RiserSafe® is a bespoke modular riser flooring system for multi-storey buildings, enabling safe MEP access and fire-stopped risers, installed easily by the supply chain.
RiserSafe® can be used for all different types of structures, including in-situ concrete, steel frame composite deck, precast, twinwall and lattice slab, post-tensioned slab, and post-fit for refurbs.
RiserSafe® is a bespoke modular flooring system for riser shafts in multi-storey buildings. The units seamlessly integrate into the construction process and are easily installed on site by the construction supply chain.
Riser shafts start as a series of openings in each floor, stacked one above the other on every storey. Once enclosed by walls, these openings connect to form a continuous shaft. RiserSafe® is a simple concept: it consists of a steel box with a floor plate on top that permanently forms and covers the opening. This design prevents falls from height and inhibits the spread of smoke and fire during construction and throughout the lifespan of the building. RiserSafe® also serves as a casting or fixing point for passive fire protection, such as dry-lined or blockwork walls, which, together with fire protection compounds, provide vertical and horizontal fire compartmentation.
Each RiserSafe® unit is 3D modelled to align with the design intent of its specific location within the project and is manufactured to accommodate the vertical routing of mechanical, electrical, and plumbing (MEP) services that feed the building. The design of the unit is standard, with only the length, width and depth varying to meet the design intent of the service riser openings within the floor slab of each project.
The RiserSafe® unit is manufactured using a Zintec-coated 'C' section steel frame, along with 6–8 mm durbar floor plates that have been shot blasted and red oxide primed (26–30 μm thick). The joist hangers are also made of Zintec-coated steel. The back section of the joist hangers has teeth which locate into the inside wall of the 'C' section.
Since MEP services require maintenance in any building, technicians must be able to work safely within the riser shaft zone. RiserSafe® has a safe working load (SWL) of 2.5 kN/m2 (250 kg/m2), which is more than adequate to ensure safety for individuals working in these vital arteries of a building.
Corrosion protection:
The RiserSafe® has been designed for internal use, but during its installation may be exposed to weather. Therefore, the perimeter frame is manufactured from 3 mm steel with a Zintec coating, which, in brief, is an electro-galvanized coating of pure zinc layer on both sides.
Features and benefits:
Color | Red Guidance for specification option: Steel, shot blasted and primed with red oxide primer (26–30 μm thick). Grey |
Finish | Shot blasted Primed Galvanized Guidance for specification option: Electro-galvanized. |
Material | Steel Guidance for specification option: Joist hangers: Zintec coated steel, the back section of the joist hangers has teeth which locate into the inside wall 'C' section; relocation beams: steel, shot blasted and primed with red oxide primer (26–30 μm thick). |
Shape | Rectangle Triangle Other |
Length | Bespoke |
Width | Bespoke |
Height | Bespoke |
Warranty description | Lifetime Manufacturer guidanceGuarantee for the design life of a building. Manufactured to provide a safe working load (SWL) of 2.5 kN/m² (250 kg/m²). |
Uniclass | |
CAWS | E60/210 Floor E20/225 Permanent formwork for suspended floors E20/230 Modular riser flooring units E20/145 Permanent formwork E40/440 Load transfer systems L37/150 External handrails E20/70 Formwork |
Product range |
Classification data | |
Standard | To BS EN 10025-2 for riser plate, BS EN 10152 for support frame, and BS EN 10219-1 for support beams. |
Certification | UKCA, FORS gold standard. |
Designation | S275JR+AR for riser plate, DC01+ZV for support frame, and S235JRH for support beams. |
Plate | 6 mm thick durbar floor plates, shot blasted and red oxide primed (26–30 μm thick). Blank or pre-cut with MEP service penetrations. Manufacturer guidanceNote: The main contractor is responsible for providing the riser flooring and all associated secondary support steelwork to ensure safe and accessible access to the risers, with adequate working space for maintenance and inspection. The main contractor is also responsible for the complete design, coordination, and installation of the riser flooring systems. This includes the provision of kick plates, soaker plates, and handrails as necessary, all in compliance with best practice guidelines from the Health and Safety Executive (HSE). |
Frame | 3 mm Zintec coated steel 'C' section with 3 mm backplate and bottom flange. Concrete embedment tangs welded to RiserSafe® unit at 600 mm centres. 75 x 75 x 6 mm RSA brackets. Guidance for specification option: Frame to the depth of the floor slab, dropped beam, or concrete upstand, according to structural design intent. Riser floor fixing solution to suit the particular structural openings in the area in which they are located. Manufacturer guidanceMEP riser and shaft wall openings: To the details set out in the Structural Engineer's drawings and specifications. |
Size | As drawings. Guidance for specification option: Insert reference. Units larger than 1000 x 1000 mm are supplied with removable toothed joist hangers and supporting relocation beams. Beam hangers will be used to allow beams to function at right angles. |
Additional supports | |
Size | 60 x 100 x 5 mm RHS relocation beams. 60 x 100 x 5 mm RHS relocation beams, welded to provide fixing points for fire-rated walls. Guidance for specification option: Fixing points can be provided for FR 30/ 60/ 90/ 120 dry-lined walls, as required. |
Material and finish | Steel, shot blasted and red oxide primed (26–30 μm thick). |
Fixings | Floor plates: Fixed with 5/16 hex head 5.5 x 38 mm tek screws. Wall plates: Fixed with M16 RAWL HPIIZF-16140/20 throughbolt anchors U.N.O. - refer to supplier's drawings. |
Prepared openings | As drawings. Guidance for specification option: Insert requirements. Manufacturer guidanceNote: Temporary protection of holes during the contract works is not covered by this specification. Temporary protection must determined by the main contractor. |
Fire-stopping | Not required. 120 minutes REI in combination with fire compound, 90 minutes RE. Guidance for specification option: If fire compound (provided by others) is required, the floor plate must be lowered by 100 mm. Please refer to the manufacturer's literature for more details. The fire stopping must be provided by others post-installation of all services. Where designated for the application of fire stopping, the RiserSafe® floor and all associated fixings will be purpose-designed and certified for two-hours fire rating (stability, integrity, and insulation), once the fire stopping is applied as a combined system. |
Integral accessories | 3 mm Zintec steel joist hangers/hook plates and beam hangers. Soaker plates (mechanical and electrical). Cover plates for all MEP cut-outs. Stencilled lettering “remove for services” (RFS) on cover plates, 6 mm fillet welded lifting eyes. |
Reaction to fire | To EN 13501-1, Class A1 (non-combustible). Guidance for specification option: Up to 1000°C for 90 minutes. |
Safe Working Load | 2.5 kN/m² UDL. |
Tolerances | +/- 5 mm manufacturing tolerance. |
Brackets | Manufacturer's standard. Manufacturer guidanceBrackets are included as part of the RiserSafe® system. Refer to the manufacturer's literature for details. Please note, Ambar Kelly does not supply Halfen channels and fixings. |
Secondary support structure | 100 x 60 x 5 mm RHS firewall beams welded to RiserSafe®, wrapped in fire boarding (by others). Guidance for specification option: The 'C’ section is removed in firewall beam locations and Durbar plate supplied to close off gap during construction. |
Verification | Submittals: Drawings of all prefabricated modular riser flooring units, in PDF and DWG formats, showing dimensions and layout, safe working load, and safety-critical installation steps, and a 3D model of the permanent maintenance modular riser flooring units. Manufacturer guidanceAmbar Kelly provides coordinated drawings at scales suitable for review, coordination, and fabrication. Drawings are compliant with Common Data Environment (CDE) naming conventions. Ambar Kelly coordinates directly with Architectural, Structural, and MEP (Mechanical, Electrical, and Plumbing) contractors, incorporating their RVT/IFC models. Ambar Kelly provides an Autodesk Revit tool (templates, families, or plugins as required) for the modular riser flooring unit to the design team, enabling them to design interface details with structural elements, MEP services, and fire compartmentation requirements (both horizontal and vertical). |
Timing | Drawings: Submit before fabrication. 3D model: Submit before integration into the federated model. |
Contains Red List materials | Manufacturer guidancePrimary raw material is steel, at present the best option for stability, strength and non-combustibility required by regulation, guidelines, and codes of practice. However, Ambar Kelly are a carbon neutral company through off setting and have an audit annually to confirm their credibility. |
Country of material origin | United Kingdom |
Country of product manufacture | United Kingdom |
Material | Steel Guidance for specification option: Joist hangers: Zintec coated steel, the back section of the joist hangers has teeth which locate into the inside wall 'C' section; relocation beams: steel, shot blasted and primed with red oxide primer (26–30 μm thick). |
Carbon dioxide equivalent | |
Carbon dioxide equivalent, as defined in BS EN 15804 Self-declared | |
Stage Normalised unit (kg CO₂ eq/kg) Declared unit (kg CO₂ eq/kg) Stage:A1–A3 ('Production stage') Normalised unit 2.84 (kg CO₂ eq/kg) : Declared unit 2.84 : Manufacturer guidanceCradle-to-Grave assessed. | |
Recyclability | 98% |