by IKO PLC
The brief was to replace an existing roof that had reached the end of its serviceable life, with a high performance waterproofing solution and upgrade the insulation in order to meet the University’s energy efficiency policy.
Contact IKO PLC by clicking the button below to find out which products were used in this case study.
Portslade Academy - IKO Ultra Prevent
Wythenshawe Hospital - IKO Ultra Prevent and IKO Polimar EC/UV
Westminster Cathedral (Carbon Neutral) - IKO Permaphalt
Replacing the 55,000m2 Roof Area at Euston Station