A timber frame structure requires the floor to provide racking to prevent the building from twisting. Meaning the floor needs to be secured to the joists below so the floor can stop twisting. There are 2 ways of installing Lewis Deck in timber frame structures. Firstly is to fix the Lewis Deck down and lose acoustic performance or the second way is to fix a timber deck on top of the timber joists. Lewis is then laid loose on top of the timber with the resilient acoustic strips in between keeping…
Show moreContact CDI Innovative Construction Materials Ltd by clicking the button below to find out which products were used in this case study.
Sinclair Meadows – Zero Carbon Code 6 Housing
Conversion of a Grade II listed building into apartments
Graven Hill self-build ICF houses with concrete upper floors
Redevelopment of Insworke Mill, Lewis Decking used for acoustics and under floor heating