Mero were contracted to install 12000m2 of our type 5 woodcore panels to open plan offices then a further 1000m2 of our type 6 mineral panel with a factory applied engineered stone tile for the entrance Atria on ground floor.
Contact Mero-Schmidlin (UK) plc by clicking the button below to find out which products were used in this case study.
Newhaven ERF-Control rooms
High rise Residential
Data Centre-Crawley
Data Centre-Chessington.