NBS Source
I'm a manufacturer

This version of the case study is no longer available. View latest

The revitalization of Marina Palamós

OVERVIEW

Previously renovated in 2005, Marina Palamós is undergoing a profound and ambitious transformation, aimed at considerably enriching the port’s coastal heritage and the quality of its landscape. A project that is designed to improve livability, with spaces that are more shaded, comfortable and wrapped in green. Urbidermis is diving into the project, providing a holistic perspective that addresses lighting, furniture, microarchitecture and vegetation.

No featured products in this case study

Contact Urbidermis / All Urban Ltd by clicking the button below to find out which products were used in this case study.

More case studies from Urbidermis / All Urban Ltd

View all case studies (3)
The Royal Docks: The Regeneration of East London

The Royal Docks: The Regeneration of East London

Green hubs are evolving Barcelona’s urban imagery

Green hubs are evolving Barcelona’s urban imagery

The revitalization of Marina Palamós

The revitalization of Marina Palamós