The brief was to replace an existing roof that had reached the end of its serviceable life, with a high performance waterproofing solution and upgrade the insulation in order to meet the University’s energy efficiency policy.
No featured products in this case study
Contact IKO UK by clicking the button below to find out which
products were used in this case study.