NBS Source
I'm a manufacturer

"paints and primers"

1,861 results found

Sort by:

Showing 397-402 of 402

Sponsored
Bracknell Forest Council - Times Square

Bracknell Forest Council - Times Square

LSA Projects Ltd

Architect: AtkinsInstaller: Vitec Ceilings and PartitionsProduct: Gustafs Linear RibA small but perfectly executed project at 75m2, the new Bracknell Forest Council chambers at the Times Square building in Berkshire is clad with Gustafs Linear Ribs to the ceiling and feature wall.The plain white ceiling ribs are organised into multiple square rafts across the space installed in alternating directions and interspersed with traditional ceiling tiles, lighting, and vents.The split feature wall which stands either side of the speakers’ podium and main panel desks is made up of a mixture of natural Oak and Bamboo veneer and painted ribs installed with irregularly positioned 45° angled joints.The ribs were delivered oversized and cut to size on site, the mitre joints were also cut on site by Vitec and joined using extra-long installation clips to keep the joint inline and give the illusion of a dip-dyed rib.
Sponsored
English Spirit Distillery - F. Ball gets into the spirit at new distillery

English Spirit Distillery - F. Ball gets into the spirit at new distillery

Ball, F and Co Ltd

F. Ball products including Styccobond F48 PLUS fibre-reinforced high temperature grade vinyl adhesive, have helped transform a disused agricultural building into a new state-of-the-art distillery and visitor centre at Treggudick Manor, Cornwall.Flooring contractors installed a variety of floorcoverings, including vinyl sheet and tiles, wood and carpet tiles, throughout the 620m2 space at the English Spirit Distillery.The installation began by mechanically grinding the building’s recently installed power floated concrete screed to create a ‘key’ for subsequently applied subfloor preparation products. Stopgap F77 waterproof surface membrane was then applied to create a barrier to prevent excess subfloor moisture attacking adhesives and floorcoverings, potentially leading to floor failure.Following this, contractors primed the surface using Stopgap P141 primer, and once dry Stopgap 300 HD levelling compound was applied in the kitchen that serves the café. Elsewhere, Stopgap 1200 Pro high performance levelling compound was used to create a perfectly smooth base for floorcoverings.Styccobond F48 PLUS was chosen to install Altro Ensemble wood-effect Luxury Vinyl Tiles (LVTs) in the restaurant and shop, each comprising an area of approximately 100m2.In the kitchen, Altro Stronghold ‘Dolphin’ grey vinyl safety flooring was adhered with Styccobond F73 PLUS one-part, moisture-curing heavy-duty adhesive and in the offices, Styccobond F41 carpet tile tackifier created a permanently tacky film to hold Heckmondwike flint grey carpet tiles firmly in place when subject to normal foot traffic but enable them to be lifted and replaced should they become worn or damaged.
Sponsored
Coca-Cola Enterprises, Wakefield

Coca-Cola Enterprises, Wakefield

Rapid Ramp Limited

REQUIREMENT: Able-bodied access to the cabin. ADDITIONAL INFORMATION: We quoted and produced technical and CAD drawings, with reference to the finished floor height measurement supplied by the modular building company.END RESULT:Our expert installers fitted a step system as shown. FEATURES INCLUDED: Mesh Platform - self-draining mesh allows water to pass through rather than collect on the surface.Trombone Ends - these are added to the ends of a step system to prevent clothes catching.Telescopic Legs - these can be adjusted to accommodate different threshold heights.Standard Continuous Handrail - this handrail system ensures users always have support to hold onto.Standard Colour Black - ramps are powder-coated black, to create a durable finish that is tougher than conventional paint.THE COMPLETE RAMP PACKAGE:An all-inclusive, stress-free option which we managed in-house.This package includes a site survey (if applicable), quotation, CAD and technical drawing, supply, and installation. 
Sponsored
Craven Cottage, Fulham FC - Gatic CastSlot

Craven Cottage, Fulham FC - Gatic CastSlot

Alumasc Water Management Solutions

A bespoke Gatic CastSlot system was installed as part of the redevelopment of the riverside stand for Craven Cottage, home to Fulham FC. The project, which began in July 2021, incorporates Gatic CastSlot Treadsafe, which was chosen to drain away any excess surface water from the seating/standing areas along the deck of the stand. It was installed by main contractors Buckingham Group.The unobtrusive profile of CastSlot sits neatly within concrete, asphalt, and block surface finishes and features an electro painted ductile iron throat section. This is securely fixed to the galvanised steel channel body to provide an exceptionally robust yet discreet drainage system.The treadsafe option was chosen for this project. Treadsafe is available for areas where there is regular foot traffic and is available with a 10mm or 30mm opening—ideal for stadium standing and seating areas.Bespoke access boxes were also created for the new stand, and channel throat depths were also extended for level changes, allowing a constant invert within the channel.
Sponsored
Belgrade Theatre Coventry - MG500 Crittall Glazed Sliding Folding Partitions

Belgrade Theatre Coventry - MG500 Crittall Glazed Sliding Folding Partitions

ModernGlide Ltd

A MG500 flush glazed sliding folding system completed project in Coventry. Panel profiles finished in a bronzed aluminum to match the project design. Each panel applied with crittall bars and a reeded glass film, these panels make a statement. MondernGlide were involvement in the project via Planet and it’s been a pleasure working in helping with the design and construction works onsite. The redevelopment project was split into 2 different phases. Phase 1 was all about the sympathetic refurbishment of the main B1 auditorium and associated public spaces. It is about retaining and enhancing the historic nature of this space, whilst refurbishing many of the tired and worn finishes and fittings to completely refresh the space The benefit of the MG500 is that we require no structural support within the ceiling meaning this product can be installed anywhere. With the slim back painted border you have clear view visual lines allowing a superior light flow around the office, cost-effective installation, flexibility in the work environment as well as the simple fact that they look elegant and classy.
Sponsored
Trinity Primary Academy

Trinity Primary Academy

TRC Windows

TRC was appointed as principal contractor by Barker Associates in May 2019, to carry out specialist sash window restoration works.Trinity Primary Academy is a primary school located in Bounds Green Road, Wood Green, London. It was built in 1899 by Mitchell and Butler and consists of yellow brick and red brick dressings, tiled roofs, irregular fenestrations, and sash windows that give away its Queen Anne Revival style. It's currently categorised as a Grade II Listed building with Historic England, and is part of the Academies Enterprise Trust.Nature of the worksAs the building was Grade II listed, timber window repairs had to be sympathetic and complementary to the historic nature of the property. Many of the existing timber sash windows were inoperable due to the build-up of decorative coatings, timber degradation, and defective and broken sash window ironmongery, as well as opening mechanisms. The requirement was for the windows to be fully refurbished, repaired and operational as originally intended, but also modified to meet health and safety requirements.Phase one of the refurbishment of 200 sash and timber casement windows commenced on the area needing most attention: the west elevation of the building. Following the success of phase one, the client team extended TRC’s appointment to continue around the remainder of the building, systematically completing all other windows, door and roof light refurbishments.This overall refurbishment project included:Stripping back the existing paint from the historic sash windows and repairing any decayed timber.Repairing glazing as and where necessary.Improving the thermal and acoustic containment by installing draughtproofing.Repainting windows and installing ironmongery.Undertaking brick and stone repairs to the building’s exterior.This project also required our specialist attention on some specific areas of traditional glazing. This aspect of the project required the repair and refurbishment of all four oriel bay windows and the oriel bay glazed roofs. Completion included the supply and fixing of new safety glazing and hardwood timber roof rafters, along with the repair and refurbishment of the two existing openable roof lights. The supply and fixing of new code 4 lead flashing, with lead wedges, was also carried out and fully pointed with the correct cement mortar at the wall abutment.Additional detailed work throughout the project included the following:Removal of all existing fitted window blinds for refixing upon completion of works.Removal and repair of existing window ironmongery, including original mechanical winding gear, solid bar opening mechanisms, locking fasteners, slide bar restrictors, cable restrictors, handles and stays.Careful removal and repair of all internal fixed-glazed hopper units, casements and pivot openings.Removal and replacement of all cracked and broken glazing, and replacement of the existing Georgian wired-glazing, with 6mm safety glass or 4mm polished plate glass to areas up to 1.2m height from floor level. Where privacy was required, white opaque glass with thickness in accordance with above was used.Removal and replacement of all loose and defective glazing putties, and removal of all flaking, loose and built-up paint coatings.Exposure of all timber rot and decay ready for repair with Repair Care Systems products, followed by sanding and priming ready for decoration.Vertical sliding sashes repaired, refurbished and rehung on new sash cords and weights, and adjusted as needed. Sashes were routed to accept new brush pile weather stripping. New parting beads and staff beads were serviced with brush pile weather stripping where appropriate.Final internal and external decoration was carried out using Dulux or Leyland trade paints, allowing for one undercoat and one gloss finish.

Showing 397-402 of 402

Feedback