NBS Source
I'm a manufacturer

This case study is no longer available.

Unit 2, Watchmoor Point

OVERVIEW

metroSTOR designed, manufactured and installed a bespoke metroSTOR PCH Cycle Store that could house the air conditioning units and other plant equipment alongside our Centaur Semi-Vertical bike racks.

No featured products in this case study

Contact urbanspec by clicking the button below to find out which products were used in this case study.

More case studies from urbanspec

View all case studies (15)
Unit 2, Watchmoor Point

Unit 2, Watchmoor Point

West House, Orpington

West House, Orpington

Cathedral Hill Industrial Estate, Guildford

Cathedral Hill Industrial Estate, Guildford

University of Nottingham

University of Nottingham