OVERVIEW
Background
The client needed a fast track solution to replace an existing cleanroom facility to meet their new process requirements. Speed to market was the key driver without compromising future flexibility, whilst ensuring compliance with their rigorous cleanroom standards and cleaning regimes.
In addition, the existing building structure could not be used to support any of the services supplying the cleanrooms or cleanroom envelope and the cleanroom ceiling had to be walk on allowing access for maintenance.
Brief
BYES required an offsite modular solution that could simply be put together onsite with no construction activity, assemble only. The pre-modularisation had to include factory-formed access ways and cut outs for services and equipment as well as having built in low-level extract ducts
within the modular walls. The modular structure also had to support the distributed services and walk on ceiling. All cleanroom finishes also had to be modulated and manufactured off site, ready to install.
Solution
MIDDAS worked closely with the BYES design team and the end user to provide a virtual modal in BIM which included all services, fitted equipment and user interfaces throughout the complex suite of cleanrooms and support areas. From here MIDDAS modularised the complete facility including walls, ceilings and the integrated structural steel work required to support the services.
Where possible, the modules were kept to standard dimensions however, to ensure a truly modular solution all non-standard size elements were also manufactured off site ready to assemble. The M100 wall system incorporated the return air ducts and provided the framework to support the MIDDAS beams supporting the walk on ceiling and service
M200 Integrated Vision Panels
ROSALIND FRANKLIN LABORATORY, LEAMINGTON SPA
BAYER PHARMACEUTICALS
BUPA CROMWELL HOSPITAL LONDON
OXFORD NANOPORE TECHNOLOGIES, HARWELL SCIENCE & INNOVATION CAMPUS
cGMP Advanced Manufacturing Area for Orthoplastics
Compound Semiconductor Innovation Centre for CSA Catapult
The Compound Semiconductor Facility for IQE
cGMP Global Packing Centre for AstraZeneca