Verified by manufacturer 8 months ago
A modular flooring system for riser shafts in multi-storey buildings. designed with a hinged floor plate to allow multi storey MEP modules to be installed, and the floor plates close around services.
RiserSafe Clamshell can be used for concrete and steel frames. Designed with a hinged floor plate to be cast into the structural frame . When the multi storey MEP modules are ready to install the floor plates are lifted into the vertical and clipped in place, the MEP modules are lowered down the shaft through the floor levels, when positioned the floor plates closed in sequence around services which are all modelled in the virtual world. Making the whole task easy and safe in the real world.
RiserSafe Clamshell is a modular riser flooring system that is cast into the structural frame with Mechanical, Electrical and Plumbing (MEP) modules in mind, to be installed later in the construction cycle of a new development. The hinged floor plates have pre-designed penetrations with soakers and lids prefixed at the factory for complete safety on site. When the time comes to install these multi floor MEP units, the clamshell design has been harmonised with the MEP manufacturer to open to allow the lowering into position of these MEP units. The hinged floor plates are closed around the services contained in sequence to provide a safe, secure, non-combustible riser flooring to last the design life of the building. RiserSafe soakers are installed to close off tolerance gaps to prevent materials dropping through. These allow the growing use of MEP modules to be easily installed with complete safety at the heart of the design. Allowing principal designers to avoid risk in their design and flexibility for the principal contractor.
Color | Red Guidance for specification option: Steel floor plates and relocation beams are shot blasted and primed with red oxide primer (26–30 μm thick). Grey |
Finish | Shot blasted Primed |
Material | Steel Zintec steel |
Shape | Rectangle |
Length | Bespoke |
Width | Bespoke |
Height | Bespoke |
Warranty description | 60 year |
Uniclass | |
CAWS | E20/70 Formwork E60/210 Floor E20/145 Permanent formwork E20/225 Permanent formwork for suspended floors E20/230 Modular riser flooring units |
Certification | Factory Production Control (FPC) and welding certificate.Guidance for specification option: Welding certificate No: 2273-CPR-0224-WC. Factory Production Control: Certificate No 2273-CPR-0224. |
Plate | Steel plate shot-blasted, red oxide-coated.Guidance for specification option: 6 mm thick Durbar floor plates, shot blasted and red oxide primed (26–30 μm thick). |
Frame | Zintec coated steel frame. |
Size | As drawings.Guidance for specification option: Insert reference, units over 1000 x 1000 mm are supplied with toothed removable joist hangers and supporting relocation beam/s. |
Additional supports | |
Size | 60 x 100 x 5 mm.Guidance for specification option: Relocation beams. |
Material and finish | Steel, shotblasted and primed with red oxide primer. |
Fixings | Shear wall plates and fish tails tangs.Guidance for specification option: Shear wall plates set at 600 mm centres with 20 mm diameter holes for M16 (supplied as part of the system) bolted connection. Fish tangs are provided every 600 mm for embedment purposes. |
Prepared openings | As drawings.Guidance for specification option: Insert reference. |
Integral accessories | RiserSafe soaker cover plates and lifting eyes. |
Country of material origin | United Kingdom |
Country of product manufacture | United Kingdom |
Embodied carbonA1-A3 (production stage) as defined in BS EN 15804 | 2.84 kg CO₂ eq/kg Self declared |
Recyclability | 98 |