Prestigious Atrium with Hollow floor factory bonded with a Porcelain tile, air plenum with floor heights of 1100mm. This system was selected by Kier for this project not only did it meet the design intent it also provided reduction in programme and removed costs of a wet install of the tile finish, over 1000m2 .
No featured products in this case study
Contact Mero-Schmidlin (UK) plc by clicking the button below to find out which
products were used in this case study.