NBS Source
I'm a manufacturer

This case study is no longer available.

Waterfront Belgrade

OVERVIEW

hopping, dining and entertainment in the new trendy district of Belgrade. Right in the heart of the Serbian capital, on the banks of the Sava, Belgrade Waterfront forms the new urban center of Belgrade this 1.8 million square meter project. This unique district already gives an impression today of the future of modern living. The focus here is on creating a pleasant, functional and elegant space for living and working with numerous leisure activities. Such as shopping centers or restaurants and hotels. 75 different specialty restaurants and an extra large food court produce significant amounts of fatty waste water during daily operations. In the Galerija, a high-performance and safe solution was developed under the world’s largest grease separator system to date in nominal size 50 (max. 50l/s) was also installed. City, country: Belgrade, Serbia Date of completion: 2019 Type(s) of building: Public building, Commercial building, Residential building, Hotel, Gastronomy Product(s): Grease separator EasyClean free Auto Mix & Pump (1 × NS 50, 3 × NS 40, 3 × NS 20, 1 × NS 15, 2 × NS 10), 10 × Lifting station Aqualift F XL

No featured products in this case study

Contact IPS Flow Systems by clicking the button below to find out which products were used in this case study.

More case studies from Free-standing grease separators and converters

View all case studies (1)
Euro Foods Group Headquarters

Euro Foods Group Headquarters