NBS Source
I'm a manufacturer

"cement board"

1,698 results found

Sort by:

Showing 433-437 of 437

Sponsored
Glangwili General Hospital

Glangwili General Hospital

David Bailey Furniture Systems Ltd

We have been selected by architects IBI Group and construction group, Tilbury Douglas, to manufacture and install healthcare furniture for a project improving the obstetric and neonatal facilities at Glangwili General Hospital, Carmarthen. The furniture contract is for the value of £100,000.The contract win follows the Welsh Government’s £25.2 million investment into the obstetric and neonatal facilities at Hywel Dda University Health Board’s Glangwili Hospital as part of its Design For Life Framework. The project is divided into 4 phases: Phase 1 of the project has already been completed, Phase 2 is underway at present and the entire project should be completed by early 2023.David Bailey has a strong presence in Wales and we had recently carried out some successful, substantial contracts there, as part of notable projects in the area, that had come to the attention of Interserve. 
Sponsored
Haydons Road, Wimbledon

Haydons Road, Wimbledon

Cellecta Ltd

Haydn Avenue is a block of 8 purpose-built flats consisting of seven one beds, and one two beds arranged in two interlinked blocks. The front block includes six flats over three floors with two further flats to the rear block over two. This development is located within walking distance of Haydons Road station and offers regular links into central London.Cellecta’s Mojave S2-8 was specified by Papa Architects as it offers a dry and robust floor build up from one source. Mojave S2-8 is a high-performance underfloor heating system which performs at a low flow temperature. XFLO FF boards are manufactured to suit the pipe diameter and spacing required to achieve the desired thermal output.Caldera Construction was awarded this 100m² contract for this development in Wimbledon.
Sponsored
Village Hotel, Portsmouth

Village Hotel, Portsmouth

Cellecta Ltd

This Village Hotel is a six-storey hotel with over 7,700m² floorspace, car parking and associated landscaping, next to the Porsche Centre at Lakeside North Harbour Portsmouth. The hotel has 153 rooms, conference facilities and a leisure club with a 20m swimming pool, gym and fitness studio, costing £17 million. This hotel has excellent transport links to the city of Portsmouth and the wider Hampshire area via the M27 and the A3.Cellecta HiDECK Acoustic Overlay 28 was specified by 3DReid for this project due to the floor treatment’s high density and superior compressive strength resilient layer; it provides outstanding levels of acoustic performance, exceeding legislative requirements. The board has a tongue and groove edge profile, allowing for screw-free installation.Willmott Dixon was awarded the contract to construct this 900m² development.
Sponsored
Sun Life

Sun Life

Planet

Based in Bristol, Sun Life offers straightforward life cover, insurance and savings for the over 50s. Taking an old soap and vinegar warehouse, the company chose Interaction to both run and design this ambitious CAT B fit-out. Planet Partitioning were bought on-board to design, manufacture and install the internal partitioning needed to create the corridors, offices and meeting rooms. To stay true to the building’s industrial history, LOFT20 was used throughout.The partitioning was used to section a varied choice of spaces, for both working and downtime, for a flexible working environment, fit for a modern company.To create a unique feature, faceted glass panels where used to create the illusion of curved walls. This was the first time the LOFT20 system had been installed in this manner and the result, with the bands applied, was seamless.
Sponsored
Schwimmbad Berlin

Schwimmbad Berlin

Wedi Systems (UK) Ltd

Projects Information: Type: Public Swimming Pool Room: Shower area for women/men, shower Location: Berlin Kaulsdorf Construction company: Heidrich Fliesen, Zernitz-Lohm Project Description: 50m pool Non-swimmer pool with slide 2 sauna cubicles 95°C, steam bath, samarium 4 water wheelchairs, no lift, but flat, rounded Disabled parking spaces Products/Systems used: wedi Building Boards in different thicknesses wedi 610 Adhesive and Sealing Material wedi Tools Reinforcement Tape Special production (8 units each) with Fundo Requirements: Very short assembly times on site Support from AD + AWT in setup/instruction Very short drying times Water-tight material Quick processing

Showing 433-437 of 437

Feedback