NBS Source
I'm a manufacturer

This case study is no longer available.

Trowbridge County Council Building

OVERVIEW

Prestigious Atrium with Hollow floor factory bonded with a Porcelain tile, air plenum with floor heights of 1100mm. This system was selected by Kier for this project not only did it meet the design intent it also provided reduction in programme and removed costs of a wet install of the tile finish, over 1000m2 .

No featured products in this case study

Contact Mero-Schmidlin (UK) plc by clicking the button below to find out which products were used in this case study.