NBS Source
I'm a manufacturer

"electric fires and room heaters"

5,763 results found

Sort by:

Showing 469-504 of 1714

Sponsored
Marioff HI-FOG watermist system protects one of the greenest public buildings in the UK

Marioff HI-FOG watermist system protects one of the greenest public buildings in the UK

Marioff Ltd

Marioff provided an efficient and environmentally sustainable fire protection solution.The unique structural requirements and responsibility of protecting more than 2,000 staff members, plus the public, called for a reliable and trustworthy partner in fire protection.The Brent Civic Centre, a council and community space in London, chose Marioff HI-FOG® water mist fire suppression to safeguard their sustainable building. The Centre serves as the headquarters of Brent Council, a London Borough local authority. It is situated in the Wembley Park area of Brent and opened in 2013 and was designed to be the greenest public building in the UK.The Centre needed an efficient and environmentally sustainable fire protection solution for the one-of-a-kind nine-story building. The structure features a five-story atrium, which doubles as an events venue, and a drum-shaped area that hosts a wide range of government functions, community events, and services.Brent Civic Centre chose Marioff HI-FOG as a sustainable solution. The fire suppression system put in place, validated by real fire tests, discharges fine water mist particles to efficiently cool radiant heat. This is accomplished while using significantly less water than a traditional sprinkler system — in keeping with the Centre’s sustainability focus. HI-FOG provides peace of mind to administration while safeguarding lives and ensuring continuity for the critical city hub.
Sponsored
Vivanta by Taj, Dwarka, India - Pyroguard Firesafe

Vivanta by Taj, Dwarka, India - Pyroguard Firesafe

Pyroguard UK Ltd

The ChallengeWith the architects hoping to realise their vision of space and light on the ground floor, but the fire officer demanding fire safety partitioning around the base of the lift shafts, Pyroguard tendered a stylish, high-performance solution – a lobby encased in glass and steel, capable of delivering best-in-class performance credentials and aesthetic appeal in abundance.Working closely with steel frame and glazing specialist Pacific Fire Control, Pyroguard designed a modern glass wall, with a glazed door and stylish, thin steel frames which were independently fire tested by Efectis France.The scheme amendment was accepted by both the architects and the fire officers, declaring Pyroguard as their manufacturer of choice for this flagship leisure development.The SolutionA subsidiary of India’s largest business conglomerate, the Tata Group, the Indian Hotels Company is known for its relentlessly high standards, which are visible across its portfolio of hotels.Meeting this quality benchmark head-on, Pyroguard supplied 390 square metres of ultra-thin lightweight Pyroguard Firesafe, which offers protection from flames, smoke and radiant heat for between 30 and 120 minutes.This EW-classified product is UV stable and offers exceptional light transmission, making it the perfect solution for encasing the lift lobby. The toughened glass was installed in fire-resistant steel screens and door frames around the lobby.
Sponsored
70 ST MARY AXE - Metal ceilings, Luminous ceilings, BREEAM

70 ST MARY AXE - Metal ceilings, Luminous ceilings, BREEAM

Lindner Group

60-70 St Mary Axe is an office building designed by London-based architectural firm Foggo Associates with retail space on the ground floor. It is located in thearchitecturally ultra-modern financial district of the City of London in close proximity to the iconic 30 St Mary Axe, also known as "The Gherkin," whose facade was realized byLindner. Also, the new building is nicknamed: "The Can of Ham" in its semi-elliptical shape reminiscent of the packaging of English canned ham. The 360° view through the vaulted, all-glass façade offers a great view of the city of London. The BREEAM Excellent building offers 28,000 m² of office space, spread over 21 floors and designedto meet a wide variety of needs.Lindner Interiors contributed to the construction with interior fit-out products. These include the suspended ceilings for the "A" category office rooms on the 3rd, 9th and 12th floors, and the luminous ceilings at the reception and in all elevator anterooms.The Lindner fire grid ceiling system LMD-B 100 with linear grid arrangement was installed on two floors, while on the third floor, light strip modules were chosen instead.These complete the appearance of the iconic building in an impressive way. If required, LMD-B 100 partitions can be attached to the Lindner ceiling system so that the office space can be individually divided. With its radiant fire grids and trapezoidal ceiling tiles, the system is perfect for the sweeping silhouette of the 60-70 St Mary Axe building.Completed Works:F0 Metal ceilingLMD-B - Post cap ceilingsLuminous ceiling/luminous canopyLuminous ceilingsCertification systemBREEAM
Sponsored
22 Bishopsgate

22 Bishopsgate

Baldwin Boxall Communications Ltd

One of the newest – and very impressive – developments in the City, 22 Bishopsgate offers visitors retail, work and restaurant space over 60 floors. It is actually the tallest building in the City of London.A flexible solution was required for this project, to include life safety communication for the entire building. At the forefront of the design was the need for a plan for phased evacuation using the life safety systems. The VIGIL3 voice alarm and OmniCare emergency voice communication systems were quoted for the project due to their reliability and capability.The project required new voice alarm and EVC systems which were specified and installed by PHF Fire. The EN54 certified VIGIL3 voice alarm includes 70 space saving, wall-mounted Eclipse4s and two floor standing racks, networked around the building. The voice alarm network is accessed by the touch screen control microphone, with its user-friendly NFC card sign-in option.The EVC system solution, OmniCarePLUS, includes fire telephones, combined fire telephones with disabled refuge outstations, disabled toilet alarms, advanced disabled refuge outstations and standard disabled refuge outstations. These made up the remaining call points on the system, a lot of which were in a stainless steel finish, to match the high quality aesthetic of the building.Installed by PHF Fire, Baldwin Boxall worked together with the team to aid in the design and commissioning of the systems.Sam Faulkner, Maintenance Manager at PHF Fire commented, “Baldwin Boxall was specified alongside other companies. However, the level of support that Baldwin Boxall gives throughout the project, from start to finish, set them apart from the competition.”Chris Hartup, Sales Manager at Baldwin Boxall said, “This new build project called for a very capable, reliable and professional fire alarm contractor and with the contract being awarded to PHF Fire, they certainly got that. Due to limited floor space, the Eclipse4s were installed into riser cupboards within the building, providing further redundancy to the end user.PHF Fire had a fantastic, positive relationship, not only with their client but also their whole supply chain. We had many meetings and presentations on site with the whole 22 Bishopsgate team.It was a great experience to be involved in this project and with PHF Fire throughout.”
Sponsored
ExCel London Phase II - Fireroll Acoustic

ExCel London Phase II - Fireroll Acoustic

Bolton Gate Company

The SiteExCel London opened in November 2000 and was the integral component of a huge regeneration project in the area of the Royal Victoria Docks next to the River Thames. The Phase 2 project had the primary objective of increasing the existing flat floor space by 32,500m² resulting in an incredible one million square feet of flexible floor space. This projected the already highly regarded Excel  London into the position of a world class exhibition and conference venue.  Close to London City Airport and with it’s own dedicated station on the Dockland Light Railway the centre manages to attract millions of visitors per year and is a major employer within the local community.The ProjectHaving worked with Sir Robert McAlpine on numerous projects, Bolton Gate Company were extremely pleased to be chosen to again work alongside this Main Contractor particularly on such a prestigious project.   The contract initially involved the supply and installation of a range of 30 and 60 minute fire rated shutters to satisfy the requirement for fire compartmentation between different exhibition spaces and to communal walkways throughout the Exhibition Centre. As the fire strategy developed it became evident that, for particular areas including some of the largest openings (7m x 10m), the fire shutters were required to provide fire integrity but this also had to be combined with an acoustic rating of up to 17dB RW. At the time, acoustic rated fire shutters did not exist on the market as a single product solution and consequently it was typical to supply two separate shutters with one to satisfy each requirement but, given space limitations, this was not a viable option. The SolutionDrawing on years of experience, Bolton Gate Company were committed to developing a workable solution in order to fully satisfy the project requirements.  Moving away from the standard ‘single skin’ type fire rated rolling shutter, efforts were concentrated upon manufacturing a new insulated type shutter that would be capable of providing the acoustic rating. The new shutter design was subjected to a series of rigorous testing, include both fire and acoustic tests all of which were in keeping with the very latest standards. The testing proved to be highly successful and we were pleased to complete our contractual obligations using the very first Fireroll Acoustic shutters which had achieved an E120 fire rating and 22dB RW acoustic rating. The Fire Shutter - Fireroll Acoustic provided a compact, hard wearing, yet aesthetically pleasing single shutter solution which was entirely suitable for incorporation into such a highly regarded exhibition and conference centre.   
Sponsored
1 Aylesbury Street, London

1 Aylesbury Street, London

Pilkington United Kingdom Limited

Project: 1 Aylesbury Street, Clerkenwell, London, EC1R 0DRClient: MeritcapeArchitect: Atum Design LabM&E consultant: EngDesignProtecting Cities Against Fire with Advanced GlazingDaylight-flooded spaces command a premium from tenants, but in the densest urban areas – where buildings are very tightly packed – it can be difficult to achieve. Not least because of the need to protect against the spread of fire.This was the challenge for developer Meritcape when they set out to refurbish 1 Aylesbury Street – a converted historic warehouse building in Clerkenwell, East London.The designers wanted to fill every floor of the building with natural light, from both the front and the back of the building by using floor-to-ceiling glazing on every floor. However, the rear of the property was just three metres away from a neighbouring building.To prevent fire spreading from one building to the next, building regulations specify the fire resistance that external walls need to be able to provide. This is given as minimum requirements for integrity – how long they can contain smoke and flames – and insulation, or how long they can prevent the escape of heat. Steve Bond, technical and customer support manager, fire, at Pilkington United Kingdom Limited, said: “When you have two buildings this close together, standard glazing is not an option, as it doesn’t put up enough of a barrier to fire spreading outwards from the building.“That’s where fire-resistant glazing can make a big difference. By providing protection against fire while also letting light flow in, we can create light-filled spaces in very built-up parts of the city where not long ago it wouldn’t have been possible.“As well as sealing in flames and smoke for at least an hour, the glass also provides radiation shielding that reduces the amount of heat energy that can pass outwards through the glass – another key means of spreading fire.” The rear façade of the building is glazed in Pilkington Pyroclear® Plus insulating double-glazed units, delivering not only the right level of fire resistance, but have also been designed to give excellent thermal insulation (U-value) properties to reduce heat-loss from the building.Davood Kiani, Senior Project Consultant at Meritcape said: “Those looking for modern commercial space expect floorplans to be well lit with natural light, and this is one of the main design challenges when working with buildings in the most densely urban areas of the city.“Fire regulations are one of the big reasons for this, so Pilkington fire-resistant glazing means we can achieve the best of both worlds - a building that meets or exceeds all of the safety regulations while also feeling spacious and airy.”A total of 800 m2 of Pilkington glass was used in the project, including in the front façade of the building, in which hundreds custom-sized small double-glazed solar-control units were used to imitate the crittall steel-framed windows that are a signature feature of buildings in the area.Images by S G Photography
Sponsored
Fitzroy Place

Fitzroy Place

InterLace

Fitzroy Place is a regeneration of the former Middlesex Hospital, making a collection of beautiful homes arranged around a stunning landscaped square in the heart of Fitzrovia, a prime area which has long been one of central London’s most cherished neighbourhoods.InterLace designed, manufactured and installed roller blinds to more than 230 luxury apartments along with specialist electric blinds and curtain tracks to the four exclusive penthouses atop the development.
Sponsored
Johann Lafer Culinary School

Johann Lafer Culinary School

Gira Giersiepen GmbH & Co KG

Celebrity chef Johann Lafer defines the current standards for cooking, savouring – and technology. His culinary school is a unique forum for culinary culture and way of life. As part of this, the concept is in no way limited to exquisite ingredients and refined recipes. Instead, it combines enjoyment, design, light, entertainment electronics and modern building control to an atmosphere of well-being for all the senses.Electrical installation company: CIBEK technology + trading GmbH - Bernd Klein.
Sponsored
Paramount choose Zip for their office water solutions Case study

Paramount choose Zip for their office water solutions Case study

Zip Water

With the vision being to create one of the city’s most ‘instagrammable’ offices, fit out contractor Paramount needed every product specified for the refurbishment of Dock House to be aesthetically pleasing as well as highly practical. Zip’s HydroTap and InLine ranges met the brief for all of their water needs."We pride ourselves on making places where people want to be and that’s certainly the case with our new Bristol office. We wanted every detail to reflect our vision of creating a destination workplace and this included the water provision. Zip Water could provide world class products combined with the best service so we had no hesitation in specifying their products."Kevin Marshford, Sales Director | Paramount OfficeThe briefDock House, a three storey building in Bristol’s Welsh Back, was ripe for redevelopment. Paramount wanted to create a striking office space that was flexible enough for working, events and meetings. And, taking the ground floor as their new Bristol head office, Paramount had a vested interest in designing a modern and desirable workplace which was in-keeping with its historic location. In terms of water products, Paramount wanted energy efficient water heaters for washrooms which could reliably deliver hot water whenever required. With the building being used frequently but with a low intensity interspersed with short stints of high occupancy, it was important that the systems were as efficient as possible. In addition to washroom water heaters, Paramount wanted to offer staff and visitors a sociable tea point in the communal bar area. With aesthetics and sustainability so high on the priority list, a stylish drinking water product was needed that could provide filtered boiling, chilled and sparkling water without the need for single-use plastic water bottles.The solutionThanks to an existing relationship with Paramount, Zip Water was specified to provide a number of products for this project. Washroom hot water was solved thanks to Zip’s InLine range, which discreetly provides instantaneous hot water whenever needed. Its innovative design heats water as it flows through, meaning there is no standing heat loss, just energy efficient hot water. For the bar area, Zip provided its HydroTap Classic Plus in smart matt black. This clever tap which was installed on the bar with the help of a font, provides instant filtered boiling, chilled and sparkling water. This transforms the way staff and visitors can make hot and cold drinks - and helps to encourage a refill culture within the workplace. Another benefit of the HydroTap is the enhanced hygiene thanks to SteriTouch which is embedded in the touchpad, as well as in key components of the water path, reducing the growth of bacteria by 99.99%.The results"We pride ourselves on making places where people want to be and that’s certainly the case with our new Bristol office. We wanted every detail to reflect our vision of creating a destination workplace and this included the water provision. Zip Water could provide world class products combined with the best service so we had no hesitation in specifying their products."Kevin Marshford , Sales DirectorParamount Office Interiors
Sponsored
Klasse G-board | Rosebank Way, Ealing

Klasse G-board | Rosebank Way, Ealing

Klasse Group Ltd

This residential block in Ealing, London required replacement cladding, in part due to recent fire regulations and rules that have come into effect.Klasse G-board was utilised on this project due to its ease of use and A1 fire-rated, fully non-combustible classification.
Sponsored
One Bishopsgate Plaza

One Bishopsgate Plaza

Profab Access Ltd

Profab Access proves its worth at One Bishopsgate Plaza Situated in the centre of the City of London, One Bishopsgate Plaza is one of the first high-rise residential and hospitality developments to be built in the capital for a number of years. Once construction has been completed, the flagship 43-storey tower will house London’s first luxury 5* Pan Pacific Hotel, which will comprise of 237 rooms, an indoor swimming pool and a 370 capacity Pacific Ballroom, Square Mile’s first dedicated ballroom. From levels 21 to 41, the development will house 160 luxury one, two and three bed residential apartments, or ‘Sky Residences’, which will boast panoramic views of some of London’s most iconic landmarks. As part of the construction process, over 200 steel riser doors from Profab Access in a range of door leaf configurations and sizes from its INTEGRA 4000 Series, combined with over 300 bespoke ceiling panels from its ECHO 7000 Series, are currently being installed throughout the entire tower by BDL Dry Lining. Specified due to their impressive seamless integration into masonry walls, shaft walls and drywall partitions, the riser doors provide discreet and secure access that won’t impact on the overall interior design scheme of the development, a main consideration for the public and private areas of the hotel.The INTEGRA 4000 Series’ third party CERTIFIRE bi-directional certification from Warrington Fire was also a leading factor for specification, as the riser doors are fire tested from both sides to two hours, providing the highest standard of evidence for fire safety performance.All of the doors were supplied with comprehensive CERTIFIRE accreditation documentation as evidence of Profab Access’ up to date fire testing, providing both the specifiers and contractors responsible for the development with absolute confidence in the performance of the critical fire integrity products.The INTEGRA 4000 Series is independently bi-directionally fire tested and certified by an accredited third party, to ensure legal compliance.A combination of one and two hour fire rated riser doors were chosen to be installed throughout all residential and communal areas of the building to not only achieve compliance with current regulations by eliminating the spread of fire throughout the building for the specified durations, but sufficiently future proof the building for years to come. The bespoke Profab Access ECHO 7000 Series Ceiling Access Panels have also been specified for installation throughout the hotel bedrooms and communal areas to provide concealed and maintenance free access to the ceiling shafts. Due to the significant size of the ceiling access panels, which span up to 1100mm x 1800mm, Profab Access developed a bespoke additional safety system that featured a one side lift out and one side swing/push latch mechanism. The innovative design assisted BDL Dry Lining’s team of engineers in stopping the heavy doors swinging from the ceiling, while also enabling the panel design to work within a reduced space. BDL Dry Lining is one of the largest specialist dry lining contractors in the UK and has been an installer of Profab Access riser doors and access panels on high profile commercial and residential projects for a number of years. Tony Grayson, Project Manager at BDL Dry Lining, said: “This is a standout development to be involved with and we knew from the very beginning that Profab Access would be our go to supplier for this project. “Over the last two years we have worked closely with Profab Access’ team of Specification Managers and Engineering experts to deliver and install the riser doors and ceiling access panels throughout the 41 storeys. The access solutions are extremely easy to install and offer the highest standards in performance, quality and compliance for unfaltering consistency across the entire site.”The riser doors are also 35dB acoustic rated, smoke sealed and airtight to Part L. In the event of a fire, the doors will maintain their frame and integrity for up to two hours, limiting the spread of fire and transmission of radiant heat for this period of time. The doors’ intumescent smoke seals also enables occupants to safely exit the building, whilst subsequently minimising potential damage to other areas of the construction. By specifying the CERTIFIRE bi-directionally fire tested INTEGRA 4000 Series Riser Doors, the development is actively future proofed as the comprehensive testing certification provides a complete and transparent audit trail of due diligence that evidences the products are not only fit for purpose, but meet the duty of care required to ensure legal compliance.  Marcus Parnham, Commercial Director at Profab Access, said: “As One Bishopsgate Plaza is such a unique building, it required a bespoke approach that ensured the access solutions we provided were not only fit for purpose, but superseded expectations. “That’s why every element of the ceiling and wall access products have been individually considered, from the additional safety systems on the ceiling access panels, to the Euro Cylinder locks on the riser doors to prevent unauthorised access. The result is a complementary suite of solutions that provide unobtrusive access, without compromising on aesthetics.”Profab Access’ comprehensive portfolio of access panels and riser doors are manufactured in-house at its headquarters in Atherstone and are supplied with impressive lead times throughout the UK. The products are supported by a wide range of BIM Level 2 and CAD files to aid the specification process and streamline the initial design stages.Manufactured in accordance with ISO 9001, the INTEGRA 4000 Series Riser Doors and ECHO 7000 Series Ceiling Access Panels can be specified and installed in a range of configurations to meet each project’s specific measurements and requirements.For further information on Profab Access and its range of riser doors, access panels, and steel doors, call +44(0)1827 719051 or visit www.profabaccess.com.
Sponsored
Skibbereen Community School, County Cork

Skibbereen Community School, County Cork

Rockfon

Skibbereen Community School, situated on the southern tip of Ireland in County Cork, is a new state-of-the art learning facility created as part of an ambitious multi-million PPP programme. ROCKFON ceiling solutions were installed to help create the ideal conditions for learning and enhance the architect’s contemporary design. ROCKFON ceiling systems were selected for Skibbereen because they either met or exceeded the acoustic requirements specified by the Department of Education. Fire safety was also an important factor and ROCKFON products provide Class A1 fire resistance, the safest fire classification.
Sponsored
Blockhaus Climbing, Manchester

Blockhaus Climbing, Manchester

Advanced

A QuickZone conventional fire alarm system from UK manufacturer, Advanced, has been installed at BlocHaus Climbing, Manchester’s newest bouldering wall.BlocHaus Climbing boasts an array of facilities at its East Manchester site, including 130 climbable boulders, routing roof and on-site café. As part of the active fire protection for the site, the 4-zone QuickZone conventional fire panel from Advanced has been installed alongside Hochiki conventional heat/smoke detectors, Apollo conventional call points and Roshni conventional sounders.Responsible for the design, installation and commissioning of the fire system at BlocHaus Climbing were Manchester-based, Surefire Protection Ltd. Surefire installed the QuickZone panel alongside music shutdown integration to ensure clear audible notification for all building users in scenarios where the system goes into alarm.
Sponsored
Commercial Building, Birmingham

Commercial Building, Birmingham

Nullifire – a brand of Tremco CPG UK Ltd

Designed to provide 240,000 sq. ft of Grade A commercial space over ground and thirteen upper floors, an iconic building located in the heart of developing city Birmingham utilises a range of Nullifire passive fire protection products to ensure that its complex fire strategy is achieved.
Sponsored
Hand Dryer Case Study (Large office complex) - Morgan Stanley, London & Glasgow

Hand Dryer Case Study (Large office complex) - Morgan Stanley, London & Glasgow

Dryflow

If any company knows about good investments, it’s multinational investment and financial services firm, Morgan Stanley, who made the shrewd decision to switch to more cost-effective hand dryers from the summer of 2022.Units Supplied: 15 to date, with plans to supply moreKey Benefits: Energy efficient, cheap to run and good looksRated Power: 0.8kW - 1.65kW | 2.67 - 4.58 Wh per dryProjectThe UK branch of the international firm, with offices in London and Glasgow, was previously using the Dyson AB14, until its buildings managers crunched the numbers and realised there were many cost savings to be achieved by moving to more energy-efficient hand dryers.SolutionMorgan Stanley’s workplace solutions provider, CBRE, approached one of our electrical wholesaler partners, Edmundon’s Electrical, to source the perfect hand dryers. We worked closely with the wholesaler to help them arrive at the ideal solution – the Dryflow Steelforce Hand Dryer. This popular, hands-in dryer, designed for high-traffic areas, can provide 1,875 dries per just £1 of electricity, whilst offering reliability and certainty… in the washroom at least.The Dryflow SteelforceWith famously fast dry times, this dryer is made for busy, fast-paced environments where time is money. It even features a guiding light to help the user maximise the powerful airflow for optimum efficiency.Its sleek, stainless steel lines allow it to fit in the most prestigious of washrooms, and it can certainly give the Dyson Airblade AB14 a run for its money, both in looks and performance that would normally be associated with a much more expensive dryer.The design team behind the Dryflow Steelforce Hand Dryer have created a unit with second-to-none efficiency that’s cheap to run, great value to purchase, and is built to last. It comes with market-leading guarantees and a robust build that will keep it running and running, with limited need for maintenance.
Sponsored
Bridge Street Exchange, Cardiff

Bridge Street Exchange, Cardiff

Siderise Group

To meet the passive fire protection requirements for a new 27 storey high-rise student accommodation in the centre of the thriving Welsh capital of Cardiff, Siderise, leaders in the development of fire, thermal and acoustics insulation solutions, has provided cavity barriers and firestops as part of the curtain walling system.
Sponsored
STI protect vital life safety equipment with donation to local care farm

STI protect vital life safety equipment with donation to local care farm

Safety Technology International Ltd

Safety Technology International have donated protective covers to help a local community charity with false alarms at a time when they need it most.Wildgoose Rural Training is a charitable care farm in Hallow, just outside of Worcester, that supports adults and young people with a variety of learning disabilities.Starting in 2000 with just a handful of students, Wildgoose has grown into a 42-acre site with a thriving 6-acre farm where students from all backgrounds can learn horticulture, animal care, woodworking, arts and crafts, and carry out conservation work.Wildgoose supports students in a ‘happy and inclusive family atmosphere’ and focuses on teaching practical and meaningful land-based skills.One student had recently taken a liking to setting off the fire alarms in the main building at Wildgoose, resulting in frequent unnecessary evacuations.Not only did this cause a great deal of upheaval in having to evacuate the students from their buildings to the fire assemble points, but in students with sensory sensitivity and hearing issues these fire alarms caused a great deal of distress, panic and shock.On contact with STI, Wildgoose were recommended the Euro Stopper® call point covers with a sounder alarm to discourage the student from setting off the fire alarm. The protective covers were duly installed over the call points in their main building to prevent accidental or malicious tampering with the fire alarm without restricting legitimate operation in an emergency.Managing director of Wildgoose Rural Training Centre, Jim Hidderley said: “The call point covers provided by STI have reduced our regular false fire alarms from a weekly occurrence down to 0, the covers with sounders prove to be a sufficient deterrent from any mischievous hands.”“More importantly, the cover has ensured that our students are not put under any stress that is unwarranted due to false fire alarm triggering”The Euro Stopper® is a tough polycarbonate cover that can withstand the toughest of knocks and has an optional 96dB integral sounder that draws immediate attention to the area to dissuade unwanted activation of call points, therefore reducing false fire alarms.
Sponsored
Anodised Aluminium and Polyester Powder Coated Finishes On Aluminium Fascia Soffit At The Restaurant Story

Anodised Aluminium and Polyester Powder Coated Finishes On Aluminium Fascia Soffit At The Restaurant Story

Dales Fabrications Ltd - Aluminium Eaves Products

Location: Tooley Street, London BridgeProject: RestaurantProduct: Raking Fascia Secret Fix Soffit Panels (facetted to both concave and convex radii)Finish: United Anodisers Anolok Bronze 541Fire Rating: A1 – Non-combustibleProduct: Plain Verge Fascia Finish: Syntha Pulvin RAL 7013 Brown Grey MattFire Rating: A2 s1, d0 Non-combustible (Reaction to Fire EN BS 13501-1:2018)Client: Tom Sellers Restaurant StoryArchitect: Spacecraft ArchitectsMain Contractor: McGee Ltd
Sponsored
Lingley Mere Gym, Warrington - Pyroguard Infinity

Lingley Mere Gym, Warrington - Pyroguard Infinity

Pyroguard UK Ltd

The challengeA leading UK water company refurbished its headquarters in Warrington, which included a full office fit-out and building a staff gymnasium. The solutionThe project utilised glass in the new gym as the light transmission was a priority. Arkoni, a fabricator based in West Yorkshire worked with Pyroguard to deliver a clean cut glass screen without the unsightly black edges often found on other fire glass screens. The glass chosen for the gym was the EI30 INT fire glass in a butt joint format, offering clean almost invisible joints similar to standard non-fire-rated screens.
Sponsored
005. Salesforce Transit Center, San Francisco

005. Salesforce Transit Center, San Francisco

Vetrotech Saint-Gobain UK

This central public transportation hub has a light-filled, vibrant and inviting atmosphere thanks to light columns – a structurally expressive skylight and walkable glass floor combination that brings sunshine into the building. This innovative solution has met the most demanding requirements for a fire-rated glass floor and skylight to date; 2-hour fire rating, blast, and seismic resistance, plus live loading for foot traffic. It involves horizontal fire-rated glass, structural glass, and spacers with air-gaps to avoid replacing glass due to dirt and condensation issues that would develop with foot traffic and the outdoor environment.
Sponsored
001. No. 1 Forbury Place, Reading

001. No. 1 Forbury Place, Reading

Vetrotech Saint-Gobain UK

No.1 Forbury Place in Reading, UK, is the largest butt-jointed fire-rated glazing construction in Europe and features Vetrotech's oversize fire-resistant glass, Contraflam Mega. The project comprises more than 1,400 m2 of Vetrotech’s EI30 fire resistant glazing solution: Contraflam. On the ground floor of the 8-story atrium Contraflam Mega single panes are installed with heights of 4.5 m and weights up to almost 0.5 t. The 4-sided vitreous atrium from the first to the seventh floor has been fully equipped with Vetrotech’s Contraflam Structure flush glazing solution.
Sponsored
Potato Wharf, Manchester - Residential

Potato Wharf, Manchester - Residential

Aspex UK Limited

Potato Wharf scheme comprises 191 apartments in Manchester. The canal-side development scheme led by Lendlease is set amongst surrounding waterways and a vibrant modern community within a historic setting.  Location: ManchesterContractor: LendleaseArchitect: David Vanderson of Weedon Architects, helped by mechanical and electrical engineers, Hulley & KirkwoodAspex supplied: Integra Living doorsets, Novista Steel Riser Doors, all complete with a full Ironmongery package.
Sponsored
Genting Casino

Genting Casino

Permavent Ltd

Safeshield XT Reflect A2-s1, d0 fire rated wall membrane was used in the recladding of the Genting Casino, Premier and Holiday Inns.RIVERLIGHTS DERBY, MORELEDGEA complete re-cladding on the exterior of the Genting Casino, Premier Inn, Holiday Inn, part of the Riverlights location in Derby city centre, including Safeshield XT Reflect A2-s1, d0 fire rated construction membrane.Oakleigh Contracts were chosen to undertake this large-scale project, their first re-cladding project of this size, with technical input from Permavent to ensure the correct technical specifications were achieved. Genting Casinos are a large chain of popular gaming destinations with locations across the UK and America. The property owner of the Riverlights location decided to take no risks with their new cladding, in an effort to protect people and the building in the face of the recent issues with fire spreading through and behind exterior cladding. They chose to change the existing boards to non-combustible alternatives and added Safeshield XT Reflect A2-s1, d0 fire rated construction membrane to the walls under the new boards. Safeshield was chosen for it’s high fire rating, adding another layer of protection against fire behind the cladding and inside the cavity, but also for its superior thermal properties. Safeshield XT Reflect’s reflective technology allows for greater energy efficiency in the building as it reflects heat, decreasing the emissivity of the wall cavity and reducing energy loss. Oakleigh Contracts also praised Safeshield for it’s easy and intuitive installation, as well as being extremely robust both during and after installation
Sponsored
Baldovie EFW CHP

Baldovie EFW CHP

Hart Door Systems Ltd

Baldovie EFW CHP Facility is a energy from waste site using around 110,000 tonnes of residual waste per year from Dundee and Angus to generate electricity. Project/doors:7 Insulated Roller Shutter Doors1 High Speed Door - Speedor StormThe challengeDue to the nature of the build and technical challenges from the onset, Hart worked direct with the contractor and the consultants in the design phase to provide a solution to suit each challenge faced such as corrosion, odours, noise and infestationThe solutionInsulation is a key feature of an energy saving environment. Insulated roller shutters have a thermal value of minimum 0.69w/m.sq.k and 18db to minimise operational noise. The Speedor Storm is an extremely robust door with wind class 5 up to 8m. Moisture-controlled electrics protect from varying temperatures within a building, and mechanical components are protected from dust and dirt controlling the escaping dirt, odours and noiseThe successFollowing extensive communication with the contractor and the consultants to ensure the smooth running of the project, the steelwork was designed and installed correctly to allow for the timely installation of the Hart manufactured doors. Each door was made to measure and each activator and safety device fitted to suit the environment
Sponsored
Meadow House, Coventry

Meadow House, Coventry

Keim Mineral Paints Ltd

Meadow House is a 17 storey, block of flats situated in Coventry. The residential apartment block was built in 1967 and is the second tower block, in Coventry, to be painted using KEIM for its fire-resistant certifications.Similarly to Falkener House, located near Coventry cite centre, this project required a fire-resistant coating and must classify to A2-s1,d0, to meet current building regulations.The applicator, Elhance Limited, who are Leicester based, contacted KEIM to provide a fire-resistant paint. The painted concrete balcony surrounds, and painted brickwork were in relatively good condition. There was general dirt from the urban environment as well as moss and green growth on the surface which required cleaning before any decoration was to take place.KEIM Soldalit-ME was specified due to its A2-s1,d0 fire classification. It is a durable exterior paint that has the added benefit of breaking down organic material and contaminants, which will keep the surfaces cleaners for longer.The facades will not require decoration for another 10-15 years, if not more.A final tower block, also situated in Coventry, has been commissioned to be painted using KEIM Soldalit-ME again due to its fire resistant and durable benefits.
Sponsored
Telecommunications HQ, India - Pyroguard Firesafe

Telecommunications HQ, India - Pyroguard Firesafe

Pyroguard UK Ltd

The ChallengeAs a multinational business and leading employer within the region, the telecommunications giant was keen to lead the way in India’s fire safety standards, equipping its employees with both a comfortable and safe working environment. At the heart of this mission was the challenge of balancing the practical everyday needs of employees with the safety standards required of modern offices. In solving that challenge, Pyroguard – together with local partners, Pacific Fire Controls – was able to play an integral role by providing fire-rated safety glass specifically for the project.The SolutionUsing Pyroguard T EW 120, a toughened safety glass from Pyroguard’s Firesafe range which is capable of delivering radiant heat, smoke and flame protection for up to 120 minutes, the ambition of creating a light-filled workspace for employees could be realised.The glazing’s light transmission characteristics meant natural light could be maximised, while its sound reduction reflected the needs of the busy office.Having been fire-tested by Efectis France and certified for use with timber frames, Pyroguard and Pacific Fire Controls were able to install modern dividing walls to create break-out spaces, facilitating meetings and collaborative working – while still keeping safety in mind.
Sponsored
Hybrid operating theatre doors for The London Clinic, Harley Street

Hybrid operating theatre doors for The London Clinic, Harley Street

Dortek Ltd

The London clinic is one of the UK’s largest private hospitals. Located in the heart of London’s world famous medical district it is the first hospital to have hybrid theatres. Hybrid operating theatres combine the surgical capacity of traditional operating rooms with the imaging capabilities of a catheterisation lab.BriefThe trust required specialist hybrid operating theatre doors for its new hybrid operating suite. The hybrid theatre provides the surgical technology to enable surgeons to switch between open vascular surgery and endovascular surgery as necessary, with real time imaging support.SolutionDortek’s hygienic hybrid operating theatre doors were installed in theatre areas. Dortek’s hybrid operating theatre doors can combine a number of key properties all in one hygienic door. Whether its x-ray rated, automated, fire rated, waterproof or hermetically sealing sliding, these doors were a versatile solution for these new breed of hybrid operating theatres. Doors were also automated to allow staff to open and close them without touching any surface to reduce the risk of infection.
Sponsored
Friedrichscarrée ( FCS ) - Stuttgart, Germany

Friedrichscarrée ( FCS ) - Stuttgart, Germany

Lindner Group

The Friedrichscarrée is a modern office and retail complex in the center of Stuttgart.Named after the former king of Württemberg, Friedrich I., it is characterised by its modern architecture and glass front. In addition to numerous companies, it now also hosts retail, catering businesses and event spaces. The good access to public transportation and the close proximity to restaurants and cultural institutions, make Friedrichscarrée an attractive location for businesses and visitors.As the general contractor for the expansion, Lindner carried out an extensive interior construction - ranging from drywall work to floor systems and wall cladding. In addition to high-quality floor coverings and also partly automated partition walls, the special construction of the hollow floor FLOOR and more® for the pedestal in the barista bar was a central element of the revitalisation. Lindner hallway ceilings LMD, heating and cooling ceilings and acoustic sails were also installed to optimise room acoustics.Furthermore, GiB mbH supported Lindner in upgrading the existing fire protection. The entire conversion was carried out during ongoing business, which required precisescheduling of noise-intensive work.
Sponsored
FIREFLY™ TITAN Lite™ Protecting Movement Joints Within New Midland Metropolitan University Hospital.

FIREFLY™ TITAN Lite™ Protecting Movement Joints Within New Midland Metropolitan University Hospital.

FIREFLY™ TBA

The fire protection of critical movement joints within the main floor slabs of the new Midland Metropolitan University Hospital in Birmingham has consumed some 1,000 linear metres of FIREFLY™ TITAN Lite™ 120/60, as a well proven and widely specified passive fire protection product.
Sponsored
Hyde Park property protected using FIREFLY™ ZEUS Lite™ Barrier

Hyde Park property protected using FIREFLY™ ZEUS Lite™ Barrier

FIREFLY™ TBA

Northamptonshire based DC Fire Protection Ltd., a long-term customer of TBA FIREFLY™, has employed the manufacturer’s ZEUS Lite™ system to create a 90:30 minutes’ fire barrier within the first floor ceiling void of a commercial property in London’s Hyde Park area.
Sponsored
Akpo Offshore Vessel - Intershield 300, Intertherm 751CSA and Chartek 7  - Floating Production Storage and Offloading vessel (FPSO)

Akpo Offshore Vessel - Intershield 300, Intertherm 751CSA and Chartek 7 - Floating Production Storage and Offloading vessel (FPSO)

International®, brand of AkzoNobel

Due to proven technology and a proven track record, AkzoNobel was chosen to supply fire and corrosion protection coatings for the Akpo FPSO.The vessel is 310 meters in length with facilities for 240 crew members and storage for two million barrels of oil. With two processing trains for the separation of oil and water, and an average production capacity of 225,000 barrels of oil equivalent per day, the Akpo FPSO is a high-value installation. The risk of catastrophic hydrocarbon fires was a significant concern during construction, as was the risk of metal corrosion in the harsh offshore conditions.With outstanding technical knowledge and a long, successful track record in the new-build FPSO market, AkzoNobel was selected as the protective coatings supplier for the project. Chosen from the market-leading Chartek range of fire protection products, Chartek 7 is a light-weight epoxy intumescent ideal for providing PFP (Passive Fire Protection) in offshore installations, due to its excellent water and chemical resistance.
Sponsored
Waterside Park

Waterside Park

The Safety Letterbox Company

THE PROJECTThe Waterside Park project features multiple banks of a fire rated mailboxes that comply with the BS 476 Part 22 offering a one hour integrity rating that will ‘contain and form a break to a fire’.The bank of mailboxes are recessed into a wall and integrated with a finishing surround frame providing a high quality edging to the products, hiding any gaps between brick and mailbox and ensuring a high quality finish.The mailboxes feature an inward sprung flap, which is a standard feature across the fire rated mailbox range. An intumescent strip is placed on the internal side of the mail flap, which expands when the temperature increases and ensures that the flap is kept closed – stopping the oxygen flow into the mailbox and reducing the risk of fire spreading through the mailbox.Each mailbox used in this project has been fitted with a unique identification numbering vinyl with a black colouring to easily show the users (both residents and postal operatives) where each mailbox is situated.
Sponsored
UCL PEARL

UCL PEARL

HAG Ltd. - The Door Specialists

“A great achievement by all involved”– Neil Turvey, UCL Estates Assistant Director Capital ProjectsOverviewUCL is one of the world’s leading universities, as well as being London’s number one university for Research Strength, where they have consistently led the way with not only their academic excellence but also their global impact.UCL PEARL (Person-Environment-Activity Research Lab) was completed in Autumn of 2021 and is a unique facility, designed to explore how people interact with their environment in a groundbreaking 4,000m² building. Sophisticated systems are used to gather a rich array of information which will help to understand these reactions and how they can be used to create a better urban environment for the future.PartnershipHAG Ltd. were tasked with protecting the building both through the supply & installation of essential fire protection systems, such as fire shutters & fire curtains and high security steel door sets throughout the building, located in Dagenham, in the London Borough of Barking & Dagenham.As a UK wide company with nearly 40 years’ experience in dealing with large scale contracts of this size, we were able to assist the main contractor by ensuring reliability, professionalism, safety and ensuring that the project was completed on time.All our fire protection products are fully compliant with the Regulatory Reform (Fire Safety) Order 2005 and certified to UKCA.All of HAG’s fire curtains have been independently tested and certified by the international fire testing experts at Warrington Fire, are tested to the latest standard BS EN 1634:2014 and marked to BS EN 13241-1:2003.HAG Ltd.’s steel doors offer an exceptional level of security, whilst not compromising on aesthetics. Our doors were made to the specification of UCL PEARL, to seamlessly sit in their surroundings and ensured not only security, but they are suitable for high levels of use and offer thermal insulation. The ProjectThe original UCL PEARL site consisted of various buildings, one of which was Grade II listed 1940’s. The new building is the first zero-carbon in-use building for UCL, and one it hopes will set the bar for future developments.Within the 10m high building, you will find life sized environments, such as a train station, village square, high street, even a pop-up theatre, all of which have fully controlled conditions and the ability to change materials, such as the flooring or wall cladding. UCL can adjust lighting, sounds and experiment with smells and the other senses to see the impact that these changes have on people. “A building that will be able to house the world”– Nick Tyler, Chadwick Professor of Engineering and Director of UCL Centre for Transport StudiesUp until now, assumptions have been made about how people react to environments, but this has been based on outdated data. UCL PEARL can now pave the way, with the use of sophisticated systems, such as eye trackers, brain scanners & accelerometers, to ensure a more informed suite of ground-breaking data going forward.UCL PEARL are already working in partnership with the London Underground and are researching the design of the built environment for people with dementia.Not only are there legal requirements and obligations for fire safety and protection within this building, but fire shutters & fire curtains should be regularly maintained to ensure they are suitable for intended use, they are safe to use, in good repair and subject to a program of monitoring & reviewing.This is another reason that HAG Ltd. were chosen to assist with this unique facility, as we can offer a full & comprehensive maintenance & repair service, to ensure that their fire shutters & curtains continue to work efficiently and with ease.
Sponsored
Sherwood Lodge - Regeneration

Sherwood Lodge - Regeneration

Aspex UK Limited

Sherwood Lodge – a new £18.5m joint headquarters for Nottinghamshire Police and Nottingham Fire & Rescue Service. Scheduled to open by the end 2021. Aspex products were selected by YMD Boon working with Gleeds for Nottinghamshire Police, Fire & Rescue.Products supplied: Ironmongery, Integra Doorsets and Novista Riser Timber Doorsets
Sponsored
EXCLUSIVE LIVING IN RADISSON BLU HOTEL IN COLOGNE

EXCLUSIVE LIVING IN RADISSON BLU HOTEL IN COLOGNE

KEUCO

With its direct Rhine location, the Radisson Blu Hotel in Cologne's Deutz district is a popular area for tourists and trade fair visitors alike. From their vantage point in the hotel, guests also have a view of the most famous landmark of the city: Cologne Cathedral. Setting out from the designer hotel, it is only a few minutes' walk over the Hohenzollern bridge, with all its affixed padlocks, to the city centre.Together with the German magazine Wohnidee and other highly trained specialists, the interior architects from the agency JOI-Design, prop. Peter Joehnk and Corinna Kretschmar-Joehnk, designed exclusive suites for the hotel. Design highlights and special materials were brought together to create a modern atmosphere for the guests. Carefully selected products from KEUCO give the premium bathroom furnishings in the “Urban Retro” suite a very special touch.The interplay between the soft forms and straight contours of EDITION 400 integrates harmoniously into the surroundings of the premium furnishings of the room. A soft oval characterises the face of the washbasin fitting and the bathroom accessories, whose brilliant chrome finishes highlight them effectively. Decoration together with the finest in functionality can be seen in the free-standing porcelain accessories of EDITION 11. And for perfect illumination of the face, there is the light mirror from EDITION 400. The secret: A special light-conducting material transmits the light of the LED to the surface. The lights can be dimmed with the sensor controls, allowing the luminous colour to be adjusted to any setting. The mirror also has an integrated heater, so fogged mirrors are a thing of the past. The illuminated cosmetic mirror is perfect for taking a closer look. The adjustable luminous colour and flexible height settings allow guests to adapt the mirror exactly to meet their needs.In the shower the hotel guest is free to choose between three outlets. The innovative IXMO fitting from KEUCO combines several functions in the smallest of spaces.Three-way diverter valve, wall outlet and hand shower bracket are all integrated into one module. With the help of the thermostat each guest can adjust the optimum temperature for the head shower, waterfall shower or hand shower. One of the great advantages of IXMO is that the placement of the modules can be chosen individually, meaning that, due to the optimum positioning, the stopcock valve can be operated before even stepping into the shower.A versatile shower system with a minimalistic appearance. What’s special about IXMO is that all modules have the same dimensions. Their excellent design can't fail to impress, regardless whether round or rectangular. With a diameter or edge length of only 90 mm and a depth of only 80 mm they present themselves to the guest with a uniform appearance, and offer the best freedom of movement in the shower.
Sponsored
A functional design for The Francis Crick Institute

A functional design for The Francis Crick Institute

Dortek Ltd

Working with the project architects, our technical team helped to develop the door specification for this state of the art 86,000sqm medical research facility. Dortek designed and installed more than 500 bespoke hygienic door and automation solutions throughout the facility. This included non fire rated and fire rated single action and sliding doors and hermetically sealing sliding doors. Our doors were essential for providing protection across hazardous fire areas. Our void free doors are hygienic, easy to clean, non absorbent and do not harbour bacteria. This makes them ideally suited to research laboratories which are sensitive to contamination.

Showing 469-504 of 1714

Feedback