Case study
Case study
East London Transit is a new rapid transport scheme that has been developed by Transport for London to meet the existing, and anticipated, demand for public transport in North East London caused by the Thames Gateway redevelopment and the 2012 Olympics. It is essential on such busy urban routes that ease of access for all users should be optimised. The Brett Kassel Kerb profle ensures optimal vehicle positioning to minimise the gap between kerb and vehicle platform and offers maximum passenger safety and rapid embarkation.
Contact Brett Landscaping by clicking the button below to find out which products were used in this Case study.
Safe Handling Advice For kerbs And Flag Paving
Specialist Kerbs & Permeable Paving
Corporate Brochure
Aura CBP TDS Sept 21