UltraFloor helps the medicine go down at North London Medical Centre

OVERVIEW

Long-standing UltraFloor customer, Specialist Screed (Flooring) Solutions Ltd have used UltraFloor’s expert subfloor preparation materials at a brand new medical centre in North London.


Background

A new medical centre has recently been built to service the residents of North London. Before the centre could be opened to patients, the floors needed to be primed and levelled in preparation for the flooring installation.


The Challenge

With vulnerable patients using the facilities daily, it was imperative that the new medical centre was a safe, calming and hygienic environment for both visitors and staff. A variety of Polyflor vinyl and skirting were due to be installed across the centre and therefore subfloor preparation materials needed to be suitable to install each of them, without delay.


The Solution

Following a bespoke specification written by UltraFloor’s technical team, Specialist Screed (Flooring) Solutions Ltd used UltraFloor Prime IT Multi-surface Primer and Level IT Two to install a range of Polyflor vinyl’s across the 800sqm medical centre.


Formulated to promote adhesion to all UltraFloor smoothing underlayments, Prime IT Multi-surface Primer reduces pinholing, minimising the risk of costly failures. With a coverage rate of 200sqm at 3:1 dilution, Prime IT Multi-surface Primer is a must-have product for all flooring installation projects.


After the screed had been primed and fully dried, Level IT Two was applied across the new building.


There are many reasons why Level IT Two has become UltraFloor’s most popular floor leveller. Its exceptional flow characteristics make it a very easy material to apply to a variety of subfloors in both commercial and domestic flooring projects. Its low odour formulation means this fantastic all-rounder leveller is equally suited to confined areas, proving particularly popular in the education, health and hospitality sectors.


With a set time of 2.5 hours, Level IT Two can receive bonded floor coverings after just 8 hours, making it an ideal choice for projects with a tight deadline. What’s more, because Level IT Two is available as a two component system, it takes the guesswork out of mixing, reducing site errors and guaranteeing a perfect application every time.

After just a few hours, the various floor coverings were then installed across the medical centre.


Results

The team at Specialist Screed (Flooring) Solutions Ltd began their work at Green Lane Medical Centre in the early part of 2022 and completed the 800sqm project by May 2022. On working with UltraFloor, Riley Goatham, Procurements and Project Co-ordinator at Specialist Screed (Flooring) Solutions Ltd commented: “The products were very good as usual with good technical back up from the UltraFloor team.”

Products featured in this case study

View all products (56)
Level IT Two: High Flow, Two-Component, Smoothing Underlayment

Level IT Two: High Flow, Two-Component, Smoothing Underlayment

More case studies from Instarmac Group plc

View all case studies (38)
MediaCityUK, Manchester

MediaCityUK, Manchester

Bradford City Park

Bradford City Park

UltraScape helps to preserve historic thoroughfare

UltraScape helps to preserve historic thoroughfare

Top Marks for UltraScape at Birmingham University Library!

Top Marks for UltraScape at Birmingham University Library!

More case studies from Smoothing and levelling underlay compounds

View all case studies (33)
UltraFloor makes homeowners dream come true

UltraFloor makes homeowners dream come true

UltraFloor gets an 'A' for effort at Derbyshire School

UltraFloor gets an 'A' for effort at Derbyshire School

UltraFloor set up home at prestigious housing development

UltraFloor set up home at prestigious housing development

Houses of Parliament - London

Houses of Parliament - London