PROMATECT-250 - Protection to Steel Joisted Mezzanine - 120 mins fire protection

Technical data sheet

PROMATECT-250 - Protection to Steel Joisted Mezzanine - 120 mins fire protection

by Promat UK

The supporting steel framework of the mezzanine floor (including the columns) should be fire protected for a period equal to, or greater than that required for the mezzanine floor itself. This may normally be achieved using 2 x layers of PROMATECT 250

Preview

No featured products in this Technical data sheet

Contact Promat UK by clicking the button below to find out which products were used in this Technical data sheet.

More literature from Promat UK

View all literature (30)