NBS Source
I'm a manufacturer

Compare variants

Up To 46% Lower Embodied Carbon - IKO Permascreed LI - Quick Drying Mastic Asphalt Screed Solution for Flat Roofs & Walkways - Roof screed
Up To 46% Lower Embodied Carbon - IKO Permascreed LI - Quick Drying Mastic Asphalt Screed Solution for Flat Roofs & Walkways - Roof screed

Verified 4 days ago

IKO UK

IKO Permascreed LI (Light Duty) - 44220000 (Block) / 5422000A (Hot Charge)

Verified 4 days ago

IKO UK

IKO Permascreed LI (Medium Duty) 44200000 (Block) / 54200000 (Hot Charge)

Summary
IKO Permascreed LI quick-drying screed is a next-generation screeding solution that combines exceptional performance with up to 46% lower embodied carbon.
IKO Permascreed LI quick-drying screed is a next-generation screeding solution that combines exceptional performance with up to 46% lower embodied carbon.
Color
Black
Black
Material
Bitumen, Limestone, Aggregate
Bitumen, Limestone, Aggregate
Height
Bespoke
Bespoke

Specification

Fine aggregate
Required.
Required.
Admixture
Selected bitumens and limestone filler.
Selected bitumens and limestone filler.

Additional properties

Thickness range
Typical thickness of an individual layer: 10 mm to 25 mm. Can be installed in multiple layers as necessary to achieve the desired drainage falls or surface level.
Typical thickness of an individual layer: 20 mm to 40 mm. Can be installed in multiple layers as necessary to achieve the desired drainage falls or surface level.
Usage
Flat roofs and walkways.
Flat roofs and walkways.
Handling
Supplied directly to the site in purpose-built hot charge transporters capable of holding up to 18 tonnes of material. It is also available in block form for re-melting on-site.
Supplied directly to the site in purpose-built hot charge transporters capable of holding up to 18 tonnes of material. It is also available in block form for re-melting on-site.
Vapour resistivity
Not less than 100,000 MN/g.
Not less than 100,000 MN/g.
Drying time
Cools very fast and can normally be trafficked within the same day.
Cools very fast and can normally be trafficked within the same day.

Sustainability data

Contains Red List materials
No
No
Country of material origin
United Kingdom
United Kingdom
Country of product manufacture
United Kingdom
United Kingdom
Manufacturing plant location
Prospect Quarry, Grangemill, Matlock DE4 4BW, UK
Prospect Quarry, Grangemill, Matlock DE4 4BW, UK
Material
Bitumen, Limestone, Aggregate
Bitumen, Limestone, Aggregate