Case study
This literature item is no longer available.
Case study
The architectural intent of this project required BEMO's technical and manufacturing expertise. Extreme tapered standing seam panels were produced on site, in one continuous length, to avoid the need for unsightly welded end laps.
Contact BEMO Project Engineering UK Ltd by clicking the button below to find out which products were used in this Case study.
BEMO Facade Brochure
BEMO-BOND-INVISIO Facade System
BEMO-PRIMO Clip on Facade
BEMO Roof Brochure