Linden Homes Ra Build

Case study

Linden Homes Ra Build

by H+H UK Ltd

The 266 houses in this second phase were constructed using the Ra Build method of aircrete construction with H+H blockwork and Celfix thin joint mortar. This is the 2000th Ra Build job for H+H.

No featured products in this Case study

Contact H+H UK Ltd by clicking the button below to find out which products were used in this Case study.

More literature from H+H UK Ltd

View all literature (33)