This case study is no longer available —
This project involved the encapsulation of two primary settlement tanks within “bio domes” in order to reduce odours in the surrounding residential area and harvest the methane produced. MasterEmaco N 5200 rapid-setting mortar was used on this project enabling the re-profiled surface to be sufficiently cured within 7 days to receive the coating. Rapid installation and return to service of the applied coating thanks to the combination of MasterTop P660 primer and MasterSeal M 689 coating.
Contact Master Builders Solutions UK Ltd by clicking the button below to find out which products were used in this case study.