NBS Source
I'm a manufacturer

"school"

2,832 results found

Sort by:

Showing 361-396 of 998

Sponsored
Integral finger guards - Cwm Ifor Primary School

Integral finger guards - Cwm Ifor Primary School

Safehinge Primera

We've been working with Caerphilly County Borough Council since 2010. Like many Local Education Authorities, they'd previously used plastic finger guards but grew frustrated with the lack of durability and need for frequent replacements. They tried a number of different plastic options but none were up to the job in a modern high traffic school environment – which is where we came in. The discreet design of our integral finger guards design out the problem of trapped fingers, as well as helping incorporate flexibility into the building design, embracing the school's culture and ethos of community and support.
Sponsored
Education | Lyons Hall Primary School

Education | Lyons Hall Primary School

Venesta Washroom Systems Ltd

Recognised by Ofsted as an Outstanding school, Lyons Hall’s success had resulted in the need for a new teaching block to meet the demand for extra places. The first phase required school toilets for the Early Years pupils and for washroom solutions for general use. As an existing client of Venesta washrooms, Award Winning RIBA Chartered Architects, Laurie Wood Assoicates, were confident of our ability to meet the standards set. Lollipop cubicles are designed specifically to meet the needs of young children. The range offers a fun design, great safety features and shaped doors to allow for discreet adult supervision.
Sponsored
Midland’s School Maximises Teaching Space

Midland’s School Maximises Teaching Space

Style - Moveable Partition Specialists

Working directly with St. Jude’s Academy in Wolverhampton, leading operable wall specialist Style installed a moveable wall to separate a dual-purpose classroom. Dramatically improving the use of space, the sliding partitioning system allows teachers the flexibility to quickly reconfigure the classroom from a single large teaching/activity space into two smaller classrooms that can operate side-by-side. Following the installation, Style was also appointed as the servicing and repair agent for this and five other moveable walls within the school. Routine servicing will protect the school’s investment by ensuring smooth and safe operation of each wall.
Sponsored
Queen Elizabeth School Wakefield

Queen Elizabeth School Wakefield

Gerflor Flooring UK Limited

When two top-performing Wakefield schools needed to source high quality flooring for their sports halls they turned to international flooring specialist Gerflor to supply 1300m2 of their world class Taraflex® Performance vinyl sports flooring, together with 1350m2 of Isolsport isolating membrane to complete the refurbishment project. The transformation was completed, and the client is delighted with the refurbishment.So, it’s no wonder that specifying a sports floor for both schools that could deliver both outstanding performance, comfort, and high levels of safety for all users regardless of their ages, and sporting ability would be top of their agenda.Kent Oliver Estates Manager at Queen Elizabeth Grammar Wakefield said, “We had an urgent need to refurbish our Boys’ and Girls’ tired granwood main sports hall flooring. We engaged with a number of Gerflor’s previous clients, who could not speak highly enough of the quality products installed and the fantastic levels of service provided by the Specification and Technical teams.”Wayne Andrews, Gerflor Sports Manager North UK said, “The client is extremely pleased with the final installation. A number of Gerflor people were involved, right from the Specification Team through to high-level management who all agreed how important and unique this project was.”Kent Oliver ended by saying, “We would definitely specify Gerflor again. The performance and appearance has surpassed our expectations and we have received nothing but positive feedback from the schools, and other sports hall users.”
Sponsored
Hydrostop AH-25 Liquid Roofing - Sacred Heart Primary School

Hydrostop AH-25 Liquid Roofing - Sacred Heart Primary School

AccuRoof

Hydrostop AH-25 product was chosen to refurbish 450m2 of roof at the Sacred Heart Primary School in the Bridgeton area of Glasgow. Areas of the roof had been leaking, leading to considerable water damage and disruption to some classrooms. The priority for the roof works was to procure a waterproofing system with minimal hot works that would cause as little disruption to the school’s everyday activities as possible.
Sponsored
Case study – Sir John Moore’s Primary School in Appleby Magna

Case study – Sir John Moore’s Primary School in Appleby Magna

Twinfix Limited

When Sir John Moore’s Primary School in Appleby Magna, Leicestershire, required a new classroom for their Key Stage 1 children, architectural and construction consultancy YMD Boon were happy to assist. The school was originally designed by Sir Christopher Wren, one of the most highly acclaimed English architects in history. It opened in 1697 as a free school for boys and is now a Grade 1 Listed Building enhancing the picturesque village of Appleby Magna.
Sponsored
Langley Academy Primary School

Langley Academy Primary School

SPS Envirowall Ltd

Langley Academy Primary School, is a modern 2 storey development which will house 630 nursery, reception and junior pupils in Slough Berkshire. To carry out the main works of this project, the sub-contractor was appointed to construct the building using a concrete frame and cement particle board, then wrapped in high quality external wall insulation and render materials from SPSenvirowall. Working collaboratively, this saw the installation of 1100 meters of 200mm insulation, which met the desired thermal performance of the building as well as contributing to the fire and acoustic requirements.
Sponsored
South Bromsgrove High School

South Bromsgrove High School

Gerflor Flooring UK Limited

When South Bromsgrove High School in Worcestershire underwent a refurbishment and expansion programme back in 2007, they turned to international flooring specialists Gerflor to supply over 200m2 of their world class Taraflex® Performance vinyl sports flooring for their main sports hall. It’s a huge testament to the quality of Gerflor’s high manufacturing standards that after fourteen years the Taraflex® sports flooring is still delivering optimum levels of safety and performance and continues to provide users with outstanding amounts of comfort.Wayne Andrews, Sports Specialist North for Gerflor commented, “the Taraflex Performance at South Bromsgrove High School is really standing up to the test of time due to its durability, ease of maintenance and use of a multi-sports capability.”Taraflex® technology delivers long-lasting high-performance of the products for the lifetime of the floors…a massive boon when long-term planning and budgeting are perceived as being two key considerations for specifiers.
Sponsored
St Wilfrid’s Catholic High School, Pontefract add Enclosed Outdoor Dining Area with Heat and Light

St Wilfrid’s Catholic High School, Pontefract add Enclosed Outdoor Dining Area with Heat and Light

A&S Landscape – School Canopy Manufacturer

St Wilfrid’s Catholic High School had outgrown its dining room, which eventually could only seat half their pupils at a time. They looked at the options to increase dining space and realised that they couldn’t afford an extension building. That is when they contacted A&S Landscape and realised that an outdoor canopy, with side panels, power, heating and lighting could be a fantastic, cost-effective solution.
Sponsored
Springwood Primary School, Manchester – Case Study

Springwood Primary School, Manchester – Case Study

Twinfix Limited

A special educational needs school in Salford welcomed an additional sixty pupils across its two sites in Swinton and Irlam this September.Springwood Primary School, which is the only primary school of its kind in the city, increased its overall capacity to three hundred pupils from nursery to Year 6.The expansion involved enlarging a second site at Craig Hall in Irlam which the school used as a ‘temporary annex’ for around three years.Twinfix were approached by MTX Contracts the Principal Contractor on the project to design, manufacture and install a canopy at the site, between the building and existing canopy.A major challenge that Twinfix’s design team needed to over-come was a Build-Over-Agreement issued to the school by the Water Board, which required 24/7 access to the drains beyond the proposed site for the canopy.The team rose to the challenge and designed this mobile canopy, a first of its kind for Twinfix. This impressive free standing curved canopy, spanning a total of sixty square metres comprises of a sliding section with a run length of three metres and a static section with a run length of 17.5 metres.The aluminium structure is powder-coated to RAL 5003, Sapphire Blue. The half barrel vault roof design was constructed using Twinfix’s bespoke roof glazing systems glazed with 10mm clear polycarbonate. The non-fragile system achieves a Class B designation in accordance with the HSE’s ACR[m]001:2019 drop test.The main challenge was to create a frame that was strong enough to retain its shape when moved but light enough for a single person to open and close the retractable section. This was achieved through material choices, such as the polycarbonate vertical glazing instead of glass to keep the weight to a minimum. The expert team also designed a bespoke track and wheel system which allowed the whole frame to glide open and close very easily, once closed it was locked in position to the adjacent fixed frames which retain it in place during high winds.Director at Twinfix, Dan Smith commented: ‘From initial concept we felt like this product would fit in well with our current product range, so had confidence it was something we could develop for the client. The finished design looks really well and is extremely easy to use, this is a credit to our internal design and fabrication teams that worked together to achieve our goal’Matt Lawrenson, Deputy Head at Springwood commented on their new canopy: ‘Over the Summer of 2021, we had a Sheltered Walkway constructed and installed by Twinfix at our SEND provision, where we have children with a range of complex additional needs aged 2-7 years old. Our sheltered walkway allows us to move pupils between our existing school building and the new extension we have had built. As well as ensuring safe passage for children and staff, the quality and dimensions of the structure will provide an ideal additional learning space for our pupils, lending itself to a whole host of possibilities. It is light, spacious, and aesthetically pleasing. Furthermore, the walkway satisfies an extremely specific and demanding design brief, with a retractable section which will allow utilities services access to a rising main in the event that this should be needed, without compromising its appearance or necessary sturdiness. We could not be more pleased.’You can see the canopy in use here.
Sponsored
Case Study – St Cuthbert’s Catholic High School, St Helen’s

Case Study – St Cuthbert’s Catholic High School, St Helen’s

Twinfix Limited

Built in 1957, St Cuthbert’s is one of the oldest Secondary Schools in St Helens, and was the first Catholic Secondary Modern to be built since the war. The distinctive main elevation of the school appears largely as it did nearly sixty years ago, but over-all the school’s buildings have increased over the last half century to accommodate increased pupil numbers and more facilities. Last year, Twinfix were approached by BPL Construction to design, supply and install an enclosed free-standing mono-pitch canopy at the school, which would provide additional space for dining, a popular choice for schools looking for a cost-effective alternative to traditional extensions, allowing them to utilise their outdoor areas and provide additional covered space. The canopy covering a total of 129 square metres, manufactured from rust-resistant aluminium and powder coated to RAL 9004 signal black comprises of our innovative Multi-Link-Panel NF roof-glazing system, glazed with 25mm opal polycarbonate. Coloured vinyls were attached to some of the side panels to brighten up the structure and tie in with school branding. Mrs Twist, Head Teacher at the school commented: “We are extremely impressed with the quality and design of the canopy. The onsite team have worked in close proximity to our students and have taken full account of their health and safety.” The addition of the side glazing and doors add extra protection from the elements, making it a usable space throughout the year and a secure area for storage of equipment.
Sponsored
Prior Weston Primary School - Bespoke Solar Canopy

Prior Weston Primary School - Bespoke Solar Canopy

Able Canopies Ltd

Prior Weston Primary, located in the City of London, required a large south facing free standing canopy that would create solar energy for their school whilst also protecting their pupils from the elements. Able Canopies designed and installed a variation on the Kensington Dual Pitch, incorporating IPV (Integrated Photovoltaic) solar glazing panels into the roof panel design to provide a solar power facility for the school.
Sponsored
Education | Marian Vian Primary School

Education | Marian Vian Primary School

Venesta Washroom Systems Ltd

“Wow - the children are so excited to have new toilets. The school has had the same toilets since 1930 and they were in desperate need of replacing. The children now take pride in the facilities and love the wash trough hand basin. The impact on all children having nice facilities to use is amazing. The problem I have now is they don’t want to leave the washroom!” - Sue MacAskill, Marian Vian’s Facilities Manager The biggest challenge was the time constraints, due to school term times. Specifying our industry-leading pre-plumbed panelling system Vepps® helped reduce installation time by 50%.
Sponsored
Klasse C-board | Compass School, Bermondsey

Klasse C-board | Compass School, Bermondsey

Klasse Group Ltd

A brand new building has been built in Bermondsey, London to provide Compass School with more teaching space.C-board was the chosen external sheathing board for this project.
Sponsored
Klasse G-board | King Edward VI School, Birmingham

Klasse G-board | King Edward VI School, Birmingham

Klasse Group Ltd

The King Edward VI School in Birmingham is currently undergoing an extensive reconstruction aimed at modernising the building. Upon completion, the school will boast cutting-edge teaching facilities.The chosen external sheathing board for this project is the Klasse G-board.
Sponsored
Yealmpton Primary School

Yealmpton Primary School

Gerflor Flooring UK Limited

At Yealmpton Primary to the East of Plymouth in South Devon all children are encouraged to be more active during break and lunch times with sports and fitness at the forefront of that focus. When the school implemented a refurbishment programme for their multi-use hall and kitchen servery area, they turned to international flooring specialist Gerflor to supply their world class Taraflex® Multi-Use vinyl sports flooring and their Tarasafe Ultra safety flooring. An Isolsport underlay was also supplied by Gerflor, enabling the installer to lay the Taraflex® Multi Use directly over the existing Granwood floor.
Sponsored
Dartington CofE Primary School - Tarnhow Mono Wall Mounted Canopies

Dartington CofE Primary School - Tarnhow Mono Wall Mounted Canopies

Able Canopies Ltd

Dartington C of E Primary School in Totnes, Devon were in the process of having a new £7 million school built. The new development consisted of 12 classrooms and a variety of contemporary facilities which 315 primary school pupils and 30 Early Years children would benefit from.As part of the design of the new school, the architect was keen to introduce a free-flow from the outside to the inside. It was also important to them that they create an outside space that could be used throughout the school year.The only way to achieve the level of cover required, would have been to install a number of wall mounted canopies adjacent to the school’s classrooms.It was therefore agreed that 130 metres of timber canopies would be installed around the school, wrapping around the building providing almost uninterrupted cover throughout. This included using our standard Tarnhow timber canopies and adding bespoke qualities to them such as a 90° ‘hip’ (external corner) and a 45° ‘valley’ (internal corner) to the buildings’ entrance and variations in the post heights due to the uneven ground height.
Sponsored
Sevenoaks School Science & Technology Block

Sevenoaks School Science & Technology Block

Schueco UK Ltd

Sevenoaks School’s Science & Technology Centre, designed by Tim Ronalds Architects, brings together a diverse set of disciplines and “puts learning, education and experimentation on display”. Daylit and naturally ventilated throughout, the £23m development has a robust interior of expressive structure, evident construction and natural materials, yet feels highly transparent, with views to the landscape and beyond.
Sponsored
Primary school in Cornwall makes the swap to HVO biofuel

Primary school in Cornwall makes the swap to HVO biofuel

Grant Engineering (UK) Ltd

Gwinear Primary School in Cornwall has upgraded its heating system and switched to renewables by installing a Grant Vortex oil boiler which is using HVO biofuel, becoming the first school in the UK to use this fossil free liquid fuel.
Sponsored
King Solomon School

King Solomon School

Axter Ltd

OverviewThis project saw the refurbishment of King Solomon International Business School, which was changing hands from office use to education. The building now features specialist science rooms, resistant materials workshop, drama studio, outdoor sports hall, music rehearsal rooms, food technology, ICT rooms and language rooms.ChallengesDue to the change of building use, a full survey of the roof covering was required. Excessive moisture was found within the existing asphalt covering, water ingress was present and the internal top floor of the building was not suitable to be used as a teaching space. The roof area presented many challenges with complex detailing to existing balustrade posts, live mobile telephone masts and large quantities of plant / M&E installed.SolutionsAs a starting point, the roof was completely stripped due to the high level of water ingress. The existing asphalt covering was removed ready for installation of a new Excel RBM system, with Hytherm ADH PIR thermal insulation. Much of the existing M&E was found to be redundant and could safely be removed from the roof area.The complex detailing to the balustrades and fire risk areas was simplified using Starcoat PMMA cold applied liquid waterproofing, allowing for a long term, robust and financially viable solution. High level roof areas were also detailed with ease using Starcoat PMMA. Successful installation provided a peace of mind roof covering for the next 25 years, supported by Axter’s Platinum Guarantee.Systems in useExcel®Starcoat® PMMA
Sponsored
Orchard Brae School

Orchard Brae School

LSA Projects Ltd

Architect: JM ArchitectsInstaller: Profile Projects LtdProduct: ‘Shiluvit’ by Oranit500m2 of Shuluvit panels in 7-601 format in A-9-1 (Oak) stained Yellow Pine were installed to the ceiling of the swimming pool area at Orchard Brae Complex Needs School near Aberdeen.The Shiluvit panels are a stunning feature of the swimming pool area in addition to providing acoustic dampening to the bright and open space; the panels were also finished with a humidity resistant lacquer to protect the ceiling against the damp environment and ensure quality and stability for the life cycle of the product.In addition to education facilities for up to 150 pupils the brand new £18.5m Centre of Excellence, the campus is a community hub for families, groups, and charities working with children and adults with additional support needs; the facility houses sensory rooms, working gardens, specialist home economics teaching spaces, and play facilities as well as being a base for local outreach speech and language services.
Sponsored
New Science & Mathematics Centre, Charterhouse School

New Science & Mathematics Centre, Charterhouse School

BCM GRC Ltd

BCM were delighted to supply GRC to Charterhouse School's award-winning new Science & Mathematics Centre in 2018.The project in Godalming, Surrey was the South East winner at the RIBA Regional Awards in 2019.
Sponsored
Artificial Turf Case Study - Northolt School

Artificial Turf Case Study - Northolt School

TigerTurf (UK) Ltd

TigerTurf helped Northolt School in Middlesex to replace their old 3G pitch that had come to the end of its natural life. The new artificial turf 3G pitch is installed and reviewed in this case study.
Sponsored
DOWNER RAINSCREEN FRAMING USED EXTENSIVELY FOR THE BROXBOURNE SCHOOL

DOWNER RAINSCREEN FRAMING USED EXTENSIVELY FOR THE BROXBOURNE SCHOOL

Architectural Panel Solutions

Downer our original helping hand, aluminium rainscreen framing system, helps lead the way for this exemplary education sector project.In the words of leading education sector architects – Bond Bryan, The Broxbourne School is a beacon for excellence for modern education.Architectural Panel Solution's Downer rainscreen framing system - DCS031 was used extensively for this ambitious projects as you can see from the supporting suite of images.A vibrant and contemporary aesthetic was achieved thanks to the complementing, highly durable Swisspearl fibre cement facade panels – Vintago (Colours: VI 061, VI 091) fixed with Sika adhesive onto Swisspearl’s Sigma8 mechanical secret fixing system, and our original Downer DCS031 framing.Architectural Panel Solutions was extremely proud to have won an award for this project in last year’s Facade Awards, thanks to an excellent collaboration with SD Samuels (Special Projects) Ltd, Bond Bryan Architects, ArchitecturePLB, Mid Group Ltd LtdFind out more on our website and check out the photography on the architects’ and installers websites too.https://bondbryan.co.uk/project/the-broxbourne-school/https://www.sdsamuels.co.uk/broxbourne-school/https://downerframing.com/downer-framing-used-extensively-for-the-broxbourne-school
Sponsored
Buckshaw Primary School

Buckshaw Primary School

CLD Physical Security Systems

Challenging brief The CLD team worked closely from the initial design stage to ensure they met budgets and a challenging brief: to create a fencing design that was attractive and fun whilst providing optimal safety for the school and its 200 pupils. CLD supplied the Dulok Wavetop system for discreet but robust security, the Dulok Rebound system for high performance sports fencing and locking gates with a Slidemaster main gate. A unique multi-coloured ‘pencil’ fence was also added marking out the play area with large pencil-shaped posts with wooden tops that can be re-painted by the children in any colour.
Sponsored
Chorlton High School Laminate Lockers Project

Chorlton High School Laminate Lockers Project

Helmsman

It’s prime time for the education sector to refurbish and service institutions. Helmsman manufactured and installed almost 200 new laminate lockers in a high school in Manchester. These laminate lockers were extra heavy duty. Having ‘extra’ heavy-duty lockers means that the laminate doors inset into the locker frame and creates extra durability. The advanced locking design provides a return lip within the internal door frame for the hooked cam to lock behind. In addition, there is a locking slot in the door frame upright that enables secure locking in two places. These stable and fire retardant four compartment lockers have created storage for 776 students.The Laminate used was Arpa Fucisa, which makes the corridors pop. The laminate lockers are all standard sizes of 1775mm high x 300mm wide x 450mm deep. This project included a standard 150 mm stand with the rear leg which has been cladded with matching laminate panels to have a fully secure, clean and aesthetically pleasing effect. Arpa Fucisa also used for the sidewall to locker infill. Chorlton school chose to have engraved numbers on each locker door. Using this solution for numbering protects the lockers from vandalism.Helmsman is the leading manufacturer of a complete range of lockers and cubicles in the UK and a specialist in providing solutions across different sectors from leisure, healthcare and education through to commercial, retail, construction and industrial. With a dedicated and experienced in-house design team supported by its on-site factory, the company produces high-quality lockers manufactured for each project.
Sponsored
Novara-34 anti-climb fencing chosen for Primary School

Novara-34 anti-climb fencing chosen for Primary School

Lang+Fulton

A £2.5 million investment at Toronto Primary School in Howden has provided a new purpose-built sports hall, as well as a fully DDA compliant main entrance and safe drop-off area. The ethos of the expansion and development of the school’s facilities was to maintain the unique physical character and immediacy of the school’s grounds and green avenues.The external landscaping has made extensive use of Novara-34 anti-climb fencing. Different heights of fences and gates, 1.8m and 1.2m, secure the main perimeter and subdivide the playground areas. The fence panels were installed with wooden posts replicating the theme of the surrounding tree-lined avenue.Novara-34 was also used to create security screens with gated access for both the Janitor’s entrance and a storage area.The fencing was supplied hot-dip galvanized and polyester powder coated RAL3007 Black/Red.
Sponsored
Klasse G-board | Meopham School, Gravesend

Klasse G-board | Meopham School, Gravesend

Klasse Group Ltd

A new expansion building is being built for Meopham School, upon completion, it will provide more space and facilities for pupils and staff.G-board has been chosen by the contractor as the external sheathing board for the project.
Sponsored
Reducing noise break-in issue on new school roof, Chester

Reducing noise break-in issue on new school roof, Chester

Hush Acoustics

Hush Acoustics provided an effective solution to ‘noise break-in’ at a newly built primary school in Chester to ensure the internal acoustic environment was supportive of learning goals.The Huntington Primary school was designed by Cheshire West and Chester Council to cater for 420 primary age pupils and a 26-provision nursery. The former primary schools it replaced had a capacity of 120 children, but to cope with the demand of 1,200 new houses being built nearby on the former Saighton Army camp, the decision was made to build a new school to meet the requirements.An acoustic concern highlighted was ‘noise break in’ which is caused by issues such as the sound of rain falling onto the roof, which in turn would detract from the learning environment. In order to resolve this potential issue and to guarantee the children a healthy setting free from noise disturbance, we specified our Hush 10kg Barrier Mat to be installed in the roof of the building.Hush Barrier Mat is a vinyl sound barrier mat loaded with naturally occurring minerals. The product is free of lead, unrefined aromatic oils and bitumen. Designed to improve the sound insulation of existing panels of metal, wood, plastic etc., at all frequencies. The mat is normally fixed in intimate contact with the original panel. Hush barriers are particularly effective in overcoming coincidence dip resonance found in stiff lightweight composites such as plywood sheets and hollow core panels.Working alongside Kier, were Delta Group, who we supplied with 1100 sheets of our Hush 10 kg Barrier Mat. They then applied this to the roof of the school in 3x layers, to give a mass of 30 kg/m2 and improving acoustic performance across all frequencies.
Sponsored
Education | Wimbledon Chase Primary School

Education | Wimbledon Chase Primary School

Venesta Washroom Systems Ltd

The facilities at Wimbledon Chase Primary School were in need of a complete overhaul. Accredited Installers, G Haslehurst Builders, were appointed to reconfigure the space which included the installation of contemporary, reliable and easy to maintain washroom systems.Versatile and robust Award toilet cubicles were specified due to the unrivalled safety features that come as standard. Anti-tamper fixings and emergency release indicator bolts make Award a popular choice for schools. The washroom also featured pre-plumbed, factory tested SanCeram Chartham WCs pre-plumbed to SGL Vepps panels and hardwearing SGL vanity units with SanCeram semi-recessed basins and self-closing mixer taps.Read the full case study for more details.
Sponsored
Hampton School - F. Ball achieves 100% at top London school

Hampton School - F. Ball achieves 100% at top London school

Ball, F and Co Ltd

Specialist floor levelling compounds and adhesives from F. Ball have been used to install a mixture of hard-wearing, stylish textile and vinyl floorcoverings at Hampton School in South West London. Starting in the sixth form areas, flooring contractors made a feature of the long and narrow atrium by mirroring the footprint of the mezzanine floor overlooking the breakout area onto the floor below, using a 50/50-split of Calgary Cement and Grey Forbo Flotex carpets.To achieve this, the old fibre-bonded carpet in the 250m2 room was first removed, revealing a sound, dry, concrete subfloor, which was primed using diluted Stopgap P131 general purpose primer before the application of Stopgap Green Bag levelling compound. Once the levelling compound had cured, Styccobond F44 acrylic adhesive was used to secure the PVC-backed carpet. Over in the maths’ corridor, contractors had to remove fibre-bonded carpet tiles affixed to wooden parquet blocks, leaving behind old bitumen adhesive residues. To prepare the subfloor, Stopgap 1200 Pro levelling compound was applied. Once cured, Stopgap F77 waterproof surface membrane was applied as a moisture test had indicated the presence of excess subfloor moisture, with relative humidity levels exceeding the 75% threshold for the project to progress without a moisture management solution.Next, Stopgap P141 primer was used to promote the adhesion of a subsequently applied second layer of Stopgap 1200 Pro. Finally, the 100m2 area was finished with wood-effect luxury vinyl tiles. 
Sponsored
Durlum Rhombus Ceiling in Dubendorf High School

Durlum Rhombus Ceiling in Dubendorf High School

LSA Projects Ltd

PROJECTSecondary school in Grüze 5, Dübendorf [CH]COMPLETIONOctober 2023ARCHITECTStutz Bolt Partner Architekten AGPRODUCTSTANGENTA Y100 luminaireLight distribution: 2 x 60°; light colour: 4000 K; DALI dimmable; CRI > 80; LED: 3 x 34.5 W; dimensions [L x W x H]: 1,550 x 100 x 100 mm [72 units].S7 RHOMBOS TAIFUN expanded metal ceiling system1.5 mm thickness of black sheet; mesh size: 44 x 12 x 3 x 1.5 mm; dimensions: 980 x 790 mm and 1,650 x 680 mm; powder-coated in RAL 9016 matt [576 units] The new extension to the school building at Dübendorf-Schwerzenbach blends seamlessly into the existing complex and, with a lightness of design touch and its versatile range of usage options, it takes a big step towards modern school infrastructure. This building has been designed to enable it to be adapted to suit changing requirements in future. The school building is constructed on a double gym facility, two thirds of which are recessed below ground level, receiving natural daylight through a strip of windows at the top of its walls. When needed, the TANGENTA-Y100 luminaires supplied by durlum can be switched on. These deliver high lighting intensity combined with superlative lighting efficiency. These luminaires are discretely integrated in the S7 RHOMBOS TAIFUN expanded metal ceiling system with tested ball impact resistance to fulfil the special requirements of sports hall. Combined with its small mesh size, the white, powder-coated ceiling imbues an aesthetic appeal to this hall, which is also used by the general public. All entirely in sympathy with the architectural vision.
Sponsored
Franke chosen for school washroom refurbishment

Franke chosen for school washroom refurbishment

KWC DVS Limited

Franke Water Systems was chosen for a local school Henry Fanshawe in Dronfield for their washrooms refurbishment over the summer break. Franke were chosen to supply a mixed range of products including solid surface washtroughs and stainless steel sanitaryware. The project included a range of Miranit composite wash troughs and stainless steel circular washtroughs complete with self-closing taps and SD80 soap dispensers.
Sponsored
West London Free School

West London Free School

Autex Acoustics Ltd

For West London Free School, music is at the heart of school life. Located in the busy district of Hammersmith, West London Free School needed to be transformed into an acoustically sound teaching and learning environment catering for students from Year Seven to Year 12. Existing buildings ‘The Music Lodge’ and ‘Palingswick House’ both needed to be fully refurbished. This included labs, art rooms, a canteen, a library, and a two-storey music centre.The Project In order to provide better learning environments, Rodney Maggot, Senior Design Co-ordinator for Willmott Dixon Construction, planned the acoustic requirements for each new space. The classrooms were originally built for other purposes, making the spaces challenging to work with. The refurbished buildings were full of hard reflective surfaces, so Rodney requested that Autex break up the spaces by adding sound absorbent materials. Quietspace® Panel was employed to achieve high acoustic absorption for each of the spaces being renovated. Great care was taken to strategically place each individual panel where they would best absorb problem frequencies, ensuring the rooms were balanced. By altering the height of the suspension, the surface area of the panels were increased ­– drastically improving the targeted sound absorption and reducing the number of panels needed to achieve the same result. Autex was able to cater to the different acoustic needs of each classroom by custom cutting each of the 50mm panels to the size they would be most acoustically effective.During the project there was a lack of storage and delivery space on site which meant nothing could be delivered prior to the installation date. Autex Acoustics coordinated with Willmott Dixon and delivered the panels on the exact date they were required for installation – making the process more efficient. To guarantee none of the panels were damaged in transit, Autex made several alterations to the packing of the panels which allowed for a quick and efficient installation once the panels had arrived safely. Choosing the safest acoustic products for the updated learning environments was an important aspect in the product selection process. Autex Acoustics were deliberately specified as they are lightweight; the panels are suspended above the classroom, so it would be considered a hazard to have them overhanging if the panels were too heavy. For peace of mind all Autex suspended acoustic systems have been vigorously tested and have been proven not to fall or collapse in the event of an earthquake. All Autex interior acoustic products are made from 100% polyester, making them non-toxic, safe, and a healthy alternative to other fibreglass systems available on the market. The installation of Autex Acoustics products dramatically altered the acoustic performance of the buildings, particularly in the Music Centre, which was a fantastic result.
Sponsored
Music School Ventspils, Latvia

Music School Ventspils, Latvia

BEMO Project Engineering UK Ltd

Over 5,000m² of BEMO standing seam profile was supplied to the new music school. Finished in an Anomax Anodised light gold, the profile provided non-penetrative support to the BEMO-Bond rainscreen panels at the eaves to provide a smooth finish
Sponsored
Cantonian High School - Coniston wall mounted canopy

Cantonian High School - Coniston wall mounted canopy

Able Canopies Ltd

Cantonian High School in Fairwater, Cardiff were in the process of having some Portakabin buildings installed and required a large canopy that would provide a covered walkway along the length of their Textiles, Food Tech, Drama and Learning Centre classrooms.Portakabin requested a price from us as we work closely with them, offering their clients shade and shelter solutions that fit perfectly with their temporary buildings.The school required the canopy to be 68.58m long with a projection of 6m, as mentioned above to cover a number of classrooms.The SolutionThe Coniston Wall Mounted Canopy was proposed as the ideal solution as it covered the customer’s needs. It has a maximum projection of up to 6m, can be any length and offers high UV protection to those underneath including shelter from the rain.The school was happy with the design put forward by Able Canopies and Portakabin and placed an order for a 68.58m x 6m Coniston Wall Mounted Canopy.

Showing 361-396 of 998

Feedback