by IKO PLC
Wigman Road is a major thoroughfare for city traffic. Built originally of concrete on mud flats by Italian prisoners of war in the 1940’s, the road was subsequently black topped. City engineers have been faced with almost non-stop maintenance ever since, particularly the areas of high stress and areas of relative cracking where the asphalt surfacing passes over the underlying concrete joints. After months of evaluation, IKO Permatrack was selected for over 14,000 linear metres of joint repairs…
Show moreContact IKO PLC by clicking the button below to find out which products were used in this case study.
Portslade Academy - IKO Ultra Prevent
Wythenshawe Hospital - IKO Ultra Prevent and IKO Polimar EC/UV
Westminster Cathedral (Carbon Neutral) - IKO Permaphalt
Replacing the 55,000m2 Roof Area at Euston Station