Orchard Close, Wales

Case study

Orchard Close, Wales

by H+H UK Ltd

Contractor Robert Bishop from RT Bishop, required a swift construction solution as a replacement for timber frame that his team could successfully use to deliver the project on time. H+Hs Rå Build method, using the Thin-Joint System and a combination of H+H Jumbo Bloks and Celcon Foundation Blocks provided the perfect solution.

Preview

No featured products in this Case study

Contact H+H UK Ltd by clicking the button below to find out which products were used in this Case study.

More literature from H+H UK Ltd

View all literature (33)