Verified by manufacturer 5 months ago
BBA Agrément Certificate
Certificate type
Mechanically fixed PVC single-ply membrane water attenuation blue roofing system for warm roof constructions.
Water attenuation blue roofing system for new and existing roofs that includes Protan BP 1.8 mm thick roofing membranes manufactured from PVC with a core of polyester reinforcement.
The product is to be installed as exposed roofing, allowing rainwater to accumulate to a predefined maximum level and be stored on the roof for a certain amount of time after rainfall. Water run-off is then gradually permitted into the into the building's drainage system before entering the drainage network. This avoids water overloading, which can result in flooding. Joint welding is carried out using hot air.
Features and benefits:
Substrates:
Can be used on the following:
Manufacturer recommends that at least one additional overflow is installed into the parapet for protection.
Color | Grey |
Finish | Anti-skid |
Material | PVC Guidance for specification option: Manufactured from polyvinyl chloride (PVC) with a core of polyester reinforcement. Manufacturer guidanceManufactured from polyvinyl chloride (PVC) with a core of polyester reinforcement. |
Shape | Rectangle Guidance for specification option: Blue Roofs are specifically designed, the rolls are 1 & 2m wide, and lengths can be made to measure/project-specific, or standard rolls 15m long. |
Length | Bespoke |
Width | 1000 mm 2000 mm |
Warranty description | 15 year 20 year 25 year Manufacturer guidanceProduct only warranty and single point system warranty available, consult Protan for details. |
Uniclass | |
CAWS | J42/10 Warm deck roof covering J42/110 Warm deck roof covering |
Lower protection layer | Not applicable.Guidance for specification option: There should be no requirement for this layer. |
Air and vapour control layer | |
Type | Protan PE Air Vapour Control Layer.Guidance for specification option:
Protan Self-adhesive Air Vapour Control Layer.Guidance for specification option:
Protan Torch-on Air & Vapour Control Layer.Guidance for specification option:
Manufacturer guidanceCondensation analysis should be carried out in accordance with BS 5250 to determine Air & Vapour Control Layer requirements for each project. |
Attachment | Laid loose.Bitumen primer.SA synthetic rubber primer |
Insulation | |
Type | EPS.Guidance for specification option: Protan F2B fleece is required as a separation layer between EPS insulation and PVC membrane (specify below). Kingspan polyisocyanurate (PIR) - TR26 foil-faced flat insulation system.Kingspan polyisocyanurate (PIR) - TT26 foil-faced tapered insulation system.ROCKWOOL Hardrock, Multi-Fix, Dual Density (DD), stone mineral wool board - Tissue-faced flat insulation system.ROCKWOOL Hardrock, Multi-Fix, Dual Density (DD), stone mineral wool board - Tissue-faced tapered insulation system.Manufacturer guidanceInclusive system warranty available, consult Protan UK. |
Attachment | Mechanically fixed.Guidance for specification option: R75 telescopic tube washers and Protan UK specified fixings required for the deck type. In accordance with Protan's design requirements. Manufacturer guidanceMechanically fixed using Protan approved fasteners. |
Separating layer | Not required.Guidance for specification option: When using Kingspan PIR (TR26/TT26/TR27/TT27) or ROCKWOOL Hardrock, Multi-Fix, Dual Density (DD), stone mineral wool board. F2B fleece.Guidance for specification option: Required as a separation layer between EPS insulation and PVC membrane. Manufacturer guidanceOnly required between the PVC membrane and EPS insulation. |
Waterproof covering | |
Type | Protan BP Membrane. |
Attachment | Mechanically fixed.Guidance for specification option: R48-3N Telescopic Tube Washers and Protan UK specified fixings. Refurbishment project.Guidance for specification option: Roof surveys, Fixings pull-out tests, and core samples will be required to determine requirements. Protan UK should be consulted regarding this process. Manufacturer guidanceProtan UK technical team carries out wind load calculations to determine fixing requirements in accordance with BS EN 1991-1-4-2005 + A1-2010. |
Joints | Hot air welded laps.Guidance for specification option: 1m wide sheets can be welded using the handheld heat gun. 2m sheets must be welded using the automatic welding machine with a 40mm wide nozzle. Manufacturer guidance1m wide sheets can be welded using the handheld heat gun. 2m sheets must be welded using the automatic welding machine with a 40mm wide nozzle. |
Accessories | Not required. |
Upper protection layer | Not applicable. |
Surface protection | Protan Progrip R Walkway.Guidance for specification option:
Protan GT 2.4mm Walkway.Guidance for specification option:
Protan Walkway Tile.Guidance for specification option:
Manufacturer guidanceWalkways can be added for maintenance or regular access purposes. One or all of the walkways can be utilised to achieve the required level of protection. The type of walkway will be dependant on the intensity of traffic on the roof, e.g. annual roof maintenance, or regular movement of material like compressed gas cylinders in a Hospital. |
System accessories | Nor required.Protan Approved "BlueProof" Outlet Restrictor.Guidance for specification option: A restrictor is required in conjunction with every Protan ProJual Rain Water Outlet as part of a Blue Roof System. Protan Approved Fixings.Guidance for specification option: Protan UK will specify the required fixings following and wind load calculation. Protan Approved Mastic.Protan BP "T-Joint" Patches.Guidance for specification option: The T-joint patch is required on every T-joint as a secondary precaution as the roof will be holding water during attenuation. Protan Cover Strip.Guidance for specification option: Required to cover terminations and their fixings e.g. at drip edges, water checks, and internal changes of angle to the structure. Protan Grip Bar.Guidance for specification option: Required at every internal change of angle. To terminate top of upstands where Protan laminated metal has not been used. Protan Laminated Metal.Guidance for specification option: Drip edges, Water Checks, Wall Chases, Insulated Abutments, Weir Outlets, Internal & External angles, 1m x 2m Flat Sheets, and custom fabrications available. Protan Lightning Conductor Clips.Guidance for specification option: The membrane pad of the conductor clip is welded directly to the membrane of the finished roof, most commonly at 1m centres. Protan Omega Profiles.Guidance for specification option: Used to create the visual effect of a metal standing seam roof. The profile is fully welded directly to the finished membrane at the required centres, usually set out to hide the lines of the membrane laps. Protan Prefabricated D Membrane External Corners.Guidance for specification option: All External corners require a patch. Prefabricated details can be utilised to save installation time on-site. Protan Prefabricated D Membrane Internal Corners.Guidance for specification option: All Internal corners require a patch. Prefabricated details can be utilised to save installation time on-site. Protan Prefabricated Pipe Collars.Guidance for specification option: Prefabricated details can be utilised to save installation time on-site. Protan ProJual Rainwater Outlets.Guidance for specification option: Used in conjunction with the BluePoof outlet restrictor and drainage design of the Blue Roof. Protan Stainless Steel Jubilee Clip.Guidance for specification option: Required to terminate the top of a pipe detail, e.g. SVP, Boiler flue, handrail post, steel box sections. Protan Walkway Membranes.Guidance for specification option: There are 3 types of walkway which can be utilised based on the level roof access requirements. Manufacturer guidanceOnly Protan approved products can be used as part of the Protan warranties. |
System completion | Manufacturer guidanceFor a roofing project to be signed off and approved for a warranty all of the following options are required. |
Product Reference | Protan BlueProof Mechanically Fixed - Warm Roof System |
Width | As manufacturer's recommendations. Guidance for specification option: The Protan UK technical department must carry out a wind load calculation for every project to provide suitable membrane width requirements. Manufacturer guidanceThe Protan UK technical department must carry out a wind load calculation for every project to provide suitable membrane width requirements. |
Thickness | 1.8 mm. |
Weight | ≥2.1 kg/m². |
Foldability at low temperature (to EN 1107-2) | ≤−30°C. |
Dimensional stability (to EN 1107-2) | ≥-0.5 and ≤0.5%. |
Water tightness (to EN 1928) | Pass. |
Resistance to tearing (EN 12310-2) | ≥450/300 N. |
Tensile strength (to EN 12311-2) | ≥1800/1400 N/50 mm. |
Elongation at break (to EN 12311-2) | ≥15%. |
Peel resistance of joints (to EN 12317-2) | ≥150 N/50 mm. |
Shear resistance of joints (to EN 12317-2) | ≥1000 N/50 mm. |
Water vapour resistance (to EN ISO 12572) | 27 m. |
Colour | Dark grey. Guidance for specification option: Dark Grey only as a standard membrane. Other colour options available with a minimum order of 3000m² Manufacturer guidanceDark Grey only as a standard membrane. Other colour options available with a minimum order of 3000m² |
Country of material origin | Norway |
Country of product manufacture | Norway |
Recyclability | 100% recyclable Manufacturer guidanceMechanically fastened membranes and system components can be recycled at the end of life. |