NBS Source
I'm a manufacturer

This literature item is no longer available.

Waterproofing Liverpool One Case Study

Case study

Waterproofing Liverpool One Case Study

by Sika Limited

For a maze of basements requiring refurbishment as part of one of the country’s largest regeneration schemes, architects required a waterproofing system that was both versatile and proven. Sika® 1 from global building product manufacture Sika offered the right credentials. Liverpool ONE, a £1 billion regeneration programme, comprises 42 acres of open-air shopping and leisure facilities and involves the careful restoration of several historic buildings. These include the Russell Building, Compton House, the Stanley Building and County Palatine, which were built between the 1860s-80s.

No related products in this Case study

Contact Sika Limited by clicking the button below to find out which products were used in this Case study.

More literature from Sika Limited

View all literature (207)
Sikafloor 14 Pronto

Sikafloor 14 Pronto

Sika Joint Sealing Solutions in Stadia

Sika Joint Sealing Solutions in Stadia

Sikafloor 13 Pronto

Sikafloor 13 Pronto

Sikafloor 10 Pronto

Sikafloor 10 Pronto