NBS Source
I'm a manufacturer
Instarmac Group plc

Instarmac Group plc

Highway Maintenance. Mortar Paving System. Tile Adhesives and Grouts. Commercial Flooring.

+44 (0)1827 254400 Website

Sort by:

Showing 1-36 of 38

Sponsored
Bradford City Park

Bradford City Park

Instarmac Group plc

UltraScape Pro-Bed HS, Pro-Prime and Flowpoint ECO are being used to help make Bradford’s City Park a world class public park. Bradford Council, in conjunction with landscape architect Gillespies and consulting engineer Arup, have specified UltraScape’s Pro-Bed HS Bedding Mortar, Pro-Prime Slurry Primer, EP-R9 Epoxy Bedding Mortar and Flowpoint ECO flowable grout – in Natural and Charcoal – for use by the main contractor Birse Civils, to lay the setts, porphyry and sandstone in and around the Mirror Pool.
Sponsored
Dubai World Expo

Dubai World Expo

Instarmac Group plc

Flowpoint creates visual marvel at Dubai World Expo
Sponsored
MediaCityUK, Manchester

MediaCityUK, Manchester

Instarmac Group plc

Ultrascapes’s Pro-bed HS, Pro-Prime and Flowpoint have been performing to the highest standard at Manchester’s £650 million development, MediaCityUK. Landscape paving contractor, English Landscapes, specified Ultrascape products for 40,000m² of paving at the high profile development. Over 2000 tonnes of Pro-Bed HS bedding mortar was supplied in bulk silos which provided a perfect base for the stone to be laid on. Pro-Prime slurry primer and the innovative Ultrascape Flowpoint flowable rapid setting grout were also used throughout the development. Flowpoint enables large areas to be grouted with this pourable material.
Sponsored
Mortar Buoy increases speed and saves money

Mortar Buoy increases speed and saves money

Instarmac Group plc

UltraCrete’s latest product innovation, Mortar Buoy®, has been used by AL Civils to reinstate a CW2 cover on a busy Shropshire road.BackgroundAL Civils, experienced utility contractors, have many years of experience reinstating and repairing access covers across the north west of England. As part of their routine repair works, AL Civils were required to reinstate a defected CW2 cover on a busy Shropshire road.The ChallengeIn order to provide the best possible results and minimise disruption to motorists, AL Civils were keen to try UltraCrete Mortar Buoy®, a ground-breaking access cover installation aid, to help increase speed, reduce costs and make the installation process less labour intensive.The SolutionAL Civils specified Saint Gobain’s Install Plus installation method, which was used alongside UltraCrete Mortar Buoy® and Envirobed® CD534 Flowable.UltraCrete Mortar Buoy® is an inflatable device that acts as a dam, allowing for a flowable mortar ironwork installation within seconds – revolutionising traditional methods.The Mortar Buoy® inflatable dam prevents any mortar seeping into the access chamber providing an efficient and seamless finish to the bedding around the chamber. This allows a single pour installation of Envirobed® CD534 Flowable, which encapsulates the flange of the access frame creating a solid bed and backfill in one.UltraCrete Mortar Buoy® is so easy to use, simply hold in place and inflate, and is guaranteed to save you time on-site as there is no waiting around for the dam to dry. Mortar Buoy® can be wiped clean and re-used on a number of installations and is available in 5 sizes to accommodate all ironwork and gully reinstatements.“Mortar Buoy® seems to be the future – no more messing around with damming mortar. Great products and innovations as always.” Michael Day, Area Manager at AL Civils.The reinstatement took place on a busy non-residential road on a mild, rainy November day in Malpas, Shropshire.The Results“Innovative products make our life so much easier. Mortar Buoy®, Envirobed® CD534 Flowable and QC10 F 100% makes life easier and saves money.” Michael Day, Area Manager at AL Civils.
Sponsored
Swindon Station is back on track with Ultrascape's Mortar Paving System

Swindon Station is back on track with Ultrascape's Mortar Paving System

Instarmac Group plc

Ultrascape's BS 7533 compliant mortar paving system has been used to deliver a modern and stylish forecourt outside Swindon railway station. The redevelopment has transformed what was previously a heavy traffic dominated area, into a prestigious pedestrian focused arrival space which features seating, planting, lighting and a millennium clock. Work was carried out by specialist civil engineering contractor, Britannia Construction and included the installation of 500 tonnes of high quality natural granite and Pennant Sandstone using Ultrascape's Pro-Bed HS fine bedding concrete, Flowpoint rapid setting grout and Pro-Prime slurry primer.
Sponsored
The drinks are on UltraFloor

The drinks are on UltraFloor

Instarmac Group plc

Riding Floors Ltd, contractors with over 50 years’ experience creating stunning hospitality venue floors, have used UltraFloor Prime IT Multi-surface Primer and Level IT Bond to install a beautiful LVT floor at The Heist pub in Elland, West Yorkshire.BackgroundLocated in a former Lloyds Bank, hence the name, The Heist has been lovingly created by two local business owners who have transformed the building into a smart and atmospheric pub. Earlier this year, the bar and daytime coffee bar was transformed by experienced flooring contractors, Riding Floors Ltd.The ChallengeThe highly experienced team at Riding Floors Ltd. required rapid drying expert subfloor preparation materials that would provide a super smooth finish to install the LVT floor covering.The SolutionWith a reputation built on quality workmanship, Riding Floors Ltd knew that UltraFloor would be the ideal subfloor preparation materials to use on this project.To prepare the concrete substrate for the application of Level IT Bond, the contractors first applied a coat of Prime IT Multi-surface Primer.Formulated to promote adhesion to all UltraFloor smoothing underlayments, Prime IT Multi-surface Primer reduces pinholing, minimising the risk of costly failures. With a coverage rate of 200sqm at 3:1 dilution, Prime IT Multi-surface Primer is a must-have product for all flooring installation projects.Once fully dried, Level IT Bond was applied at a 3-8mm depth across the 180sqm bar area. Level IT Bond is a rapid curing, high performance, free flowing two-part smoothing underlayment. It has exceptional adhesion characteristics making it suitable for use over a wide variety of subfloors and substrates, including old adhesive residues.This versatile and moisture tolerant floor leveller has a set time of 90-120 minutes, can receive foot traffic in as little as 1.5 – 2 hours, and can receive bonded floor coverings after just 4 hours – ideal for projects where a quick turnaround is essential.With a coverage of approximately 5sqm at 3mm and an exceptional flow, it is unsurprising that Level IT Bond is a firm favourite for today’s flooring contractor.ResultsThanks to the rapid setting properties of Level IT Bond, the entire project was finished in one week. On completion, Danny Ambler, Contracts Manager at Riding Floors Ltd commented: “The customer loved the finished job. Level IT Bond is a great product, flows well and can be used on multiple substrates.”
Sponsored
Top Marks for UltraScape at Birmingham University Library!

Top Marks for UltraScape at Birmingham University Library!

Instarmac Group plc

UltraScape’s BS 7533 Compliant Mortar Paving System has been used in the construction of Birmingham University’s new state of the art library. O’Brien Contractors installed hard and soft landscaping around the prestigious new library, which included 1200m² of yellow rock granite. paving. UltraScape’s Pro-Bed HS provided a perfect bound base. It can be laid up to 75mm in one pass. A special order of Flowpoint buff was produced for this project to compliment the paving elements. UltraScape’s Paving Guard surface sealant was applied once the grout had set to help preserve the installation.
Sponsored
Tough Patch repairs dangerous pothole on M180

Tough Patch repairs dangerous pothole on M180

Instarmac Group plc

Leading infrastructure services company, Amey, have used UltraCrete Tough Patch® to repair a failed pothole on the M180.BackgroundLocated between Junction 3 and Junction 2 of the M180, a dangerous pothole was once again in need of urgent repair and Amey Highway Infrastructure Area 12 were the team to fix it for the last time.The ChallengeThe biggest challenge facing Amey was the location of the pothole. The repair needed to be carried out quickly, but permanently, to keep motorists and operatives as safe as possible whilst working on this extremely busy road.The SolutionTo complete the repair, Tough Patch® was applied in 100mm layers and compacted until the same level as the surrounding carriageway.Tough Patch® is a PTS PAS approved, cold lay surface material for road repairs, which utilises a reactive binder that rapidly cures to create a first time, permanent repair that will accept traffic immediately after installation. By utilising Tough Patch®, the amount of time needed for closures and traffic management can be reduced, resulting in a significantly safer working environment for operatives carrying out the work.Quick and easy to apply, Tough Patch® can be used to repair defects in pavements, driveways, car parks and on high speed roads – it even provides a first time permanent repair in wheel turning locations such as junctions, traffic lights and roundabouts.ResultsThe hazardous site was repaired quickly and motorists along the M180 are now enjoying a pothole-free journey.On using Tough Patch®, an Amey representative commented: “Tough Patch is very easy to use and spreads with no big chunks and doesn’t go hard if opened and only used half of the tub.”
Sponsored
Tough Patch saves Ringway Jacobs time and money

Tough Patch saves Ringway Jacobs time and money

Instarmac Group plc

Ringway Jacobs, on behalf of Essex Highways, have permanently repaired a dangerous pothole using UltraCrete Tough Patch®.BackgroundA large pothole had been causing disruption to motorists and homeowners in Great Notley in Essex. Located in the wheel track of a busy residential road, the pothole needed repairing quickly and permanently to minimise disruption and eliminate any potential damage to vehicles.The ChallengeRingway Jacobs had been let down by a number of pothole repair materials in the past, causing further disruption and upset to motorists, and costly repeat visits for them. Finding a first time permanent solution was of the utmost importance to the team at Ringway Jacobs.The SolutionBefore the damaged area was repaired, any loose debris was removed to create a dust and contaminant free area. Once clear, the vertical edges and surface base was sprayed with SCJ seal and tack coat spray to prevent water ingress and improve bond. Once applied, Tough Patch® was poured into the pothole and compacted with a plate.To complete the repair, Instaband ECO thermoplastic overbanding tape was applied to each edge to prolong the life of the repair.Tough Patch® is a PTS PAS approved, cold lay surface material for road repairs, which utilises a reactive binder that rapidly cures to create a first time, permanent repair that will accept traffic immediately after installation. By utilising Tough Patch®, the amount of time needed for closures and traffic management can be reduced, resulting in a significantly safer working environment for operatives carrying out the work.Quick and easy to apply, Tough Patch® can be used to repair defects in pavements, driveways, car parks and on high speed roads – it even provides a first time permanent repair in wheel turning locations such as junctions, traffic lights and roundabouts.Results“Tough Patch is very workable and maintains that throughout the colder seasons much better than any other product we have used. It goes down very well and gives a similar finished appearance to hot tarmac. Being able to carry as much as we need and not suffering any waste really helps us save time and money. Other products in the past have given us failures but since using Tough Patch, this has not been the case for us.” Aidan Fitzgerald, Area Supervisor at Essex Highways.
Sponsored
UltraCrete and Telent join forces to tackle failed ironwork

UltraCrete and Telent join forces to tackle failed ironwork

Instarmac Group plc

Leading UK utility contractor, Telent, have used UltraCrete’s superb ironwork installation materials to repair and install a CW1 access cover in Sutton Coldfield.BackgroundAs part of their ongoing commitment to maintaining the UK’s national utility infrastructure, Telent have used UltraCrete’s latest product innovation Mortar Buoy® to repair a chamber and install a CW1 ironwork access cover in the West Midlands.The ChallengeLocated on a busy junction, it was crucial that the repair and installation of the CW1 cover was carried out quickly to minimise disruption to motorists. With a reputation drawing on decades of experience in the design, build, support and management of the UK’s critical infrastructure, it was imperative that Telent used reputable installation materials that had been tried, tested and proven to work in the road network.The SolutionUltraCrete’s independently tested and approved ironwork installation system was specified by BT Openreach to complete the project.The new CW1 cover was installed using the Install Plus method. To begin, Mortar Buoy® was inflated in the existing chamber to prevent debris falling into the cavity and causing potential damage to the network. Once inflated, the team were able to use Mortar Buoy® as internal shuttering and repair the damaged chamber using QC10 F rapid strength flowable concrete.QC10 F, part of UltraCrete’s range of high specification concretes, is rapid setting fibre modified concrete for backfilling around manhole frames and gullies and for surface repairs.To complete the installation, Mortar Buoy® was used as a dam and Envirobed® CD534 Flowable was poured around the edges of a chamber for a permanent installation.Specially formulated for utility reinstatements, Envirobed® CD534 Flowable high performance bedding mortar is BT LN550 and LN320 compliant and offers superior compressive, tensile and flexural strengths in just 3 hours.Mortar Buoy® is a ground-breaking, innovative, inflatable access frame that acts as a dam, allowing for a flowable mortar ironwork installation in seconds – revolutionising traditional methods.Enhance your specification and upgrade your reinstatement with UltraCrete Mortar Buoy®.ResultsThe project took place on a mild winter day in December 2021. The work was completed without delay and with minimal disruption. Using Mortar Buoy® instead of a traditional damming mortar increased the speed of the installation, reduced costs and made the install less labour intensive for the team.On the performance of Mortar Buoy®, John Doherty, Area Supervisor for Telent commented: “Mortar Buoy® makes life much easier versus traditional shuttering for both chamber repair and bedding the ironwork. It is also much faster.”
Sponsored
UltraCrete prevents dangerous accident in Carmarthen

UltraCrete prevents dangerous accident in Carmarthen

Instarmac Group plc

MJ Quinn and subcontractors, HT Installations Limited, have used UltraCrete’s market-leading Flowable Installation System to repair a faulty carriageway frame and cover on the B4299 in Carmarthen.BackgroundA large section of a rural road in Carmarthen was severely damaged. The area in question is located at the bottom of a hill and over time, the relentless force in which cars and tractors have hit the road surface has severely deformed the surface.The consequence of this damage also caused structural damage to a nearby carriageway frame and cover.The ChallengeLocated on the B4299, this rural road is the main thoroughfare for the village, with tractors and cars using the road daily. The repair needed to be carried out quickly to minimise disruption, and most importantly, it needed to be a first time permanent repair to prevent any further disruption and damage to the surrounding road surface.In this instance, HT Installations Limited, the subcontractor working on behalf of MJ Quinn, the main contractor for Wales for Openreach, were only responsible for repairing the frame, cover and trim back area. However, in order to prevent further deterioration caused by the deformed road surface, HT Installations went above and beyond and replaced the heavily deteriorating asphalt on the CW2 frame and covers leading edge. This would ensure a longer life expectancy for the new carriageway frame and cover installation and avoid costly return visits.The SolutionHT Installations Limited utilised UltraCrete QC10 F flowable fibre modified concrete to repair the brickwork chamber and their Envirobed® Flowable Installation System to install the replacement CW2 frame and cover – a process used by Openreach for all their carriageway repairs.To begin, the entire area was excavated and spoil removed. The contractors assessed the chamber and utilised the Mortar Buoy® installation aid within the chamber as an alternative to formwork/shuttering. They proceeded to mix and pour UltraCrete QC10 F, rapid set flowable concrete, to repair the damaged concrete chamber. Utilising Mortar Buoy® significantly speeds up the repair process, helping to save you time and money.QC10 F sets in less than 20 minutes, so a very short time after being poured, Mortar Buoy® was re-inflated inside the chamber and the CW2 frame dropped into position ready for levelling with the existing road surface. A sand bund was then formed 50mm beyond the flange edge, as opposed to shuttering, to retain the flowable mortar.UltraCrete Envirobed® CD534 Flowable Red was mixed and applied to fully encapsulate the frame flange up to 20mm above and 50mm beyond the frame edge. Envirobed® CD534 sets within 20 minutes, allowing the sand bund to be swept clear and site prepared for hot asphalt application, really quickly.ResultsThanks to the rapid high strength gain and setting superior performance qualities of UltraCrete’s Flowable Installation System, HT Installations were able to carry out their repairs quickly, safely and permanently, much to the delight of MJ Quinn, Openreach and the local residents.
Sponsored
UltraCrete repairs troublesome chamber on busy London road

UltraCrete repairs troublesome chamber on busy London road

Instarmac Group plc

Road users in Kensington Church Street in Bayswater, are now enjoying a peaceful commute after Openreach and Centercomms Ltd replaced a long-standing failed access cover using UltraCrete’s market-leading access cover reinstatement materials.BackgroundClient Openreach, and contractors Centercomms Ltd, were once again required to repair a failed ironwork chamber on a busy central London street – the longest standing failed unit on their work stack.The ChallengeThe troublesome unit was located on Kensington Church Street in Bayswater – an extremely difficult and busy area in Central London. Working in London can be challenging as traffic management permits can be difficult to obtain and, due to heavy traffic, all work must be completed within 9.30am – 3.30pm.As well as a tight turnaround, upon arrival it became clear very quickly that chamber was damaged and the brickwork needed to be excavated.The SolutionWith this in mind, contractors Centercomms Ltd, working for, and on behalf of, Telent, chose to use UltraCrete’s market-leading maintenance solutions to replace the failed unit. UltraCrete has a reputation of providing the industry with expert and approved materials that reach required compressive strengths very quickly, helping operatives to complete installations before the 3.30pm deadline.To begin, the damaged brickwork was removed and timber shuttering installed using UltraCrete QC10 F. This fast, strong and easy to use flowable concrete provides an extremely robust repair in just 20 minutes.Using the SG Pam Install Plus frame installation system, Centercomms Ltd carefully placed the frame and used a string line to ensure it was level with the existing road surface.Once in position, Envirobed® CD534 Red high performance bedding mortar was applied to the inner face and chamber top and the timber shuttering was then placed 50mm beyond the flange.After Envirobed® CD534 Red had fully cured, Envirobed® CD534 Flowable Red was mixed and poured to fully bed and encapsulate the frame to a minimum depth of 35mm.To complete the installation, operatives returned the lid into position, applied SCJ seal and tack coat spray to the vertical edges of the existing road surface and frame ahead of the asphalt reinstatement.ResultsThe entire installation took just two and a quarter hours to complete, much to the delight of the client, contractors and road users.
Sponsored
UltraFloor brings imagination to life at leading family attraction

UltraFloor brings imagination to life at leading family attraction

Instarmac Group plc

UltraFloor are delighted to have supplied subfloor preparation materials to Specialist Screed (Flooring) Solutions Ltd. to complete a 180sqm project at leading family attraction, Hobbledown Farm.BackgroundHobbledown Farm is home to a huge variety of family attractions including animal experiences, indoor play area, Raptor Centre as well as a world of adventure in the Imaginarium. Part reptile house, part water play and part interactive jungle, the Imaginarium is an extremely popular attraction at Hobbledown which welcomes thousands a visitors a year.The ChallengeHobbledown Farm is open 7 days a week and therefore the 180sqm refurbishment project needed to be completed on time and without delay. What’s more, the interactive floor needed to have a perfectly flat finish so not to pose any trip hazards for the children playing in the barn.The SolutionWith a long and established relationship working with UltraFloor, the team at Specialist Screed (Flooring) Solutions Ltd knew that UltraFloor’s subfloor preparation materials would be perfect this exciting project.To begin, Specialist Screed (Flooring) Solutions Ltd applied UltraFloor DPM IT damp proof membrane to the clean, contaminant free subfloor and left it to dry for 2 days. Once dry, the team returned to apply a neat coat of UltraFloor Prime IT Multi-surface Primer before applying Level IT Renovate at a depth of 5mm.Level IT Renovate dried within 3.5 hours giving a solid, strong subfloor to lay the finished floor covering – Altro Operetta low glare for the interactive areas and Forbo Sure Step Laguna for the remaining areas.Formulated to promote adhesion to all UltraFloor smoothing underlayments, Prime IT Multi-surface Primer reduces pinholing, minimising the risk of costly failures. With a coverage rate of 200sqm at 3:1 dilution, Prime IT Multi-surface Primer is a must-have product for all flooring installation projects.Developed for the renovation of existing floors, Level IT Renovate is fibre reinforced for added strength and to minimise the risk of hairline cracks – reducing a common cause of failure.Suitable for deep applications from 3-40mm, Level IT Renovate is multi-purpose for extensive use and boasts excellent flow properties, making this flexible and versatile floor leveller ideal for a wide range of flooring substrates.What’s more, Level IT Renovate can also be used externally, as a light wearing surface, can be walked on in as little as 2 – 2.5 hours and can receive floor coverings in just 4 hours.Results“The materials used were all perfect for the job needed. Delivery was met by our chosen distributor and all fitted within the time frame required. UltraFloor is always my first choice of subfloor prep materials. I always get the best advice and guidance from the team at Instarmac.” Steve Fincham, Head of Specialist Projects at Specialist Screed (Flooring) Solutions Ltd.
Sponsored
UltraFloor enriches happiness at luxury care home

UltraFloor enriches happiness at luxury care home

Instarmac Group plc

CFA members, Midlands Flooring have used UltraFloor’s expert subfloor preparation materials to install 4,000sqm of flooring at a luxury, brand new, care home in Stratford-upon-Avon.BackgroundMorar Living is setting a new standard in care homes. Their beautiful new premises, Trinity Manor, has been expertly designed to provide the highest standard of safety and comfort for its residents. On this beautiful facility, Morar Living say: “The home is modern and the attention to detail is impressive. The high specification and décor of the home has been carefully considered by an interior designer, creating stylish yet comfortable practical and private spaces.”The ChallengeMorar Living are passionate about providing their guests with luxurious and comfortable homes. As well as providing beautiful surroundings, safety also plays a huge part in their design decisions. It was imperative that Midlands Flooring chose the best subfloor preparation materials to create a super smooth floor, with no lumps or trip hazards, in preparation for the installation of the chosen carpet, vinyl and LVT floor coverings.The SolutionUltraFloor and Midlands Flooring have partnered regularly on several projects with UltraFloor products delivering complete confidence and assurance every time.Familiar with the outstanding performance of UltraFloor materials, Midlands Flooring were confident they would get the job done with ease and deliver the results needed on time.Before any preparation work began, the team carried out thorough moisture testing to check the subfloor relative humidity. Once satisfied, the subfloor was mechanically grinded to remove any contaminants before DPM IT damp proof membrane was applied. DPM IT is a two component, solvent free epoxy resin system for use as a surface damp proof membrane. Designed to provide protection against subfloor moisture, DPM IT has a pot life of 45 – 75 minutes, a cure time of 5 hours and boasts a 98% RH floor moisture tolerance.Once cured, the entire 4,000sqm area was primed with one neat coat of Prime IT Multi-surface Primer before applying UltraFloor Level IT Two at a 3mm depth. Formulated to promote the adhesion to all UltraFloor smoothing underlayments, Prime IT Multi-surface Primer reduces pinholing, minimising the risk of costly failures. With a coverage rate of 200sqm at 3:1 dilution, Prime IT Multi-surface Primer is a must-have product for all flooring installation projects.There are many reasons why Level IT Two has become UltraFloor’s most popular floor leveller. Its exceptional flow characteristics make it a very easy material to apply to a variety of subfloors in both commercial and domestic flooring projects. Its low odour formulation means this fantastic all-rounder leveller is equally suited to confined areas, proving particularly popular in the education, health and hospitality sectors.With a set time of 2.5 hours, Level IT Two can receive bonded floor coverings after just 8 hours, making it an ideal choice for projects with a tight deadline. What’s more, because Level IT Two is available as a two component system, it takes the guesswork out of mixing, reducing site errors and guaranteeing a perfect application every time.ResultsThe project took place between December 2022 and May 2023 and thanks to the fantastic performance of UltraFloor and the talented team at Midlands Flooring, the job was completed on time, with no problems.On using UltraFloor, Midlands Flooring commented: “Level IT Two has a smooth finish which required very little preparation. The drying time was perfect, even in the colder conditions”.For further information on Level IT Two and the other subfloor preparation materials available from UltraFloor, please visit ultra-floor.co.uk or contact their team of flooring experts by calling 01827 254402 or emailing ultrafloor@instarmac.co.uk.  Source: moraruk.co
Sponsored
UltraFloor forges ahead with industrial flooring project

UltraFloor forges ahead with industrial flooring project

Instarmac Group plc

Floor Painters Limited, have used UltraFloor to complete a 2,100 sqm industrial flooring project at a historic steel forge.Experienced industrial flooring experts, Floor Painters Limited, have used a number of UltraFloor materials to complete a 2,100 sqm industrial flooring project at a historic steel forge in Lincoln.BackgroundBuilt over 100 years ago, the existing floors in the steel forge were damaged and unsafe. After careful consideration, it became clear that replacing the original concrete floor was not a practical option in terms of time and cost.The ChallengeThe steel forge remained fully operational throughout the project and so the challenge was to find a range of flooring materials perfectly suited for industrial use and that could be trafficked quickly so as not to disrupt any work being carried out.The SolutionWith decades of expertise, Floor Painters Limited knew UltraFloor materials were key to a successful outcome.After removing the damaged concrete floor, the concrete substrate was sealed using UltraFloor Prime IT Multi-surface Primer. Formulated to promote adhesion to all UltraFloor smoothing underlayments, Prime IT Multi-surface Primer is pigmented pink for excellent coverage control and is proven to reduce pinholing, minimising the risk of costly failures. With a coverage rate of 200sqm at 3:1 dilution, Prime IT Multi-surface Primer is a must-have product for all flooring installation projects.The following day, Level IT Base was applied, via pump, at an average depth of 50mm. Level IT Base is a heavy duty, deep fill smoothing underlayment, formulated to build depths of up to 50mm thickness. Level IT Base also boasts a high compressive strength – an important requirement for all industrial flooring applications.Once Level IT Base had cured, Level IT Top was pump applied to an average depth of 10mm and left to cure. Ideal for use with Level IT Base, Level IT Top is a heavy duty, abrasive resistant surface finish, designed for use as a wear surface, and can receive forklift traffic after only 36 hours – the ideal product for warehouses and manufacturing facilities where downtime is not an option!Both Level IT Top and Level IT Base can be pump or trowel applied for ease of application, are moisture tolerant, have a 30-40 minute working time and can receive foot traffic after just 3 hours.To complete the installation, the cured floor was then prepared by industrial grinding before the application of two coats of a solvent free epoxy coating – resulting in a flat, hard-wearing, safe and fit for purpose floor.ResultsThe project was completed in six stages, over 36 days, carrying out between 300 and 500 sqm a day, depending on the work space made available. On completion of the project, Terry Rossington, Director of Floor Painters Limited, commented: “Our client was very happy with the standard of the finish and the upgrades made to their working environment, which has improved both visual appearance and functionality of the floor.”
Sponsored
UltraFloor gets an 'A' for effort at Derbyshire School

UltraFloor gets an 'A' for effort at Derbyshire School

Instarmac Group plc

Commercial flooring specialists, Shire Flooring, have used UltraFloor Prime IT Multi-surface Primer and Level IT Two to complete an extensive flooring project at Swanwick School and Sports College.BackgroundSwanwick School and Sports College have extended their outstanding premises to include a new educational block. To install the various floor coverings, experienced flooring specialists, Shire Flooring, used UltraFloor Prime IT Multi-surface Primer and Level IT Two.The ChallengeBefore any levelling could commence, the team at Shire Flooring identified that they would be working on a calcium sulphate screed – a notoriously difficult substrate to work with. With that in mind, UltraFloor’s Area Sales Manager, Mark Berry and Technical Training and Site Manager, Martin Pouncey, visited the site to carry out extensive moisture testing to ensure the moisture level was below 75% RH.The SolutionTo ensure an accurate moisture reading, the laitance was grinded off the surface of the screed. Once the correct moisture levels had been achieved, priming could commence.Formulated to promote adhesion to all UltraFloor smoothing underlayments, Prime IT Multi-surface Primer reduces pinholing, minimising the risk of costly failures. With a coverage rate of 150m² at 3:1 dilution and a second coat at 1:1, Prime IT multi-surface Primer is a must-have product for all flooring installation projects.After the screed had been primed and fully dried, Level IT Two was applied across the new building.There are many reasons why Level IT Two has become UltraFloor’s most popular floor leveller. Its exceptional flow characteristics make it a very easy material to apply to a variety of subfloors in both commercial and domestic flooring projects. Its low odour formulation means this fantastic all-rounder leveller is equally suited to confined areas, proving particularly popular in the education, health and hospitality sectors.With a set time of 2.5 hours, Level IT Two can receive bonded floor coverings after just 8 hours, making it an ideal choice for projects with a tight deadline. What’s more, because Level IT Two is available as a two component system, it takes the guesswork out of mixing, reducing site errors and guaranteeing a perfect application every time.After just a few hours, the various floor coverings were then installed across a number of classrooms, corridors and toilets.ResultsThe project completed on time and the pupils and staff at Swanwick School and Sports College are now able to enjoy their new facilities.
Sponsored
UltraFloor helps the medicine go down at North London Medical Centre

UltraFloor helps the medicine go down at North London Medical Centre

Instarmac Group plc

Long-standing UltraFloor customer, Specialist Screed (Flooring) Solutions Ltd have used UltraFloor’s expert subfloor preparation materials at a brand new medical centre in North London.BackgroundA new medical centre has recently been built to service the residents of North London. Before the centre could be opened to patients, the floors needed to be primed and levelled in preparation for the flooring installation.The ChallengeWith vulnerable patients using the facilities daily, it was imperative that the new medical centre was a safe, calming and hygienic environment for both visitors and staff. A variety of Polyflor vinyl and skirting were due to be installed across the centre and therefore subfloor preparation materials needed to be suitable to install each of them, without delay.The SolutionFollowing a bespoke specification written by UltraFloor’s technical team, Specialist Screed (Flooring) Solutions Ltd used UltraFloor Prime IT Multi-surface Primer and Level IT Two to install a range of Polyflor vinyl’s across the 800sqm medical centre.Formulated to promote adhesion to all UltraFloor smoothing underlayments, Prime IT Multi-surface Primer reduces pinholing, minimising the risk of costly failures. With a coverage rate of 200sqm at 3:1 dilution, Prime IT Multi-surface Primer is a must-have product for all flooring installation projects.After the screed had been primed and fully dried, Level IT Two was applied across the new building.There are many reasons why Level IT Two has become UltraFloor’s most popular floor leveller. Its exceptional flow characteristics make it a very easy material to apply to a variety of subfloors in both commercial and domestic flooring projects. Its low odour formulation means this fantastic all-rounder leveller is equally suited to confined areas, proving particularly popular in the education, health and hospitality sectors.With a set time of 2.5 hours, Level IT Two can receive bonded floor coverings after just 8 hours, making it an ideal choice for projects with a tight deadline. What’s more, because Level IT Two is available as a two component system, it takes the guesswork out of mixing, reducing site errors and guaranteeing a perfect application every time.After just a few hours, the various floor coverings were then installed across the medical centre.ResultsThe team at Specialist Screed (Flooring) Solutions Ltd began their work at Green Lane Medical Centre in the early part of 2022 and completed the 800sqm project by May 2022. On working with UltraFloor, Riley Goatham, Procurements and Project Co-ordinator at Specialist Screed (Flooring) Solutions Ltd commented: “The products were very good as usual with good technical back up from the UltraFloor team.”
Sponsored
UltraFloor is 'blooming marvellous' at popular garden centre

UltraFloor is 'blooming marvellous' at popular garden centre

Instarmac Group plc

Contract flooring specialists, C & C Flooring (Midlands) Ltd, have used UltraFloor’s expert subfloor preparation materials to install LVT flooring at Alver Valley Garden Centre in Portsmouth.BackgroundYour Local Garden Centre have recently opened a new store in Alver Valley, Hampshire. With a reputation of supporting local suppliers, fantastic products and delicious food, it was imperative that the brand new Alver Valley Garden Centre lived up to the high design expectations these centres are known for.The ChallengeThe power floated concrete substrate was installed in December with a view for the garden centre to open in April 2022 – an extremely short time frame for the 4,500sqm job. The project also took place during the winter months and therefore the cold temperatures also needed to be considered if the project was to be completed on time.The SolutionWith over 15 years experience in the flooring sector, C & C Flooring (Midlands) Ltd knew that UltraFloor’s expert subfloor preparation materials would be up to the challenge.After waiting 28 days for the new cement substrate to fully cure, the team at C & C Flooring (Midlands) Ltd diamond ground the floor to expose the aggregate. UltraFloor Area Sales Manager, Mark Berry, tested each area prior to applying DPM IT to ensure the moisture content was less than 98% RH.Once achieved, DPM IT was applied and allowed to cure for 12 hours. DPM IT is a two component, solvent free epoxy resin system for use as a surface damp proof membrane. Designed to provide protection against subfloor moisture, DPM IT has a pot life of 45 – 75 minutes, a cure time of 5 hours and boasts a 98% RH floor moisture tolerance.Once cured, UltraFloor Prime IT Multi-surface Primer was applied in preparation for the application of Level IT Smooth.Formulated to promote adhesion to all UltraFloor smoothing underlayments, Prime IT Multi-surface Primer reduces pinholing, minimising the risk of costly failures. With a coverage rate of 200m² at 3:1 dilution, Prime IT multi-surface Primer is a must-have product for all flooring installation projects.Pump or trowel applied from 2mm to 30mm, Level IT Smooth has an extremely smooth finish, essential for installing LVT, and boasts a superior flow – perfect for larger flooring projects.With a coverage rate of approximately 5.5sqm at 3mm, Level IT Smooth is suitable for underfloor heating systems, has a working time of 20-30 minutes and can receive foot traffic after just 2-3 hours – allowing you to move on to the next part of your project quickly.The superior performance of Level IT Smooth is just one reason why this much-loved smoothing underlayment is being used on a daily basis up and down the country.Once dry, Karndean LVT was then installed across the garden centre.ResultsDue to the enormity of the project, the flooring was completed in three sections, 1,500sqm at a time. The project began in January and was completed by the end of February 2022 in plenty of time for the opening of the fantastic new garden centre.“DPM IT performed as expected and dried in very good time and was easy to work with. Level IT Smooth flowed exceptionally well and was perfect for such a large job.” Andrew Williams, Director at C & C Flooring (Midlands) Ltd.
Sponsored
UltraFloor is fit as a fiddle at Kingston Hospital

UltraFloor is fit as a fiddle at Kingston Hospital

Instarmac Group plc

Long-standing UltraFloor customers, Specialist Flooring Group have used Level IT Two to install 800sqm of vinyl sheet flooring throughout Kingston Hospital.BackgroundIn August 2023, work began on a much-needed extension to Kingston Hospital in Surrey. The project included installing brand-new screeds, as well as working with the existing substrates in some areas.The ChallengeKingston Hospital is an extremely busy building, operating 24 hours a day. With that in mind, it was crucial that disruption was kept to a minimum and patients were kept as comfortable as possible during the renovations.Healthcare environments are in constant use and so choosing subfloor preparation materials that would provide a super smooth and hard-wearing finish was equally as important. With hospital staff moving beds, wheelchairs and equipment along the corridors, it was crucial that the floors were completely level and devoid of any lumps, bumps and trip hazards.The SolutionUltraFloor have a long and successful history of providing subfloor preparation products to the healthcare sector. They were delighted to once again partner with flooring experts, Specialist Flooring Group, to complete a 800sqm project at this very busy Surrey hospital.To begin, the screeding division of Specialist Flooring Group installed a 75mm K Screed to the new areas of the hospital. Once complete, they handed over to the flooring arm of the business who primed the entire area with UltraFloor Prime IT Multi-surface Primer.Formulated to promote the adhesion to all UltraFloor smoothing underlayments, Prime IT Multi-surface Primer reduces pinholing, minimising the risk of costly failures. With a coverage rate of 200sqm at 3:1 dilution, Prime IT Multi-surface Primer is a must-have product for all flooring installation projects.After Prime IT Multi-surface Primer had cured, Level IT Two was trowel applied to a depth of 3-5mm.There are many reasons why Level IT Two has become UltraFloor’s most popular floor leveller. Its exceptional flow characteristics make it a very easy material to apply to a variety of subfloors in both commercial and domestic flooring projects.Level IT Two is protein free, reducing the risk and spread of disease as the types of dangerous and contagious bacteria that thrive in protein are eliminated, and is low odour, providing a pleasant environment for both staff, contractors and recovering patients.With a set time of 2.5 hours, Level IT Two can receive bonded floor coverings after just 8 hours, making it an ideal choice for projects with a tight deadline. What’s more, because Level IT Two is available as a two component system, it takes the guesswork out of mixing, reducing site errors and guaranteeing a perfect application every time.Level IT Two created a beautifully smooth subfloor – the perfect preparation for the installation of the Polyflor Verona, Polyflor Palletone and Burmatex Osaka carpet tiles.ResultsOn working with UltraFloor, Riley Goatham, Project Coordinator at Specialist Flooring Group Ltd, commented: “We have a great continuing relationship with Instarmac. We use UltraFloor materials as they are of a great standard, and we receive amazing technical support from the UltraFloor team. This ranges from site visits to having specifications provided to us for certain projects.As always, the materials were great for this project. Level IT Two allowed us to use one levelling compound throughout, regardless of the substrate type, and provided us with a nice level floor to work with.”The project began in August 2023 and finished in October 2023.For further information about UltraFloor and how you can benefit from their expertise, please contact their team of flooring experts by emailing ultrafloor@instarmac.co.uk or calling 01827 254400.
Sponsored
UltraFloor is just what the doctor ordered at Warrington Emergency Department

UltraFloor is just what the doctor ordered at Warrington Emergency Department

Instarmac Group plc

CRT Flooring Specialists Ltd have used UltraFloor’s latest product innovation, Level IT Hydra Bond, to install 800sqm of vinyl flooring at Warrington’s £4.3 million Emergency Department extension.BackgroundLeading infrastructure and building specialists, Tilbury Douglas, have been appointed by Warrington and Halton Teaching Hospitals NHS Trust to complete the £4.3 million Warrington Emergency Department extension.The much-needed investment will increase capacity, improve patient care and modernise facilities.The ChallengeHigh performance products that would work quickly and withstand the constant and heavy trafficking of hospital staff, patients and medical equipment were critical to the success of this project.The SolutionFollowing a bespoke site specification completed by UltraFloor’s Technical Training and Site Support Manager, Martin Pouncey, CFA members and expert flooring contractors, CRT Flooring Specialists Ltd, used DPM IT, Prime IT Multi-surface Primer and Level IT Hydra Bond to complete the 800sqm installation.DPM IT is a two component, solvent free epoxy resin system for use as a surface damp proof membrane. Designed to provide protection against subfloor moisture, DPM IT has a pot life of 45 – 75 minutes, a cure time of 5 hours and boasts a 98% RH floor moisture tolerance.Formulated to promote adhesion to all UltraFloor smoothing underlayments, Prime IT Multi-surface Primer reduces pinholing, minimising the risk of costly failures. With a coverage rate of 200m² at 3:1 dilution, Prime IT multi-surface Primer is a must-have product for all flooring installation projects.Once fully dried, UltraFloor Level IT Hydra Bond was applied across the 800sqm area. Level IT Hydra Bond is a ground-breaking, water based floor leveller that can be applied to bitumen and adhesive residues without the need to prime.Level IT Hydra Bond is a super polymer modified smoothing compound which utilises UltraFloor’s unique technology – a process which enhances application and boasts unrivalled flow properties. What’s more, each bag of Level IT Hydra Bond also contains 20% recycled material.In addition, Level IT Hydra Bond can receive bonded floor coverings after 4 hours, has an extended working time of 45 minutes for optimal usability, and is moisture tolerant and protein free.ResultsOn the performance of UltraFloor Level IT Hydra Bond, Richard Martin, Office Manager at CRT Flooring Specialists Ltd, commented: “It’s fantastic. Flows really well.”The vinyl flooring installation was completed on time and the remaining extension work is continuing as scheduled.
Sponsored
UltraFloor is ‘blooming marvellous’ at popular garden centre

UltraFloor is ‘blooming marvellous’ at popular garden centre

Instarmac Group plc

Your Local Garden Centre have recently opened a new store in Alver Valley, Hampshire. With a reputation of supporting local suppliers, fantastic products and delicious food, it was imperative that the brand new Alver Valley Garden Centre lived up to the high design expectations these centres are known for.
Sponsored
UltraFloor makes country park renovation a walk in the park

UltraFloor makes country park renovation a walk in the park

Instarmac Group plc

Flooring specialists Laceys Floors and Walls have used UltraFloor Level IT Hydra Bond to install 170sqm of flooring at Rushcliffe Country Park.BackgroundGreen Flag award winners since 2007, Rushcliffe Country Park is a popular visitor attraction in Nottinghamshire. Work is currently underway to renovate the visitor centre including staff office and toilets.The ChallengeExpert flooring specialists, Laceys Floors and Walls were the contractors commissioned to install 170sqm of flooring throughout the visitor centre. To complete the installation, Laceys Floors and Walls needed subfloor materials that would provide a super smooth finish to avoid any trip hazards and would withstand constant trafficking of visitors.The SolutionTo begin, Laceys Floors and Walls applied DPM IT damp proof membrane across the entire 170sqm area. DPM IT is a two component, solvent free epoxy resin system for use as a surface damp proof membrane. Designed to provide protection against subfloor moisture, DPM IT has a pot life of 45 – 75 minutes, a cure time of 5 hours and boasts a 98% RH floor moisture tolerance.Once fully cured, the team applied UltraFloor’s latest product innovation, Level IT Hydra Bond to a depth of 3-5mm.Level IT Hydra Bond is a super polymer modified smoothing compound which utilises UltraFloor’s unique technology – a process which enhances application and boasts unrivalled flow properties. What’s more, each bag of Level IT Hydra Bond also contains 20% recycled material.In addition, Level IT Hydra Bond can receive bonded floor coverings after 4 hours, has an extended working time of 45 minutes for optimal usability, and is moisture tolerant and protein free.To complete the project, Polysafe Wood FX and Verona flooring was installed throughout the visitor centre, office and toilets.ResultsThe flooring was installed with ease and Rushcliffe County Park’s exciting new visitor centre is due to open later this year.“Level IT Hydra Bond was a real pleasure to work with. It was easy to trowel and float on the floor and knitted together great between mixes. It even went nicely on the previous days screeding.” Richard Lacey, Director at Laceys Floors and Walls.
Sponsored
UltraFloor makes fast work of 44 Radisson Red Hotel Bathrooms

UltraFloor makes fast work of 44 Radisson Red Hotel Bathrooms

Instarmac Group plc

Flooring contractors, 14 Flooring, have used Level IT Super Flex 30 to create 44 luxurious bathrooms at the Radisson Red Hotel in London Heathrow – much to their guests delight.BackgroundLocated at one of the world’s busiest airports, Radisson Red Hotel provides the perfect location for holidaymakers to get a good night’s sleep ahead of their flight or to chill out after a long day of travelling.Forty-four bathrooms, across four floors, have undergone a makeover to provide guests with an even more magnificent stay.The ChallengeTime was of the essence at this location. With guests already booked in, it was imperative that the flooring was completed on time to allow other trades to finish their works in readiness for the agreed handover date.The SolutionCommercial flooring specialists, 14 Flooring, partnered with subfloor preparation experts, UltraFloor, to install 3sqm of flooring, in 44 bathrooms, across 4 floors at the hotel.In preparation of the Tarkett LVT large format tiles being installed, 14 Flooring primed the substrate using UltraFloor Prime IT Multi-surface Primer.Formulated to promote the adhesion to all UltraFloor smoothing underlayments, Prime IT Multi-surface Primer reduces pinholing, minimising the risk of costly failures. With a coverage rate of 200sqm at 3:1 dilution, Prime IT Multi-surface Primer is a must-have product for all flooring installation projects.Once cured, Level IT Super Flex 30 was applied across the entire area, resulting in the smoothest of subfloors.Specifically designed for use over a wide variety of subfloors including steel mezzanine decks and flooring grade plywood, Level IT Super Flex 30 is a rapid setting and drying, fibre reinforced flexible smoothing finishing compound.Developed with a high polymer content, Level IT Super Flex 30 boasts superior flexible properties, making it the perfect smoothing underlayment for floors where movement is likely.What’s more, subfloors prepared using Level IT Super Flex 30 are available to receive foot traffic in as little as 30 minutes, bonded floor coverings after 1 hour and resin finishes and forklift traffic after just 24 hours, allowing you to move on to another project quickly.ResultsThe expertise and skills of 14 Flooring teamed with the fantastic performance of UltraFloor, meant that it took the team just six days to prime, latex and install flooring across the hotel bathrooms.On selecting UltraFloor for the project, Daniel Lunan, Director of 14 Flooring, commented: “I chose Level IT Super Flex 30 for its rapid setting and rapid drying properties. With many bathrooms to complete in a short time frame, the smoothing compound drying quickly, without airflow, enabled us to work and install flooring the same day, which was essential. Having used Level IT Super Flex 30 many times in the past, I knew I could rely on it to perform exactly how I needed it too.”For further information on Level IT Super Flex 30 and the other materials available from UltraFloor, please contact UltraFloor’s team of flooring experts by emailing ultrafloor@instarmac.co.uk or calling +44 (0) 1827 254402.
Sponsored
UltraFloor makes for smooth LVT installation

UltraFloor makes for smooth LVT installation

Instarmac Group plc

Highly skilled flooring contractors, Ransome Flooring Limited, have used Level IT Smooth floor leveller to install LVT flooring at a ground floor apartment in Bristol.BackgroundWith over 20 years’ experience and a reputation built on perfection, reliability and recommendation, Ransome Flooring Limited’s extensive nationwide flooring portfolio put them in perfect place to install 68sqm of LVT flooring at a ground floor apartment in Bristol.The ChallengeDue to the design of the apartment, a seamless transition between the various living areas was crucial. The products used also needed to provide a first time, rapid and silky smooth finish to minimise disruption and prevent any dangerous trip hazards for the homeowner.The SolutionAfter securing the project, Ransome Flooring Limited sought professional advice from UltraFloor’s team of product experts. After visiting site, and carrying out moisture testing, UltraFloor recommended the use of Prime IT Multi-surface Primer and Level IT Smooth – expert subfloor preparation materials that would meet the clients’ requirements perfectly.Formulated to promote adhesion to all UltraFloor smoothing underlayments, Prime IT Multi-surface Primer reduces pinholing, minimising the risk of costly failures. With a coverage rate of 200m² at 3:1 dilution, Prime IT multi-surface Primer is a must-have product for all flooring installation projects.Prime IT Multi-surface Primer was applied to the substrate, and once both coats of primer had fully dried, Level IT Smooth was applied.Pump or trowel applied from 2mm to 30mm, Level IT Smooth has an extremely smooth finish, essential for installing LVT, and boasts a superior flow – perfect for larger flooring projects.With a coverage rate of approximately 5.5sqm at 3mm, Level IT Smooth is suitable for underfloor heating systems, has a working time of 20-30 minutes and can receive foot traffic after just 2-3 hours – allowing you to move on to the next part of your project quickly.The superior performance of Level IT Smooth is just one reason why this much-loved smoothing underlayment is being used on a daily basis up and down the country.The ResultsThanks to the expertise of Ransome Flooring Limited and UltraFloor’s superb subfloor preparation materials, the homeowner was soon able to enjoy their luxurious new flooring.
Sponsored
UltraFloor makes homeowners dream come true

UltraFloor makes homeowners dream come true

Instarmac Group plc

Professional flooring contractors, Elvet Flooring Solutions, have made a homeowner’s dream come true after installing 40sqm of luxury vinyl flooring at their property using UltraFloor’s expert subfloor preparation materials.BackgroundAs part of their extensive home renovations, a homeowner in Durham dreamed of installing beautiful Tarkett Mini Plank flooring throughout their hallway and kitchen – the perfect finishing touch to their modern and luxurious home.The ChallengeThe 40sqm area is the main thoroughfare from front door to garden and so the floor needed to be smooth and bump-free to keep the family, and dog, safe. It was also important that the flooring was installed speedily so as not to delay the rest of the renovations.The SolutionUltraFloor have a reputation for providing the flooring market with quality and innovative subfloor preparation materials. For this project Elvet Flooring Solutions first secured 5.5mm FG1 plywood across the entire area and then primed the surface using Prime IT Multi-surface Primer.Formulated to promote the adhesion to all UltraFloor smoothing underlayments, Prime IT Multi-surface Primer reduces pinholing, minimising the risk of costly failures. With a coverage rate of 200sqm at 3:1 dilution, Prime IT Multi-surface Primer is a must-have product for all flooring installation projects.Once cured, Level IT Renovate was applied at a 5mm depth and left for 3 days before the LVT flooring was installed in a herringbone design.Developed for the renovation of existing floors, Level IT Renovate is fibre reinforced for added strength and to minimise the risk of hairline cracks – reducing a common cause of failure.Suitable for deep applications from 3-40mm, Level IT Renovate is multi-purpose for extensive use and boasts excellent flow properties, making this flexible and versatile floor leveller ideal for a wide range of flooring substrates.What’s more, Level IT Renovate can also be used externally, as a light wearing surface, can be walked on in as little as 2 – 2.5 hours and can receive floor coverings in just 4 hours.ResultsThe flooring took just 4 days to install from start to finish and the homeowner is now enjoying their beautiful new kitchen living area.On the performance of Level IT Renovate, Matt Williams owner of Elvet Flooring Solutions, commented: “The flow rate was very impressive and easy to work with. Perfect smooth finish ready for the LVT.”
Sponsored
UltraFloor passes with flying colours at Dunstable Academy

UltraFloor passes with flying colours at Dunstable Academy

Instarmac Group plc

Experienced flooring contractors, Variety Carpets, have used a number of UltraFloor’s subfloor preparation materials to install 200sqm of flooring at Priory Academy in Dunstable.BackgroundPriory Academy has served the local Dunstable community for over 100 years and educates 800 pupils every year. In summer 2022 work began to upgrade the flooring in their school kitchen and store rooms.The ChallengeVariety Carpets had a short window to complete the installation and with the Academy only closed for six weeks during the summer holiday, time really was of the essence.The SolutionAfter scarifying the bitumen and vacuuming the area to remove any contaminants, Variety Carpets primed the subfloor with a neat coat of UltraFloor Prime IT Multi-surface Primer.Formulated to promote adhesion to all UltraFloor smoothing underlayments, Prime IT Multi-surface Primer reduces pinholing, minimising the risk of costly failures. With a coverage rate of 200m² at 3:1 dilution, Prime IT multi-surface Primer is a must-have product for all flooring installation projects.The next day, and once Prime IT Multi-surface Primer had fully dried, Level IT Hydra Bond was applied across the 200sqm area at a 3mm depth. Level IT Hydra Bond is a ground-breaking, water based floor leveller that can be applied to bitumen and adhesive residues without the need to prime.Level IT Hydra Bond is a super polymer modified smoothing compound which utilises UltraFloor’s unique technology – a process which enhances application and boasts unrivalled flow properties. What’s more, each bag of Level IT Hydra Bond also contains 20% recycled material.In addition, Level IT Hydra Bond can receive bonded floor coverings after 4 hours, has an extended working time of 45 minutes for optimal usability, and is moisture tolerant and protein free.To complete the installation, Altro Walkway 20, hard wearing vinyl flooring was installed the very next day and finished for a customer inspection on day five.ResultsThanks to the expertise of Variety Carpets, the five day flooring installation was completed on time and without issue. On using UltraFloor, Mark Blanchard, Director at Variety Carpets, commented: “We enjoyed using UltraFloor materials. The wet edge time is ideal for larger areas and warmer weather. The project completed at the end of August 2022 in hot temperatures, so it was really ideal. The set time of 4 hours means when we finished late afternoon, it was suitable to lay on the next day.”
Sponsored
UltraFloor set up home at prestigious housing development

UltraFloor set up home at prestigious housing development

Instarmac Group plc

UltraFloor’s expert subfloor preparation materials have been used to install LVT flooring at one of Bellway Homes new property developments in Hurworth-on-Tees.BackgroundBellway Homes, experts in creating dream homes, have built a prestigious development of new houses in Hurworth-on-Tees. Surrounded by beautiful open countryside, the new housing development is made up of 3, 4 and 5 bedroom homes, one of which required LVT to be installed throughout the property.The ChallengeWith homeowners ready to move in to their new home, time was of the essence for this project. The installation took place on a very cold day and therefore it was essential that the performance of the chosen subfloor preparation materials would be unaffected by the drop in temperature.The SolutionFlooring Development, a business with over 25 years experience in the flooring trade used UltraFloor Prime IT Multi-surface Primer and Level IT Renovate to install LVT across one of the 5 bedroom properties.Formulated to promote adhesion to all UltraFloor smoothing underlayments, Prime IT Multi-surface Primer reduces pinholing, minimising the risk of costly failures. With a coverage rate of 200m² at 3:1 dilution, Prime IT multi-surface Primer is a must-have product for all flooring installation projects.Once Prime IT Multi-surface Primer had fully dried, Level IT Renovate was applied to a 5mm depth.Developed for the renovation of existing floors, Level IT Renovate is fibre reinforced for added strength and to minimise the risk of hairline cracks – reducing a common cause of failure.Suitable for deep applications from 3-40mm, Level IT Renovate is multi-purpose for extensive use and boasts excellent flow properties, making this flexible and versatile floor leveller ideal for a wide range of flooring substrates.What’s more, Level IT Renovate has a working time of 20-30 minutes, can be walked on in as little as 2-2.5 hours and can receive floor coverings in just 4 hours.ResultsThe project took just three days to complete and was finished on time much to the homeowners delight. “The customer was very happy”, Lee Bates, Director at Flooring Development.
Sponsored
UltraScape creates RHS Award-winning gardens

UltraScape creates RHS Award-winning gardens

Instarmac Group plc

The RHS Chelsea Flower Show is the greatest horticultural event. It is known all around the world for its fabulous floral displays, thought provoking and beautifully landscaped show gardens and for nurturing gardening trends and talent.Held in the most beautiful grounds of the Royal Hospital Chelsea, the RHS Chelsea Flower Show is guaranteed to inspire and wow everyone who visits.One such garden is the RBC Brewin Dolphin Garden designed by one of House & Gardens Top 50 Garden Designers of 2023, Paul Hervey-Brookes. This stunning Silver-Gilt show garden ‘draws creative inspiration from the way knowledge is passed down from generation to generation and interpreted for the modern world.’To assist with the longevity and sustainable features of this garden, landscaping expert and garden consultant, G K Wilson Landscapes, opted to use UltraScape eco-bed environmentally friendly bedding mortar and slipbond brick slip adhesive to install the beautiful Lunar Sand pavers and Dover Taupe porcelain wall tiles. For the finishing flourish, the paving was grouted using UltraTile ProGrout Flexible in Bahama Beige and Grey.In a Chelsea Flower Show first, garden designer and RHS ambassador for inclusivity and diversity, Manoj Malde married his partner in his own magnificently designed RHS and Eastern Eye Garden of Unity feature garden. This powerful and vibrant garden is inspired by Manoj’s Indian heritage and has inclusivity and sustainability at its heart. Alongside peat-free planting, the garden also embraced the use of reclaimed materials to create the limestone path and used UltraScape eco-bed environmentally friendly bedding mortar to install the limestone paving.Two further award-winning gardens to benefit from Instarmac’s expertise are Darren Hawkes’ Silver-Gilt Samaritan’s Listening Garden and Emma Tipping’s Gold Medal St George ‘Alight Gere’ Balcony Garden.UltraScape were honoured to have supported, and sponsored, each of these beautiful gardens.UltraScape has been manufacturing and providing the industry with high quality, specialist paving installation materials for over 25 years. Their proven and trusted range includes BS 7533 complaint bedding mortars, primers, jointing solutions and brick slip adhesive. UltraScape’s premium products are specified by contractors, architects, consultants and engineers for an ever-expanding portfolio of major schemes across the UK.Choose UltraScape’s proven and certified BS 7533 Mortar Paving System for the performance and assurance that comes with a UKAS seal of approval – you can’t afford not to!To find out more about UltraScape’s range of paving installation materials, please email ultrascape@instarmac.co.uk, visit ultrascape.co.uk or call their team of experts by ringing +44 (0) 1827 254402.
Sponsored
UltraScape Features in Multi-million pound retail development.

UltraScape Features in Multi-million pound retail development.

Instarmac Group plc

UltraScape’s BS 7533 compliant mortar paving system has been used to install over 10,000 square meters of paving in Newport’s major new shopping and leisure scheme, Friars Walk.
Sponsored
UltraScape flowpoint used at beautiful and historic Citadelle of Namur

UltraScape flowpoint used at beautiful and historic Citadelle of Namur

Instarmac Group plc

BackgroundLocated on a hill overlooking the union of the Sambre and Meuse rivers, the Citadelle of Namur has witnessed ‘millions of years of geological history and two thousand years of human history’.In 2021, cable cars were added to the extensive list of attractions at the Citadelle, giving visitors beautiful panoramic views of Namur.The ChallengeThe Citadelle is an extremely popular tourist attraction and therefore an extensive downtime was not possible. To coincide with their exciting new addition, paving was installed at the entrance to the cable cars and surrounding the exhibition centre. It was critical that the paving was installed with durable materials that would withstand heavy foot traffic, and would also provide a stunning finish suitable for the historic environment.The SolutionWith over 25 years’ experience providing the world with BS 7533 compliant paving installation materials, UltraScape was an obvious choice to use at this exciting location.Supplied by Instarmac International’s Belgian partner, Nijst Natuursteen, UltraScape flowpoint rapid set flowable grout was used to joint 800sqm of paving at the Citadelle.UltraScape flowpoint smooth is a flowable grout which allows for large areas of paving to be grouted quickly. Suitable for joints from 3mm to 50mm and as deep as 200mm, flowpoint smooth has been developed over a number of years to provide a durable finish which will not crack or stain – even in the hottest and coldest of temperatures.With an initial set after just 15 minutes, and a walk on time of one hour, it is unsurprising that flowpoint smooth has become synonymous with fast application, cost-effective and robust jointing.UltraScape flowpoint is available in four varieties – original, eco, smooth and fine – and two colours – Natural Grey and Charcoal. UltraScape have jointing solutions for all designs and tastes.ResultsThe work was completed in 2021 and visitors to the stunning and historic Citadelle are now enjoying a beautifully paved area whilst in line for the cable cars.
Sponsored
Ultrascape Helps to Deliver World Class Transport Hub

Ultrascape Helps to Deliver World Class Transport Hub

Instarmac Group plc

Ultrascape's BS 7533 compliant mortar paving system has played a major role in helping to transform one of the UK's busiest train stations. The long awaited redevelopment of Birmingham New Street station has transformed what was previously a dark, overcrowded site into a prestigious gateway to the UK's second city. Work was carried out by MPB Structures Ltd. It included reinstating existing station platforms, installing new structures, hardscaping around the station perimeter and the creation of Birmingham's version of the 'Spanish Steps.' The paving was installed using Ultrascape's BS 7533 compliant mortar paving system.
Sponsored
UltraScape helps to preserve historic thoroughfare

UltraScape helps to preserve historic thoroughfare

Instarmac Group plc

UltraScape’s BS 7533 mortar paving system was used to rejuvenate a busy high street in Wakefield as part of plans to regenerate the area. Albion Court is an historic, well used thoroughfare which had deteriorated considerably and posed a health and safety risk to pedestrians. Wakefield Council, in line with English Heritage conservation principals, uplifted and re-laid the 80 year old cobbles to help preserve the historic surface using UltraScape’s system. ‘UltraScape’s products produced outstanding results and were easy to work with and will certainly be used on other schemes in the future.’ Wakefield Council.
Sponsored
UltraScape is a hard act to follow at iconic Australian theatre

UltraScape is a hard act to follow at iconic Australian theatre

Instarmac Group plc

In May 2018, Australia’s visionary theatre, La Mama, was destroyed by fire. Thanks to the generosity and hard work of The La Mama Community, this iconic theatre has now reopened to the public and UltraScape are delighted to have played a part in its restoration.BackgroundLocated in Victoria, Australia, La Mama Theatre is home to responsive, inclusive and diverse independent theatre making. With a reputation steeped in visionary arts, La Mama Theatre is the number one destination for audiences to discover the next generation of theatre artists.The ChallengeA fire devastatingly destroyed this much-loved theatre in May 2018. The damage was so extensive, La Mama theatre needed to be completely rebuilt. Part of the restoration included an additional structure to the front of the theatre and new paved area.The SolutionThe incredible La Mama community raised over $3,400,000 to help restore the theatre back to its former glory. To grout the Recycled Brick Paving at the theatre, Instarmac International’s Australian partners, and specialist paving distributors, Prolific Stone International, supplied UltraScape flowpoint smooth.Greysea Group, the contractors completing the paving installation, have been using flowpoint since it was first introduced into Australia in 2020.UltraScape flowpoint smooth is a flowable grout which allows for large areas of paving to be grouted quickly. Suitable for joints from 3mm to 50mm and as deep as 200mm, flowpoint smooth has been developed over a number of years to provide a durable finish which will not crack or stain – even in the hot Australian temperatures.With an initial set after just 15 minutes, and a walk on time of one hour, it is unsurprising that flowpoint smooth has become synonymous with fast application, cost-effective and robust jointing.UltraScape flowpoint is available in four varieties – original, eco, smooth and fine – and two colours – Natural Grey and Charcoal. UltraScape have jointing solutions for all designs and tastes.ResultsLa Mama Theatre opened to the public in December 2021 with great applause. The newly refurbished theatre is fully accessible, has a dedicated rehearsal space, new bar, green room and mezzanine floor for their next generation of theatre artists to perform on.
Sponsored
UltraScape paves the 'Greenest City' in Europe

UltraScape paves the 'Greenest City' in Europe

Instarmac Group plc

Instarmac International’s Swedish partner, Pekuma, have supplied world renowned UltraScape flowpoint to joint 300sqm of paving at Växjö’s newly refurbished bus station and city hall.BackgroundIn the station area, along Norra Järnvägsgatan, is Växjö’s brand new station and municipal building. The old town hall now boasts a better working environment for its 600 employees and a 1,850sqm station which includes waiting area, shops and restaurants.Växjö’s beautiful new town hall has been designed to the highest environmental standards and is fondly known as the ‘greenest city in Europe’.The ChallengeAs part of this exciting project, 300sqm of cobblestones and concrete slabs were installed directly outside the entrance to City Hall to create walkways for pedestrians and stop/start sections for buses.It was imperative that the jointing material used to grout the 100 x 100mm cobblestones and 210 x 210mm concrete slabs would not only fit in with the aesthetic of the newly refurbished building, but would also provide a durable finish that could withstand the constant trafficking from pedestrians and vehicles.The SolutionInstarmac International’s Swedish partner Pekuma, supplied UltraScape flowpoint to Skanska, the contractors working on this project.UltraScape flowpoint smooth is a flowable grout which allows for large areas of paving to be grouted quickly. Suitable for joints from 3mm to 50mm and as deep as 200mm, flowpoint smooth has been developed over a number of years to provide a durable finish which will not crack or stain.With an initial set after just 15 minutes, and a walk on time of one hour, it is unsurprising that flowpoint smooth has become synonymous with fast application, cost-effective and robust jointing.UltraScape flowpoint is available in four varieties – original, eco, smooth and fine – and two colours – Natural Grey and Charcoal. UltraScape have jointing solutions for all designs and tastes.ResultsThe project was completed on time with residents, visitors and employees of City Hall now enjoying the beautiful new station and town hall.
Sponsored
UltraTile creates tropical paradise at Center Parcs

UltraTile creates tropical paradise at Center Parcs

Instarmac Group plc

The Great Northern Tiling Company have used UltraTile to create a subtropical swimming paradise at iconic family resort, Center Parcs.BackgroundLocated in the heart of Nottingham’s famous Sherwood Forest, Center Parcs is a much-loved family resort home to variety of activities and villages, including the recently renovated Subtropical Swimming Paradise Village.The ChallengeThe project began mid-2020 during the UK’s first lockdown. To make the most of the facilities being empty, the project continued to grow in size as the team at Center Parcs rejuvenated further areas across the family resort.“Working in constant 30°C+ temperatures during summer 2020 was challenging for both our tilers and the adhesive. Fitting Quartzite stone to the seating areas, Jacuzzi and stairs was technically demanding”. Darren Nockall, Director at The Great Northern Tiling Company.
Sponsored
UltraTile helps bring much-loved community pub back to life

UltraTile helps bring much-loved community pub back to life

Instarmac Group plc

UltraTile are delighted to have played a part in the restoration of The White Swan – a pub based at the heart of Gressenhall Green, Norfolk.BackgroundThere has been a pub at the heart of Gressenhall Green for over 250 years but when the doors sadly had to close in 2018, and with the threat of the land being redeveloped for housing, the local community took it upon themselves to raise the necessary funds to transform their much-loved pub and reopen its doors once again.The ChallengeThe ‘Save our Swan’ community project has ambitious plans for the pub. Builders and volunteers have been hard at work stripping out the old fixtures, redesigning the interior space to provide more room and better facilities, and renovating the Cartshed to install a wood-fired pizza oven and dining area.The Gressenhall Community Enterprise have done a tremendous job in raising the funds needed to restore and revitalise The White Swan. For the project to be a success, and to ensure funds and volunteers’ time are used most effectively, it was crucial that the materials used throughout the restoration were reputable, trusted and guaranteed to perform.Dereham Tiles & Carpets, flooring specialists with over 20 years of knowledge and expertise, recommended the use of UltraTile for all tiling installations.The SolutionUltraTile was delighted to be part of such an important community project and was more than happy to donate 50% of the adhesives and grouts needed, free of charge.UltraTile ProLevel One was used to prepare the subfloor in the main pub and Cartshed, ready for installing the Jaipur Heritage antiquated limestone tiles with ProRapid RS tile adhesive and ProGrout Flexible grout.Formulated for depths up to 60mm in one application, ProLevel One deep fill floor leveller incorporates a blend of specially graded fillers, cements and polymers to offer a rapid curing profile for early fixing of tiles, even at thicker depth applications.ProRapid RS is a flexible rapid set tile adhesive specially formulated with enhanced adhesion and flexibility. These properties make ProRapid RS an ideal choice for use in wet areas, with underfloor heating systems and for installing porcelain, mosaic and natural stone tiles.Available in 12 colours to complement popular tile choices, ProGrout Flexible has been formulated using ColourShield Technology for a vibrant and long-lasting finish with all tile types. Polymers have been added to the formulation of ProGrout Flexible to increase flexibility and to provide a virtually impermeable set.Results“Brilliant, quality product that complements our limestone floor and adds to the character of our community pub”. Rosie Begg, Secretary at Gressenhall Community Enterprise.There is still work to be done at The White Swan but with the hard work and dedication of the local community, the doors to this much-loved pub will reopen for business around Easter 2022.

Showing 1-36 of 38