OVERVIEW
During the construction of the New National Wembley Stadium, Pyramid Builders provided to the main contractor Multiplex Construction UK a fully integrated package that included brickwork, blockwork, stonework, engineering, steel Windposts, firestopping and scaffolding along with the logistical management of all associated deliveries.
CFS manufactured and supplied the steel Windposts used in the construction.
The building was designed with high internal walls. To make these walls stable, Pyramid Builders needed to include Windposts to increase lateral wall stability.
Based on the provided design, CFS provided custom manufactured steel Windposts up to 10m long to restrain the internal walls.
These Windposts are integrated within the block walls.
Contact Construction Fixing Systems by clicking the button below to find out which products were used in this case study.