OVERVIEW
BACKGROUND
TTP has operated from Melbourn Science Park for thirty years, but a new facility was needed to bring people together for collaboration as the business has grown. The new buildings would incorporate state-of-the-art labs, offices and manufacturing spaces, but key to the design were a variety of indoor and outdoor workspaces to stimulate TTP’s people to think differently.
BRIEF
The development featured three separate, differently shaped buildings - The Hive, Tech Barn and The
Exchange - that presented design challenges such as curved walls and an open plan layout requiring
acoustic enclosures. Features such as an exposed roof slab, concrete columns and a raised-access floor system to house mechanical ductwork required special design elements to soften the concrete surfaces.
Contact MIDDAS by clicking the button below to find out which products were used in this case study.
ROSALIND FRANKLIN LABORATORY, LEAMINGTON SPA
BAYER PHARMACEUTICALS
BUPA CROMWELL HOSPITAL LONDON
OXFORD NANOPORE TECHNOLOGIES, HARWELL SCIENCE & INNOVATION CAMPUS