims to drive the transition to a net zero carbon world through the development, construction and operation of state-of-the-art renewable energy assets. To support this mission, in 2017 SSE built a wind farm in Stronelairg - a remote area of Scotland near Loch Ness. At an elevation of around 600 meters above sea level, it is one of SSE’s windiest sites. The site includes 66 wind turbines and has the capacity to generate 228 MW of energy.As part of the project, SSE needed to create three transformer enclosure bays on the site, each of which had to meet a demanding four-hour fire-rated standard. This required the installation of walls and ceilings - as well as internal access doors for maintenance personal - that would all meet this high-level of fire resistance. It was also necessary that various penetrations, including wall bushings, were able to safely pass through the barriers in the enclosure bays.An additional challenge was that the project would have to be completed in an isolated setting where the work would be constantly exposed to cold, wet weather conditions. Having worked with Promat and its products for more than a decade, the project’s subcontractor, Invicta, knew its fire protection solutions would be a perfect fit for the wind farm’s unique requirements.
Sponsored
Dagenham Flats

Dagenham Flats

Sertus

United Living approached Sertus to supply automatic smoke ventilation products for all seven blocks, to keep fire escape routes via stairwells and communal corridors free from smoke in the event of a fire.Project Name: Dagenham FlatsLocation: East LondonSector: ResidentialClient: London Borough of Barking & DagenhamInitial BriefUnited Living is one of the UK’s leading providers of refurbished and new build dwellings. The company was tasked with the refurbishment of seven apartment blocks in the London borough of Dagenham and Barking. As multi-storey blocks occupied by demographically-diverse residents, including families and the elderly, the requirement for safe escape routes in the event of a fire was clear; and the existing ventilation within this 1970's building had been identified as less than optimal.Sertus' Façade Louvre Blade (Glass) vents were used in this project. View the product here.OutcomeThe addition of windows has improved overall quality of life in the building by introducing more natural light, increasing ventilation and comfort, and reducing the energy costs associated with both.Fitting into the existing window frames and supplied with full wiring schematics, the window vents proved simple and speedy to install, which kept costs down and reduced disruption for residents during the scheme of works. All products are certified to residential building regulations, including EN12101-2, delivering total peace of mind for client, contractor and residents alike.
Sponsored
Case Study - Proteus Pro-Felt® - City Tower

Case Study - Proteus Pro-Felt® - City Tower

Proteus Waterproofing

City Tower, a private apartment tower block located in Canary Wharf required a new high performance waterproofing system as the existing single ply roof had been damaged beyond repair due to a fire. To provide a cost effective, long term waterproofing solution, Proteus Waterproofing specified a Hybrid Tapered Insulation Scheme with a Proteus Pro-Felt® finish, meeting the client’s specific requirements.High Performance WaterproofingAs the existing roof was beyond repair, it needed be completely stripped. Pro-Prime® SA and Proteus Pro-Felt® Self Adhesive Underlay were used as a vapor control layer. Proteus Pro-Therm EPS and Proteus Pro-Therm PIR were used for the Hybrid Tapered Insulation Scheme and bonded using Pro-Bond Foaming Adhesive. Proteus Pro-Felt® 3mm Plain Underlay was then fully adhered to the insulation, followed by a final installation of Proteus Pro-Felt® Ultima Plus Fireguard. Proteus Waterproofing worked closely with the Proteus Approved Contractor to ensure the project was delivered to a high standard.Health & SafetyWhen working on residential buildings, safety is always of utmost importance. Proteus Pro-Felt® Ultima Plus Fireguard has the highest European Fire Rating, BROOF(t4), making it the ideal felt to use on residential properties as the risks to operatives, building occupants and members of the public are greatly reduced. All Proteus Waterproofing specifications promote fire safe installation methods conforming to the industry lead Safe2Torch guidelines.Long Term PerformanceProteus Pro-Felt® Ultima Plus Fireguard is a high-performance multi-layer bituminous membrane system, tested to perform in extreme temperatures and weather conditions. It has class leading modified bitumen content which allows the flexible membrane to move with the building and ensure long term durability and performance. It is certified by the BBA to be in excess of 30 years, and had the highest European Fire Rating – BROOF(t4).
Sponsored
Holy Rosary School

Holy Rosary School

SE Controls

A new 1000 seat multi purpose entertainment and sports centre at Holy Rosary School in Johannesburg is using precision automatic window actuators and control systems from Durban based SE Controls Africa, to provide effective smoke ventilation in the event of a fire.
Sponsored
Electricity House

Electricity House

SE Controls

Electricity House, Crest Nicholson Homes’ stylish city centre apartment development in Bristol is using an advanced smoke ventilation system from leading smoke and natural ventilation specialist, SE Controls, to help keep residents safe if a fire should occur.
Sponsored
Paradise Street

Paradise Street

SE Controls

A £52 million student accommodation development in Coventry is using smoke and heat exhaust ventilation (SHEV) systems from SE Controls to enhance fire safety by providing smoke free escape routes for almost 1000 students living at Paradise Student Village.
Sponsored
Speedwell Baths - social housing for local people

Speedwell Baths - social housing for local people

HAG Ltd. - The Door Specialists

Speedwell Baths were originally opened in 1937, and quickly became a beloved recreational spot for hundreds of Bristol City dwellers for more than 7 decades. Unfortunately, in 2005, Bristol City Council made the decision for the Baths to close. Subsequently, the site remained abandoned for several years until their demolition in 2019.This paved the way for a new five-storey complex comprising 31 affordable homes, featuring a mixture of 1 & 2 bedroom apartments.This signifies the successful conclusion of a vital revitalization initiative for the local community, bringing much-needed affordable housing to Bristol. PARTNERSHIPThe architectural design for this development was entrusted to Angus Meek Architects, a Bristol based firm, who worked alongside Bristol City Council & property developer, Crossman Homes, to bring the project to fruition.HAG Ltd was successfully awarded the contract & crucial responsibility of delivering security and fire protection door solutions throughout the five-story building, leveraging our expertise and track record. THE PROJECTWork on site began in 2019, starting with the dramatic demolition of the historic swimming pool and the building was eventually completed & handed over to Abri Housing Association in January 2022.The front of the building is designed as an "art moderne" style but incorporating elements of art deco detailing from the original Baths, demonstrating that the development has been thoughtfully designed to enhance the area, reflecting the style & shape of the existing building in a contemporary way.HAG Ltd. were delighted to have been chosen to work on such ground-breaking local development and were keen to assist in the design & installation of high-end security & fire protection products that could aesthetically compliment the design & style of the building.Steel doorsets are versatile, can provide high levels of security, as well as fire protection tested to BS EN 1634, and offer excellent value for money. Bespoke options that were utilised on his project, were louvered doors, communal doors & insurance certified doors, which conform to LPS1175.Louvered doors allow for bi-directional airflow, a medium level of security and can be fully customisable to meet your specification. This was key in this project, to allow ventilation to various secure plant rooms across the site and offer a bespoke colour option, so doors can blend seamlessly into their surroundings.In a busy City complex of 31 apartments, secure yet robust communal entrance doors are a necessity to allow for a high level of pedestrian traffic throughout the day. Double glazing panels allow for through vision and locking systems can be adapted to include access control.Our Fireguard Fire Resisting steel doors gave Speedwell Baths fire protection & high levels of security. Fire protection can be guarantee from 60 to 240 minutes and these doors are certified to BS EN 16034. HAG Ltd. hold the CERTIFIRE certification as well as being FIRAS installation certified – one of only a few installers in the UK to hold such a highly sought after accolade. Sean Gill, management company manager at Abri, one of the largest housing providers in the south, said: “Our new development on the Speedwell Swimming Baths sites will provide further much-needed affordable housing in the city."
Sponsored
Door closer air pressure and excessive smoke seal issues - how to solve?

Door closer air pressure and excessive smoke seal issues - how to solve?

Rutland

Since the Grenfell tragedy in 2016, there has been an increased focus on fire-safety compliance in all communal buildings. This focus sharpened even more when, early in 2018, the media unearthed evidence of some non-compliant products having been installed there, including internal fire doors that had been fitted without smoke seals. As a result, there has been heightened attention on every aspect of safety, not least on fire doors. Fire officers and building management personnel understandably want to ensure they have covered every possible safety angle.To this end, they are now often insisting on going beyond the specifications required by regulations.However, in trying to ensure doors provide the maximum protection against fire and smoke, another potential problem can arise that, if not addressed, can undermine those good intentions.The problem:One of our customers, a door manufacturer and installer, had recently supplied doors but then been informed by their customer that they were not successfully self-closing as they were meant to. The assumption was that the door closer was not performing correctly, so the ‘fault’ was relayed to Rutland with a request for a resolution. We agreed to visit the site swiftly to assess the situation. Our inspection found that the door closer was correctly specified for the width and weight of the door, but that the smallest possible door gaps had been specified. These, coupled with substantial smoke seals around the doors, were causing significant resistance to the doors closing. Although the resistance was due in part to the physical aspects of the small gaps and the seals, the main problem was actually the build-up of differential air pressures on either side of the doors.Given the increased focus on maximum fire defence at doorways on all new-builds and building refurbishments, this problem is arising ever more frequently. Tighter door seals have the effect of creating separate, near air-tight pockets within a building, each holding air at slightly different pressures. The bigger the building, the more such pockets and the greater the pressure differentials that can potentially build up.These pressure differentials can have a significant additional effect on the amount of force needed to close each door and must be taken into account when choosing and setting closers.The Rutland response:Rutland’s technical team attended the site as required to support the customer in achieving a solution, first to identify the issues with air pressures and then recommend and implement a solution to the problem.Initially, we made hinge and latch adjustments to the door sets to overcome some of the resistance. This proved to be insufficient to ensure all the doors correctly closed first time, so we advised upgrading to stronger door closers. This recommendation was supported by supplying the door manufacturer with relevant data from previous tests on an equivalent door set to verify the product’s suitability.The new closers were delivered to the site and our technical team remained on hand to provide extensive assistance with the installation. Rutland created a bespoke jig to aid the door manufacturer’s installers in fitting the replacement door closers, significantly cutting down the time it took to rectify the problem.Outcome and key learning points:The project was successfully brought back on track, to the full satisfaction of the property owner and the door set manufacturer. All doors now function as they should and are delivering the intended fire safety for all building occupants.This case highlights that, due to heightened protective sealing around doors, there is an increasing likelihood of air locks forming in buildings, which means that specifying of door closers cannot be based simply on weight and width of doors, as has traditionally been the case. The pressure differentials that result vary building by building, based on each one’s layout, so it necessitates careful assessment to ensure that appropriate closers are specified.
Sponsored
EUROSPAR, Ireland - Firetite Case Study

EUROSPAR, Ireland - Firetite Case Study

ECON Building Products – BASF Distributor

After considering various products, PABIA Consulting engineers chose FIRETITE as the ideal solution for upgrading the Newtown EUROSPAR building complex in Cobh, Co Cork. FIRETITE met the insulation requirements, fire regulations, and could be retrofitted externally with minimal disruption to tenants and customers.
Sponsored
Vibrant Green decors chosen for doors throughout school

Vibrant Green decors chosen for doors throughout school

Formica Group

Four Formica® Laminates were specified for fire doors in Octavia House School, an independent specialist therapeutic school based in Essex, UK. Doors were designed for high traffic areas including classrooms, offices, toilets and communal spaces such as corridors and halls.
Sponsored
Matlosana Mall

Matlosana Mall

SE Controls

The smoke ventilation system at Matlosana Mall, shopping and entertainment centre in Kerksdorp, South Africa is using SE Controls’ window automation and control panel solutions to ensure it operates perfectly in the event of a fire, allowing smoke-free escape routes to be maintained for shoppers and staff.
Sponsored
Deansgate Square

Deansgate Square

SE Controls

Deansgate Square, one of Manchester’s highest profile city centre residential developments, is using mechanical smoke control and ventilation solutions from SE Controls to protect residents by keeping corridors, stairwells and escapes routes clear of smoke, should an apartment fire occur.
Sponsored
The Hippodrome Casino

The Hippodrome Casino

Lorient

Following a £15 million restoration of the Grade-II listed building, renovating and transforming the site, the UK’s largest casino and entertainment venue opened in 2012.Lorient supplied LAS8001 si automatic drop seals and DS acoustic, smoke and fire seals to this historic site.
Sponsored
Riser Doors and Access Controlled Doors for Multi-level Data Centre

Riser Doors and Access Controlled Doors for Multi-level Data Centre

EBD Steel Doors (formerly Eurobond Doors)

We were approached to design & manufacture a range of steel fire-resistant riser doors and personnel doors for Europe's most advanced data centre, located in Canary Wharf, London.This 8-storey building offers 73,400 sqm of space - they needed simple yet secure riser doors to provide fire protection to the internal ducts, containing all the cabling and plumbing required in a sleek, discreet solution that provided maximum access, performance and safety.Alongside the riser doors, Eurobond designed & manufactured personnel doors that could be electronically controlled to control the access and provide an audit trail of personnel movement.The 2 key elements of this project were the riser doors - and the sheer volume required to cover the 8 levels and the access control requirements that had to be well planned and coordinated by Eurobond, the security contractor, end-user and architect.
Sponsored
West End Gate, London

West End Gate, London

OBEX Protection Ltd

Location: LondonMain Contractor: Berkeley Homes LtdWest End Gate is a mixed-use development by Berkeley Homes Ltd on Edgware Road in London W2, near the prestigious neighbourhoods of Marylebone and Little Venice.The development comprises 844 apartments (including 175 affordable), 8 shops and a restaurant, along with a new public plaza and improvements to Edgeware Road Junction.The full OBEX CORTEX Class A Through-Wall System has been specified on this project, including fire-classified Breather Membrane, Vapour Control Layer, Interface Sealing Membrane system, and the Score'N'Snap Cement Board system.With each OBEX product carrying a Class A fire-classification, it puts this façade installation by OCL Facades Ltd at the pinnacle of full compliance and highest performance.Residential Apartments: 844Buildings: 8Storeys: 29
Sponsored
The Schwarzman Centre

The Schwarzman Centre

Fosroc International Limited

THE PROJECT The Stephen A Schwarzman Centre is a new state-of-the-art performing arts and exhibition development that will house the University of Oxford’s Humanities department. The architect, Hopkins, is well known for designing environmentally efficient buildings, and the main contractor Laing O'Rourke has a wealth of experience of building large complex structures. Fosroc was invited to provide a full waterproofing system for a two-level basement due to their technical expertise, customer care, and proven products. Three forms of waterproofing were proposed; pre-applied membrane, waterproof concrete and a cavity drain system. The project also included a complex detail where the new basement needed to punch through the secant wall into an adjacent basement. THE SOLUTION Fosroc entered into an early design development phase with Laing O'Rourke to progress the waterproofing design and overcome some of the particularly challenging aspects of the scheme. Design meetings were held to address these issues in advance of the scheme going to site. The primary protection proposed for the base was the robust Type A Proofex Engage pre-applied fully bonded membrane. Its unique mesh system allows a full bond to concrete and prevents water tracking between the concrete and membrane. Type B watertight concrete containing Supercast WCP – an integral hydrophobic pore-blocking admixture was used as secondary protection for the base and primary protection for the walls. Secondary protection for the walls was provided by the Type C Proofex Cavitydrain drained cavity system, that channels water ingress into the basement drainage system. Laing O’Rourke then appointed Fosroc’s in-house design service WDS to complete the design with the required professional indemnity insurance cover. WDS has delivered a fully detailed coordinated set of design drawings to detail the waterproofing installation, helping Laing O'Rourke to complete to the very highest standard. THE BENEFITS Fosroc were able to calculate approximate quantities for the scheme, including all ancillary items. This, coupled with a planned project programme enabled the supply of materials to be accurately scheduled, avoiding delays and improving the level of cost certainty for the client. By using the three types of protection, the basement of the four-storey academic building is afforded the maximum level of long-term protection against water ingress. The installation team have been very satisfied with the design provided by WDS, and the products and service received from Fosroc throughout the installation.
Sponsored
Klasse G-board | Castle Exchange, Nottingham

Klasse G-board | Castle Exchange, Nottingham

Klasse Group Ltd

Cladding is being replaced on a flat block in Nottingham’s Hockley after it was found to contain similar insulation material as Grenfell Tower. Klasse G-board has been chosen as part of the re-clad project, especially for its A1 fire-rated, fully non-combustible properties.
Sponsored
Glen Ord Distillery, Scotland

Glen Ord Distillery, Scotland

Nullifire – a brand of Tremco CPG UK Ltd

One of Scotland’s most famous whisky distilleries is undergoing an ambitious redevelopment project in order to meet increased demand from overseas. The steelwork for the new build elements of the work are being given fire protection using Nullifire’s revolutionary new one coat intumescent SC902 system.
Sponsored
HOTEL AND LEISURE - SMUGGLERS COVE, BOURNEMOUTH - EXTERNAL STAIR NOSING

HOTEL AND LEISURE - SMUGGLERS COVE, BOURNEMOUTH - EXTERNAL STAIR NOSING

Quantum Flooring Solutions, a trading name of Quantum Profile Systems Ltd

Smugglers Cove Adventure Golf is a tourist attraction at Bournemouth Beach. The 18 hole course is part of Bournemouth’s famous seafront, which has over 7 million visitors per year. For safety purposes, it was necessary to fit Stair Nosings onto a fire exit staircase at the site.
Sponsored
Easy Evacuation!

Easy Evacuation!

C-TEC (Computionics Limited)

C-TEC’s revolutionary new evacuation alert system, EVAC-ALERT, has been specified for a new purpose-built residential building in London.Located in the Elephant and Castle area of the London Borough of Southwark, Joyce Newman House is an 8-storey block of 40 spacious living spaces commissioned by Leathermarket JMB, Southwark’s largest resident-managed housing organisation. The affordable-housing development also features landscaped gardens, an interactive playground and a communal kitchen garden for residents to grow their own vegetables.Specified and supplied by Churches Fire & Security working alongside Blu Electrical Installations Ltd, C-TEC’s EVAC-ALERT has been designed to comply with the new BS 8629, which recommends evacuation alert systems be installed in all new blocks of flats over 18 metres to assist the Fire and Rescue Service (FRS) in evacuating part or all of a building in an emergency.The system consists of a 2-loop control panel connected to a host of single and multi-way interface units, self-testing sounders and visual indicators. Simple and intuitive with manual controls to allow firefighters to easily operate the evacuation alert devices located inside flats on a zone by zone or floor by floor basis, the panel is stored in a secure vandal resistant cabinet which can only be accessed by the FRS using a special copy-protected key.David Collins, Project Manager at Churches Fire & Security, said: “Evacuation alert systems ensure firefighters can alert occupants in a building of the need to evacuate if a fire gets out of control. The EVAC-ALERT system we’ve specified provides peace of mind for residents and, crucially, also demonstrates that building management have taken every precaution possible to protect the people residing in the property. Our client is delighted with the system.”Certified to all relevant EN54 product standards, EVAC-ALERT is powered by C-TEC’s CAST protocol and fully compatible with ENVISION, its powerful new cloud-based remote access data management software which can be used to provide duty holders with a verifiable audit trail of system activity and device testing.
Sponsored
Ensign Court High Rise Decking

Ensign Court High Rise Decking

EnviroBuild Materials Ltd

Being positioned along The Highway, a major east-west route into central London, Ensign Court is a 14-storey high-rise build that symbolises the beginning of London’s heart, welcoming people into its urban core and existing as an important representation of its character.With this metropolitan embodiment in mind, the development is a statement of modernity and urbanity, requiring contemporary designs and cutting-edge materials to establish a framework of quality and character, to accompany its remarkable location.Project BreakdownHaving been previously occupied by commercial space, Ensign Court was rebuilt to offer 65 residential units designed to accommodate for affordable rent, shared ownership and private sale, as well as 7 units of new commercial space on the ground floor. To support its modern appeal, the project was intended for Class A use and therefore required an effective non-combustible balcony solution that would enhance its stylish aesthetic and ensure durability for the safety of its residents.The SolutionBeing compliant with the latest fire safety law, Hyperion Aluminium 145 Pro-Grip aluminium decking was used to furnish the 520 m² of balcony and terrace areas on this build, complete with fire-rated edging, joists, pedestals and screws. This beautifully engineered A2 fire-rated aluminium decking board was used in the colour Dusty Grey, perfectly fitting the contemporary aesthetic of the Ensign Court build with elegance, simplicity and style. With market-leading value and Qualicoat certified power coating, this non-combustible decking system was the ideal addition to this exquisite development, offering assured safety, high slip resistance and refined aesthetics.EnviroBuild will continue to push towards the ever-improving innovation of non-combustible systems, and strive to lead the rise of safer, fire-rated solutions for both commercial and residential construction.Project DetailsSize: 520 m²Product: Dusty Grey Hyperion 145 Pro-Grip, MESA Non-combustible Pedestals, MESA Aluminium Joists, Aluminium Edging, MESA Protective Membranes, Screws, FastenersContractor: ENGIEArchitect: Maccreanor LavingtonDeveloper: L&QLocation: London
Sponsored
Albion Works, Manchester

Albion Works, Manchester

K Systems Insulated Facades

BackgroundLocated in the Ancoats area of Manchester, the Albion Works strip and re-fit project was funded by the Building Safety Fund, a Government Fund to remove unsafe non-ACM cladding on residential and mixed-use properties that are 18 metres and over and do not meet building safety regulations.K Systems Approved Installer QFF Façades were contracted to complete the exterior wall insulation and rendering of the 8-storey residential building.The original 60mm EPS system was stripped from the building and replaced with a safe, thermally efficient façade solution, which upgraded the fire performance of the cladding, ensuring the safety of both the building and residents.Our ServiceK Systems provided support throughout the application process for this Building Safety Fund project. The Technical team offered on-site technical and installation support throughout the build process and supported QFF to ensure quality and reliability.We produced a bespoke specification and worked closely with Thomason Consulting and QFF Façades to agree and deliver specifics such as fire stopping and abutment details.From design advice through to installation, we offered a partnership approach which aided a smooth installation process with minimal disruption.Technical Project DetailsThe original sheathing boards were replaced, and the K Systems Exicco M drained cavity façade system was installed. This high performing drained cavity system was specified as a requirement for this steel frame residential building. 60mm mineral wool insulation was specified to retain the line of the existing façade.Fire safety with high rise buildings like Albion Works is of utmost importance and this solution generates high levels of fire resistance and non-combustibility (A2, s1-d0 rating), meaning the latest building regulations were complied with. Additionally, the thermal performance of the building improved with a U-value of 0.28 W/m²K being achieved. Residents will therefore enjoy reduced heating costs and better living conditions.For the finish, silicone thin coat render ensured that aesthetically Albion Works had a clean, crisp attractive appearance. This durable, low maintenance render transformed the outside of the building and will ensure a longlasting finish to the property.

Showing 469-504 of 509

Feedback