Used to produce bonded, unbonded and floating screeds for internal locations. It can also be used for large repairs to existing cement/sand screeds. Suitable for situations where early foot traffic and rapid hardening is required.
Used to produce bonded, unbonded and floating screeds for internal locations. It can also be used for large repairs to existing cement/sand screeds. Suitable for situations where early foot traffic and rapid hardening is required.
A special cement used in place of Portland Cement in cement: sand screeds for producing a rapid setting and drying floor screed that can be used as a bonded screed, an unbonded floor screed laid onto a membrane, or a floating screed laid onto compressive quilt or insulation material. It will be dry after 24 hours at 20°C to receive floor finishes, regardless of thickness.
Features and benefits:
Screed thickness:
The following thicknesses are recommended for screeds using ARDEX A 35:
Mix proportions:
A special cement used in place of Portland Cement in cement: sand screeds for producing a rapid setting and drying floor screed that can be used as a bonded screed, an unbonded floor screed laid onto a membrane, or a floating screed laid onto compressive quilt or insulation material. It will be dry after 24 hours at 20°C to receive floor finishes, regardless of thickness.
Features and benefits:
Screed thickness:
The following thicknesses are recommended for screeds using ARDEX A 35:
Mix proportions: