Design guide
A common approach for the delivery of risers has been in modular, 3-storey units; a quick fix to fill a perilous void within a building during construction. Although a commonly discussed method, 3-storey modular units arent without their problems. They re-introduce work at height and do not prevent the spread of smoke and flame in the event of fire as required by statutory regulations; these are just a few of the hidden risks of 3-storey modular risers. But what other misconceptions lurk in the background, and how important is it to consider the whole project, rather than just M&E installation when designing a riser modular system?
Contact Ambar Kelly Ltd by clicking the button below to find out which products were used in this Design guide.
SCCS CE Certificate of FPC 19.08.20 to 28.02.22
SCCS CE Welding Certificate 19.08.20 to 28.08.22
AMBAR KELLY TECHNICAL DATA SHEET
Technical briefing note - Riser Statutory Regulations