The University of Birmingham's Avon Room was completely refurbished. The refurbishment also included the installation of retractable seating to make better use of the available lecture theatre space. There were 155 seats installed with steps.
Contact CPS Manufacturing Co LLP by clicking the button below to find out which products were used in this case study.
Alexandra Palace Theatre Restoration Seating, Orchestra Pit and Staging
Villa Cross Church of God Prophecy Auditorium Seating
Exeter Cathedral Staging
2012 Olympic Games Media Centre Auditorium Seating and Staging