NBS Source
I'm a manufacturer
Compare variants

Floor Mounted Armco Barrier System - RB1X - Spring Steel Buffer System

Verified by manufacturer 22 days ago

Post: RBIX 76x12 (75 kN)

Berry Systems Variant:
Third party certifications:
  • Achilles Information Limited - Procurement Management

    Achilles Information Limited - Procurement Management

    Certificate type

  • Acclaim Accreditation

    Certificate type

  • CHAS

    CHAS

    Certificate type

  • Constructionline Gold

    Constructionline Gold

    Certificate type

  • BSI Kitemark

    BSI Kitemark

    Certificate type

  • Fleet Operator Recognition Scheme

    Fleet Operator Recognition Scheme

    Certificate type

  • FSC

    FSC

    Certificate type

  • CQMS

    CQMS

    Certificate type

  • PEFC

    PEFC

    Certificate type

  • The Railway Industry Supplier Qualification Scheme

    The Railway Industry Supplier Qualification Scheme

    Certificate type

  • Alcumus SafeContractor

    Alcumus SafeContractor

    Certificate type

Floor mounted spring steel vehicle restraint systems (VRS).

Jump to:
+44 (0)1902 491100 Website

Application

  • Warehouses.
  • MSCP perimeter.
  • Ground level car parks.
  • Service yards.
  • Loading bays.
  • Ramp barriers.

Description

The RB1X Buffer is a spring steel post which is available with a combination of various beam profiles and post thicknesses. This allows it to be used in all types of applications, making it very cost effective.


By reducing post centres, deflection can be contained within the barrier area of RB1X Flexible Spring Steel Buffers for an economic footprint.


In order to spread the impact load on the buffer over a wider surface, a base plate can be used to avoid damage to the substrate and to assist in levelling the buffer installation on uneven surfaces.


Features and benefits:

  • Reduced installation time: The single anchor fixing method is beneficial in reducing drilling time (HAVS) and decreasing time on site.
  • Lightweight: The spring steel posts are lightweight and easily maneuvered into position for installation. The design also means the barrier system absorbs the impact load and reduces the tension transferred into the slab.
  • Fully compliant: Independently tested to BS 6399, also meeting new European Standards BS EN 1991.1.1, which has superseded the British Standard (except 75 kN which is un-tested).
  • Can be used in conjunction with an anti-climb mesh and BS 6180 compliant handrail.
  • Reduces the loading onto the concrete slab by around 50%.
  • Shallow embedment available.

General information

Color

Silver

Finish

Galvanized

Material

Steel

Shape

Rectangle

Other

Length

Bespoke

Width

Bespoke

Height

Bespoke

Warranty description

One year

Third party certifications

Achilles Information Limited - Procurement Management

Achilles Information Limited - Procurement Management

Achilles Network Member

Achilles Information Limited - Procurement Management

Achilles Information Limited - Procurement Management

Achilles UVDB Certificate of Registration

Achilles Information Limited - Procurement Management

Achilles Information Limited - Procurement Management

BuildingConfidence Acceditation

 Acclaim Accreditation

Acclaim Accreditation

Certificate of Health and Safety Accreditation

CHAS

CHAS

Common Assessment Standard - Elite Assured

Constructionline Gold

Constructionline Gold

Constructionline Gold Membership

BSI Kitemark

BSI Kitemark

ENVIRONMENTAL MANAGEMENT SYSTEM - ISO 14001:2015

Fleet Operator Recognition Scheme

Fleet Operator Recognition Scheme

FORS Silver

FSC

FSC

FSC - Certificate of Registration

CQMS

CQMS

Mutual Recognition Certificate

BSI Kitemark

BSI Kitemark

Occupational Health and Safety Management System - ISO 45001:2018

PEFC

PEFC

PEFC - Certificate of Registration

BSI Kitemark

BSI Kitemark

QUALITY MANAGEMENT SYSTEM - ISO 9001:2015

The Railway Industry Supplier Qualification Scheme

The Railway Industry Supplier Qualification Scheme

RISQS - Certificate of Audit

The Railway Industry Supplier Qualification Scheme

The Railway Industry Supplier Qualification Scheme

RISQS - Certificate of Verification

Alcumus SafeContractor

Alcumus SafeContractor

SafeContractor Accreditation

Literature

Floor Mounted - RB1X

Floor Mounted - RB1X

Case studies

Dingwall Road, Plymouth

Dingwall Road, Plymouth

London Heathrow Airport

London Heathrow Airport

Coventry Barracks Multi Storey Car Park

Coventry Barracks Multi Storey Car Park

Westfield, Stratford

Westfield, Stratford

Birmingham New Street

Birmingham New Street

Derriford Hospital Multi Storey Car Park

Derriford Hospital Multi Storey Car Park